LEAP-1B Fleet Reliability – Scorecard
Bryan TINKER
Pascal MORLOT
2. 2 / CFM Proprietary Information subject to restrictions on the cover LEAP-1B/ 737 MAX WTT – October8-10, 2024
LEAP-1B Fleet Scorecard (12 month rolling average)
99.95 % On time
departure per 1,000
flight departures
- 99.9 %
- 99.7 %
0.0050 event(s) per
1,000 flight
departures
- 0.020
- 0.010
0.0401 event(s)
per 1,000 flight
hours
- 0.100
- 0.070
0.0020 event(s)
per 1,000 flight
hours
- 0.010
- 0.005
24.0 Person-
hr/engine/yr
- 20
- 17
0.0180 event(s) per
1,000 flight
departures
- 0.100
- 0.050
1626
TAILS
3636
ENGINES
420
SPARES
88
OPERATORS
Total fleet hours/cycles 22,943,532/9,040,934
Fleet hours/cycles per month 985,891/388,506
Fleet Leader hours/cycles 18,232/7,198
[Total rate] [Total rate]
[Total rate]
[Total rate]
[Basic rate]
*Data through August 31st, 2024
[Total MBI]
Key Issues
HPT Stg 1 Blade – Removals increasing due to trailing edge distress. Reduced
inspection interval SB 72-0366 for MENA region. HPT hardware durability
improvement redesign underway. Testing 2024-25; MRO intro 2026; Prod to follow
FuelNozzle Coking – CNRs for replacement of fuel nozzles. Reverse Bleed selected
as Product Improvement. Development & cert testing underway; Cert & Prod 2Q ‘25
Fan Blade Repairs/Limits – Fan Blades sent to repair Shop due to findings on-
wing/in Shop. Criteria/Repair plan developed to address most frequent findings
Combustordistress – Distress seen during MPD BSI. AMM limits being revised. DR
for re-inspection available for most cases. Root cause identified : C-seal change
introduction targeted 2Q’25
ODMS False Chip Counts – Repetitive CNRs for false chip counts (no debris/fuzz on
ODMS sensor), mostly due to interference between ignition system and ODMS
system. SB 79-0012 introduced new aluminum air/oil separator for weight saving
with side benefit of electric flux resistance in production 1Q’23
3. 3 / CFM Proprietary Information subject to restrictions on the cover LEAP-1B/ 737 MAX WTT – October8-10, 2024
Fleet Age Chart
TSN Range CSN Range
4. 4 / CFM Proprietary Information subject to restrictions on the cover LEAP-1B/ 737 MAX WTT – October8-10, 2024
In Flight Shut Downs (IFSD) (12 month rolling average)
Cause Status Control Program Corrective Action
Under
Investigation
- 3 turbomachinery failure w/ HPT section distress → Pending engine
induction in Shop for investigation
- 2 Low Oil Pressure indication → Pending hardware investigation at OEM
TBD TBD
OPT Sensor OPT sensors internal failure confirmed (wire broken) TBD
Production process improvement in place
since 2019
Lube Unit
- Quality escape on insufficient housing wall thickness
- Root cause undetermined by investigation – Isolated case
- Affected population removed from service
- N/A
- Production process improvement in place
- N/A
3R Bearing
Closed - Root Cause Analysis completed:
#3R bearing damage at installation in Shop
Shop procedures clarified to prevent
heating #3R inner ring/rollers at
installation, and inspection after assembly
ESM updated
PSS O-ring Closed - PSS O-ring damaged (maintenance) Awareness /
AGB
Roller bearing ovalization suspected – Pending indication in Shop for
investigation
Bearing particles detection by ODMS Roller bearing design improvement – 3Q25
5. 5 / CFM Proprietary Information subject to restrictions on the cover LEAP-1B/ 737 MAX WTT – October8-10, 2024
Aborted Takeoffs (ATO) (12 month rolling average)
Cause Status Control Program Corrective Action
Fuel Pump Relief Closed
CNR for fuel pump relief in place since Sept 2024
EEC SW v7.1 Introduces Improved fuel schedules
(2Q'25)
Reverse Bleed System – planned
2Q’25
Investigation pending
Turbomachinery failure w/ HPT section
distress → Pending engine induction in
Shop for investigation
TBD TBD
6. 6 / CFM Proprietary Information subject to restrictions on the cover LEAP-1B/ 737 MAX WTT – October8-10, 2024
Flight Interruptions (ATB, DIV) (12 month rolling average)
Cause Status Control Program Corrective Action
TCF accelerometer Under investigation
CNR for TCF noise detection and proactive
maintenance under evaluation
TBD
HPC lock ring Root Cause identified N/A
Design change approved
Assembly improvement: production procedure updated /
ESM procedure being updated (MRO shops notified)
Oil Cap O-ring Closed Awareness SB 79-0016 introducing new oil tank cap design
A-Sump silver particles Closed CNR for Silver flakes Production process improvement in place since June 2019
Oil Leak – C Sump
Pending engine induction
in Shop for investigation
TBD TBD
Starter Turbine Seal Distress
Unable to determine primary root cause due to
condition of hardware
TBD
Note: Data does not include interruptions associated with IFSD events
7. 7 / CFM Proprietary Information subject to restrictions on the cover LEAP-1B/ 737 MAX WTT – October8-10, 2024
Engine Removals (12 month rolling average)
Cause Status Control Program Corrective Action
HPT Stage 1 Shroud Closed Diagnostic analytic and CNR for EGT loss SB 72-0218/0303 - P02/P04 Hermetic Shroud
LLP Closed
Closed populations affectedby material Quality
Escape addressed by SBs
/
HPT Stg1 Blade In Region Distress MENA reduced inspection SB 72-0366 issued Hardware redesign in work…planned 2026
Mixer Retainer Closed
Awareness – Damaged at Fuel Nozzle replacement
600 cycles CIS available (with conditions)
Reverse Bleed System – planned 2Q’25 / New mixer
retainer design under evaluation
Low EGT Margin Closed Diagnostic analytic and CNR for EGT loss
New HPT Stage 1 Shroud design to mitigate EBC
spall and associated EGT loss
Top 5 Contributors
8. 8 / CFM Proprietary Information subject to restrictions on the cover LEAP-1B/ 737 MAX WTT – October8-10, 2024
Departure Reliability (D&C) (12 month rolling average)
Top 5 Contributors
Cause Status Control Program Corrective Action
Spurious Fault Closed Follow IFIM when fault appears None
Igniter Under investigation
TBD – recommend providing experience to
CFM
Operator specific ignitor replacement interval
Fan Abradable Secondary Distress / /
ODMS
Fuzz on ODMS sensor
ODMS sensor faults
False chip count
None
None
CNR for false chip count under evaluation
None
None
SB 79-0012 introducing new Air Oil Separator
9. 9 / CFM Proprietary Information subject to restrictions on the cover LEAP-1B/ 737 MAX WTT – October8-10, 2024
Maintenance Burden Index
Person- hours/engine/1000 FH
Cause Maintenance Burden Way forward
CNR: Fuel Nozzle Coking Proactive CNRs recommending set replacement Reverse Bleed System selected as Product Improvement – intro planned 2Q’25
Cat 2 SB: PSS Vacuum, PS3/P3B
Blowout Procedures
Repetitive dry-out procedure of PSS/PS3 system
every 750 hours
PSS heater 3Q’25
Cat 2 SB : HPT Flowpath inspection for
MENA region
Repetitive inspections of HPT flowpath every
150 cycles
Hardware redesign in work… expected2026
Cat 2 SB: TGB Scavenge screen
inspections
Repetitive inspection of screens every 50 hrs
RDS BSI with no findings can clear repetitive inspection after minimum 5750
hours. New design released September2019
MPD
Water wash
CEOD
Engine Change
Service Bulletin
CNR
MB Category MBI Hours
Baseline 9.0
SB 3.5
CNR 3.8
Engine Change 7.6
Total Maintenance
Burden 24.0
10. 10 / CFM Proprietary Informationsubject to restrictions on the cover