Managing the outcome of an ERP deployment is difficult at best. There are many obstacles to
success, the least of which is the basic understanding that accepting an ERP system into a
business is a significant disruptive event. This document describes the processes and activities
involved in deploying ERP. The contributions of a consulting firm can significantly add to the
probability of success. In the newspaper business domain, the successful deployment of an
ERP system not only impacts the backoffice and financial operations, but also the editorial,
advertising and press operations. ERP is a mission critical function of any modern newspaper
and must be treated as such.
Glen B. Alleman
Niwot Ridge Consulting
In Associate With
Nilan–Sanders Associates
Introduction
ERP projects are not IT projects. The IT project management playbook is not a good fit for
an ERP project. IT systems management emphasizes exhaustive requirements definition
and detailed planning. This process however and has never really worked on large scale
IT projects. As a result the IT project management method is poorly suited for ERP
projects.
Thinking of an ERP project as large–scale computer project leads to propositions that
would look ridiculous to a board of directors or a finance person.
n Lets’ spend $2 million, $20 million, maybe even $200 million dollars up front.
n With a risk of 50% to 70% of a partial or total write off.
n If unwilling to write off the investment, you will then have to invest double the original
investment to stay in the game.
n The potential returns could be as high as ten times the original investment.
n The team that will work on this opportunity is exceptionally talented but has a long
history of missing milestones and failing to deliver the business benefits to the
stakeholders.
ERP Projects are New Ventures
The risk profile of the ERP project, fraught with technological, organizational, and business
complexities, resembles a new business venture rather than an IT development project.
The methods used to manage the ERP project should be taken from the Venture
Capitalist playbook not an IT managers playbook.
n Investments must be staged. Capital must be conserved. Cash flows must be assured
before more investment takes place.
n Great care must be taken to see that all participants in the initiative (including
members of the senior management team) share the risk in a way that facilitates
success.
n The composition of the team – the sponsors, consultants, product vendors, IT staff,
and line managers – is of the utmost importance. VC’s usually start with the resumes
when reading a business plan. Who is involved matters more than what the plan is.
ERP as Enterprise Transformation
There are there major processes that make an ERP project significantly different than an
IT project.
n Practical process reengineering – is about replacing historically evolved business
processes with more effective and efficient standard processes. However, ERP starts
with a set of templates. The task of redesigning a process is made easier using these
templates. But if the templates don’t match the desired business process the
temptation to ā€œcustomizeā€ them. This removes much of the benefit originally provided
by the ERP system. And creates and instant legacy system with the same
maintenance and support problems of the previous environment.
n Package approaches to delivering IT capability – with numerous business
advantages. Installing a packaged solution provides many well documented benefits.
One overlooked benefit is the imposition of a discipline on process and software
changes. If the organization is not prepared to accept this discipline, this benefit soon
disappears.
n Shift toward modularity of fundamental business processes – may in the end have the
most significant impact on the organization – the modularization of the organization’s
architectures. There is technical architecture, data architecture, application
architecture, and enterprise process architecture. All of these architectures will be
impacted in some way. Without preparing for this impact the project will soon exhaust
the skills, resources, and patience of the staff, vendors and sponsors.
Types of ERP Implementations
There are there basic types of ERP projects:
n Comprehensive – represents an ambitious implementation approach
n Multi–national company
n Multiple sites
n Full functionality of ERP, the 12 main modules of SAP R/3 for example
n An independently evolved business process
n Scope and level of the business process reengineering is high
n Long deployment process based on module–by–module or full system
implementation.
n $10M expected investment
n Middle of the Road – is mid way between comprehensive and vanilla
n Multiple sites
n Implementation of only core ERP modules, financials, Asset Management, and
Project systems in R/3
n BPR level is significant, but not as extensive as the comprehensive process
n $3M expected investment
n Vanilla – is the least ambitious
n One site
n Small number of users (< 100)
n Core functionality only
n Alignment of the company processes with the ERP process, means no BPR.
n $1–2M expected investment
How to Implement an ERP System
IT projects traditionally use a formal management, development, and deployment process
that emphasizes planning. These processes organize the work into phases seperated by
decision points. The supporters of this approach emphasize that changes made early in
the project is less expensive than changes made late in the project.
This waterfall approach is based on several flawed assumptions:
n It is not humanly possible to execute a planning process so that implementation is
merely a matter of performing the defined tasks.
n Plans for complex systems rarely turn out to be good enough.
n Unanticipated problems are the norm rather than the exception.
n It is not possible to protect against late changes.
n All businesses face late changing competitive environments.
n Windows of business opportunity open and close at the whim of the markets
not the project manager.
n Business usually commit to a plan. By making this commitment, they lose much of
their ability to take advantage of fortuitous developments in the business environment.
n In a financial setting this is the option value of the decision.
n Deferring decisions to take advantage of new information and new
opportunities is rarely taken into account on IT projects. It is vital to the success
of an ERP project.
The Road to Hell is Paved with Good Intentions
These flawed assumptions usually lead to a dysfunctional dynamic that undermines the
effectiveness of the project team. This dysfunctional dynamic takes place in the following
way:
n The client company pretends that it is possible to plan well enough to lay out specific
milestones far in advance and then writes a contract with these milestones in it.
n The vendor pretends that it knows how to meet these milestones in order to win the
business.
Neither party can possibly know what it is pretending to know. Both parties know that, but
each feels compelled to maintain the pretense of good project management. This simply
clogs the communication channels between the projects participants.
Planning in the Presence of Uncertainty
The difficulty of planning in an uncertain environment does not remove the need for
planning – it simply changes its purpose.
n Plan to gain understanding.
n Plan for unanticipated events, this is risk management.
n Don’t take planning too seriously, the original plan is simply a guide to the future it is
not the future.
Avoiding Dysfunction
ERP projects should be thought of and managed as new business ventures.
n Staging – ERP paradox of absorbing the ERP system whole to gain the benefits of
the integration and infrastructure is not a good venture decision. In fact the venture
capitalist would say this is a lousy business opportunity.
n Different businesses have different cash flow requirements
n Investment moves to those businesses that have acceptable or low cash flow
requirements.
n The risk / reward proposition must be reasonable.
n Incentive alignment and risk sharing – among the parties cooperative problem solving
behaviors are not only encouraged they are demanded.
n Vendor and system integrator payments linked to the accomplishment of real
tasks, not milestone dates.
n Senior mangers compensation based on successfully delivering components of
the project.
n No conditional support, every one must have some skin in the game.
Conditional support is the kiss of death for an ERP project. It’s going to get ugly
no matter what happens, so everyone has to be 100% committed.
n These incentive plans must be balanced by common sense.
n People are the key to success – any venture is based on having the right people first.
An ā€œAā€ team with a ā€œBā€ idea is always better than a ā€œBā€ team with an ā€œAā€ idea.
How NSA Can Help
Nilan–Sanders Associates is a small consulting firm with extensive experience in a variety
of software product development and deployment processes. We base our value to our
clients on the simple idea that:
n In an environment of uncertainty, money buys information (it’s the options game all
over again). Knowing something that you did not know before is very valuable when
you are managing a new venture. We are professional information sources. Our role
as consultants is to bring to our clients the not only the latest information, but the
information that will contribute to the successful outcome of the project.
n Anything that interferes with the lines of communications between the ERP team,
vendors, system integrators, and customers of the system will led to less than
acceptable results. Our role is to facilitate these communication links.
n Maintaining an effective problem–solving environment is a critical success factor in all
technology ventures. The creation of detailed plans, even if they are obsolete from the
moment they are published is a skill we provide.
What does not kill me makes me stronger.
— Fredrich Nietsche
ERP has the potential to make an organization stronger. The trick is not to die in the
process.
Resumes
Glen B. Alleman
Glen is an experienced IT consultant with over 15 years of major client management
responsibility in a broad variety of industries. His over 22 years of progressive
responsibility in the design, development, and management of industrial strength
software systems provides a solid foundation for architecting state of the art e-
commerce and business systems. His direct hands-on experience with large–scale
integration environments and business domains include: IT Strategies, object based
system architecture, enterprise application integration, business process
reengineering, and product development strategies.
Glen's extensive program management experience, with multiple concurrent projects
involving hardware, software, multiple sites and legacy business systems integration
forms the basis of a strong business focused on delivering the system, on time and on
budget, which meets the requirements of the client. Glen holds a MBA from the
University of Southern California and a B.S. in Physics from the University of
California, Irvine.
Richard A. Sanders
Rick has a 20 year background in high technology systems and software
development focusing on publishing, multimedia and mission critical IT solutions.
From 1996–99 he was Vice President of Research and Development at SII,
responsible for the technical direction and the development of all products. Rick was
also with SII from 1986 until 1993 starting as the Director of R&D. In 1991, Rick was
chosen to start up SII's Telco Division – a Yellow Pages electronic publishing joint
venture with US–West in Englewood, Colorado.
Rick left SII in 1993 and joined Visionary Corporate Technologies, Inc. in Palo Alto as
a multimedia publishing business developer. In 1994, he became the Vice president
of R&D at American Fundware. In the 1980's, he held positions as manager of
software development at Logicon, Inc. and, later, Harris Corporation. Rick holds a BS
in Computer Sciences and a Masters Degree in Business from the University of
California at Irvine.
Stephan E. Nilan
Steve has 20 plus years experience in high technology marketing and strategic
business planning with a focus on publishing and media, including newspapers, cable
television and the Internet. Prior to forming Nilan–Sanders in 1997 with Rick Sanders,
he was Vice President of Marketing and, later, Vice President of Business
Development at System Integrators, Inc. (SII), a worldwide provider of newspaper
publishing systems. At SII, Steve formed MediaBridge, the Company’s new media
division with a focus on Internet publishing ventures.
Steve was President and co–founder of MediaExpress, a cable television–to–PC
information broadcast service. Steve has also held marketing management positions
with Logicon, Inc., Harris Corporation and Unify Corporation. He holds a BA from
Villanova University and an MBA from Iona College.

More Related Content

What's hot (20)

PDF
Building the perfect schedule (v6)
Glen Alleman
Ā 
PDF
Immutable principles of project management (utah pmi)(v1)(no exercise)
Glen Alleman
Ā 
PDF
Focus on the nine I's (v9)
Glen Alleman
Ā 
DOCX
Risk Management Guidance
Glen Alleman
Ā 
PDF
A Guide for Capital Project Mamnagers
Glen Alleman
Ā 
DOCX
Continuous Risk Management
Glen Alleman
Ā 
PDF
Earned Value Management Meets Big Data
Glen Alleman
Ā 
PDF
5 immutable principles and 5 processes in 60 seconds
Glen Alleman
Ā 
DOCX
Managing Risk as Opportunity
Glen Alleman
Ā 
PPTX
Risk adjusted engineering management
Glen Alleman
Ā 
PPTX
From WBS to Integrated Master Schedule
Glen Alleman
Ā 
PDF
Deliverables based planning handbook
Glen Alleman
Ā 
PDF
Capabilities based planning
Glen Alleman
Ā 
PDF
EVM+Agile the darkside
Glen Alleman
Ā 
PDF
Five immutable principles
Glen Alleman
Ā 
PDF
Forecasting cost and schedule performance
Glen Alleman
Ā 
PDF
Probabilistic Schedule and Cost Analysis
Glen Alleman
Ā 
PDF
The 5 Immutable principles of project management
Glen Alleman
Ā 
PDF
Probabilistic Risk Management (With Notes)
Glen Alleman
Ā 
PDF
Assessing Enterprise Project Risk
Glen Alleman
Ā 
Building the perfect schedule (v6)
Glen Alleman
Ā 
Immutable principles of project management (utah pmi)(v1)(no exercise)
Glen Alleman
Ā 
Focus on the nine I's (v9)
Glen Alleman
Ā 
Risk Management Guidance
Glen Alleman
Ā 
A Guide for Capital Project Mamnagers
Glen Alleman
Ā 
Continuous Risk Management
Glen Alleman
Ā 
Earned Value Management Meets Big Data
Glen Alleman
Ā 
5 immutable principles and 5 processes in 60 seconds
Glen Alleman
Ā 
Managing Risk as Opportunity
Glen Alleman
Ā 
Risk adjusted engineering management
Glen Alleman
Ā 
From WBS to Integrated Master Schedule
Glen Alleman
Ā 
Deliverables based planning handbook
Glen Alleman
Ā 
Capabilities based planning
Glen Alleman
Ā 
EVM+Agile the darkside
Glen Alleman
Ā 
Five immutable principles
Glen Alleman
Ā 
Forecasting cost and schedule performance
Glen Alleman
Ā 
Probabilistic Schedule and Cost Analysis
Glen Alleman
Ā 
The 5 Immutable principles of project management
Glen Alleman
Ā 
Probabilistic Risk Management (With Notes)
Glen Alleman
Ā 
Assessing Enterprise Project Risk
Glen Alleman
Ā 

Similar to Managing the Deployment of ERP (20)

PDF
Beating the ERP Implementation Odds
Pradeep Shakespeare, MBA, CGMA, ACMA
Ā 
PPTX
Top 6 Factors for ERP Success
Casey Cramer
Ā 
PDF
Erp implementation as a project
Faysal Ahmed
Ā 
PDF
Erp implementation lifecycle
Sweta Kumari Barnwal
Ā 
PPTX
Starting the ERP Discsussion
Barry Cole
Ā 
PDF
Project report erp success
Surajeet Singh
Ā 
PDF
Erp presentation
jan aljan
Ā 
PDF
ERP FAQ_ Frequently Asked Questions About ERP.pdf
Pridesys IT Ltd.
Ā 
PDF
ERP
Ishaan Gupta
Ā 
PDF
Whitepaper: Integrating People and Technology
Tolero Solutions
Ā 
PDF
ERP Investment Business Impact and Productivity Measures
Baker Khader Abdallah, PMP
Ā 
PDF
ERP - it's not (only) about IT
Dina Beer
Ā 
DOC
ERP Software Tips
Sanganak Technologies
Ā 
PDF
ERP implementation A Complete Guide
Ijaz Haider Malik TOGAF, Harvard MM,Siebel, PRINCE2
Ā 
PDF
ERP Implementation A Complete Guide
guest42d52b7c
Ā 
PDF
4. Expectation And Reality In Erp Implementation Consultant And Solution Prov...
Donovan Mulder
Ā 
PPT
Erp Selection, Design, And Implementation Support
Chuck Papageorgiou
Ā 
PPTX
Bharat
Bharat Razdan
Ā 
PDF
Why Erp Implementations Fail
PhilKeet
Ā 
PDF
Introduction to ERP Systems
Bilal Shaikh
Ā 
Beating the ERP Implementation Odds
Pradeep Shakespeare, MBA, CGMA, ACMA
Ā 
Top 6 Factors for ERP Success
Casey Cramer
Ā 
Erp implementation as a project
Faysal Ahmed
Ā 
Erp implementation lifecycle
Sweta Kumari Barnwal
Ā 
Starting the ERP Discsussion
Barry Cole
Ā 
Project report erp success
Surajeet Singh
Ā 
Erp presentation
jan aljan
Ā 
ERP FAQ_ Frequently Asked Questions About ERP.pdf
Pridesys IT Ltd.
Ā 
Whitepaper: Integrating People and Technology
Tolero Solutions
Ā 
ERP Investment Business Impact and Productivity Measures
Baker Khader Abdallah, PMP
Ā 
ERP - it's not (only) about IT
Dina Beer
Ā 
ERP Software Tips
Sanganak Technologies
Ā 
ERP implementation A Complete Guide
Ijaz Haider Malik TOGAF, Harvard MM,Siebel, PRINCE2
Ā 
ERP Implementation A Complete Guide
guest42d52b7c
Ā 
4. Expectation And Reality In Erp Implementation Consultant And Solution Prov...
Donovan Mulder
Ā 
Erp Selection, Design, And Implementation Support
Chuck Papageorgiou
Ā 
Bharat
Bharat Razdan
Ā 
Why Erp Implementations Fail
PhilKeet
Ā 
Introduction to ERP Systems
Bilal Shaikh
Ā 
Ad

More from Glen Alleman (20)

PDF
Managing risk with deliverables planning
Glen Alleman
Ā 
PDF
A Gentle Introduction to the IMP/IMS
Glen Alleman
Ā 
PDF
Increasing the Probability of Project Success
Glen Alleman
Ā 
PDF
Practices of risk management
Glen Alleman
Ā 
PDF
Principles of Risk Management
Glen Alleman
Ā 
PDF
Deliverables Based Planning, PMBOKĀ® and 5 Immutable Principles of Project Suc...
Glen Alleman
Ā 
PDF
From Principles to Strategies for Systems Engineering
Glen Alleman
Ā 
PDF
NAVAIR Integrated Master Schedule Guide guide
Glen Alleman
Ā 
PDF
Building a Credible Performance Measurement Baseline
Glen Alleman
Ā 
PDF
Integrated master plan methodology (v2)
Glen Alleman
Ā 
PDF
IMP / IMS Step by Step
Glen Alleman
Ā 
PDF
DHS - Using functions points to estimate agile development programs (v2)
Glen Alleman
Ā 
PDF
Making the impossible possible
Glen Alleman
Ā 
PDF
Heliotropic Abundance
Glen Alleman
Ā 
PDF
Process Flow and Narrative for Agile
Glen Alleman
Ā 
PDF
Building the Performance Measurement Baseline
Glen Alleman
Ā 
PPTX
Program Management Office Lean Software Development and Six Sigma
Glen Alleman
Ā 
PDF
Policy and Procedure Rollout
Glen Alleman
Ā 
PDF
Integrated Master Plan Development
Glen Alleman
Ā 
PDF
Project Management Theory
Glen Alleman
Ā 
Managing risk with deliverables planning
Glen Alleman
Ā 
A Gentle Introduction to the IMP/IMS
Glen Alleman
Ā 
Increasing the Probability of Project Success
Glen Alleman
Ā 
Practices of risk management
Glen Alleman
Ā 
Principles of Risk Management
Glen Alleman
Ā 
Deliverables Based Planning, PMBOKĀ® and 5 Immutable Principles of Project Suc...
Glen Alleman
Ā 
From Principles to Strategies for Systems Engineering
Glen Alleman
Ā 
NAVAIR Integrated Master Schedule Guide guide
Glen Alleman
Ā 
Building a Credible Performance Measurement Baseline
Glen Alleman
Ā 
Integrated master plan methodology (v2)
Glen Alleman
Ā 
IMP / IMS Step by Step
Glen Alleman
Ā 
DHS - Using functions points to estimate agile development programs (v2)
Glen Alleman
Ā 
Making the impossible possible
Glen Alleman
Ā 
Heliotropic Abundance
Glen Alleman
Ā 
Process Flow and Narrative for Agile
Glen Alleman
Ā 
Building the Performance Measurement Baseline
Glen Alleman
Ā 
Program Management Office Lean Software Development and Six Sigma
Glen Alleman
Ā 
Policy and Procedure Rollout
Glen Alleman
Ā 
Integrated Master Plan Development
Glen Alleman
Ā 
Project Management Theory
Glen Alleman
Ā 
Ad

Recently uploaded (20)

PDF
Dev Dives: Accelerating agentic automation with Autopilot for Everyone
UiPathCommunity
Ā 
PDF
Book industry state of the nation 2025 - Tech Forum 2025
BookNet Canada
Ā 
PDF
Peak of Data & AI Encore AI-Enhanced Workflows for the Real World
Safe Software
Ā 
PPTX
Manual Testing for Accessibility Enhancement
Julia Undeutsch
Ā 
PDF
ā€œComputer Vision at Sea: Automated Fish Tracking for Sustainable Fishing,ā€ a ...
Edge AI and Vision Alliance
Ā 
PPTX
CapCut Pro PC Crack Latest Version Free Free
josanj305
Ā 
PDF
Linux schedulers for fun and profit with SchedKit
Alessio Biancalana
Ā 
PDF
NASA A Researcher’s Guide to International Space Station : Earth Observations
Dr. PANKAJ DHUSSA
Ā 
PDF
Kit-Works Team Study_20250627_ķ•œė‹¬ė§Œģ—ė§Œė“ ģ‚¬ė‚“ģ„œė¹„ģŠ¤ķ‚¤ė§(ģ–‘ė‹¤ģœ—).pdf
Wonjun Hwang
Ā 
PDF
99 Bottles of Trust on the Wall — Operational Principles for Trust in Cyber C...
treyka
Ā 
PPTX
Securing Model Context Protocol with Keycloak: AuthN/AuthZ for MCP Servers
Hitachi, Ltd. OSS Solution Center.
Ā 
PDF
Software Development Company Keene Systems, Inc (1).pdf
Custom Software Development Company | Keene Systems, Inc.
Ā 
PDF
UiPath DevConnect 2025: Agentic Automation Community User Group Meeting
DianaGray10
Ā 
PPTX
Digital Circuits, important subject in CS
contactparinay1
Ā 
PDF
Modern Decentralized Application Architectures.pdf
Kalema Edgar
Ā 
PDF
Automating Feature Enrichment and Station Creation in Natural Gas Utility Net...
Safe Software
Ā 
PDF
ICONIQ State of AI Report 2025 - The Builder's Playbook
Razin Mustafiz
Ā 
PPTX
The Project Compass - GDG on Campus MSIT
dscmsitkol
Ā 
PDF
Transforming Utility Networks: Large-scale Data Migrations with FME
Safe Software
Ā 
PDF
Survival Models: Proper Scoring Rule and Stochastic Optimization with Competi...
Paris Women in Machine Learning and Data Science
Ā 
Dev Dives: Accelerating agentic automation with Autopilot for Everyone
UiPathCommunity
Ā 
Book industry state of the nation 2025 - Tech Forum 2025
BookNet Canada
Ā 
Peak of Data & AI Encore AI-Enhanced Workflows for the Real World
Safe Software
Ā 
Manual Testing for Accessibility Enhancement
Julia Undeutsch
Ā 
ā€œComputer Vision at Sea: Automated Fish Tracking for Sustainable Fishing,ā€ a ...
Edge AI and Vision Alliance
Ā 
CapCut Pro PC Crack Latest Version Free Free
josanj305
Ā 
Linux schedulers for fun and profit with SchedKit
Alessio Biancalana
Ā 
NASA A Researcher’s Guide to International Space Station : Earth Observations
Dr. PANKAJ DHUSSA
Ā 
Kit-Works Team Study_20250627_ķ•œė‹¬ė§Œģ—ė§Œė“ ģ‚¬ė‚“ģ„œė¹„ģŠ¤ķ‚¤ė§(ģ–‘ė‹¤ģœ—).pdf
Wonjun Hwang
Ā 
99 Bottles of Trust on the Wall — Operational Principles for Trust in Cyber C...
treyka
Ā 
Securing Model Context Protocol with Keycloak: AuthN/AuthZ for MCP Servers
Hitachi, Ltd. OSS Solution Center.
Ā 
Software Development Company Keene Systems, Inc (1).pdf
Custom Software Development Company | Keene Systems, Inc.
Ā 
UiPath DevConnect 2025: Agentic Automation Community User Group Meeting
DianaGray10
Ā 
Digital Circuits, important subject in CS
contactparinay1
Ā 
Modern Decentralized Application Architectures.pdf
Kalema Edgar
Ā 
Automating Feature Enrichment and Station Creation in Natural Gas Utility Net...
Safe Software
Ā 
ICONIQ State of AI Report 2025 - The Builder's Playbook
Razin Mustafiz
Ā 
The Project Compass - GDG on Campus MSIT
dscmsitkol
Ā 
Transforming Utility Networks: Large-scale Data Migrations with FME
Safe Software
Ā 
Survival Models: Proper Scoring Rule and Stochastic Optimization with Competi...
Paris Women in Machine Learning and Data Science
Ā 

Managing the Deployment of ERP

  • 1. Managing the DeploymentManaging the Deployment of ERP Systems in theof ERP Systems in the Publishing DomainPublishing Domain ControllingtheoutcomeofERP Projects. Managing the outcome of an ERP deployment is difficult at best. There are many obstacles to success, the least of which is the basic understanding that accepting an ERP system into a business is a significant disruptive event. This document describes the processes and activities involved in deploying ERP. The contributions of a consulting firm can significantly add to the probability of success. In the newspaper business domain, the successful deployment of an ERP system not only impacts the backoffice and financial operations, but also the editorial, advertising and press operations. ERP is a mission critical function of any modern newspaper and must be treated as such. Glen B. Alleman Niwot Ridge Consulting In Associate With Nilan–Sanders Associates
  • 2. Introduction ERP projects are not IT projects. The IT project management playbook is not a good fit for an ERP project. IT systems management emphasizes exhaustive requirements definition and detailed planning. This process however and has never really worked on large scale IT projects. As a result the IT project management method is poorly suited for ERP projects. Thinking of an ERP project as large–scale computer project leads to propositions that would look ridiculous to a board of directors or a finance person. n Lets’ spend $2 million, $20 million, maybe even $200 million dollars up front. n With a risk of 50% to 70% of a partial or total write off. n If unwilling to write off the investment, you will then have to invest double the original investment to stay in the game. n The potential returns could be as high as ten times the original investment. n The team that will work on this opportunity is exceptionally talented but has a long history of missing milestones and failing to deliver the business benefits to the stakeholders. ERP Projects are New Ventures The risk profile of the ERP project, fraught with technological, organizational, and business complexities, resembles a new business venture rather than an IT development project. The methods used to manage the ERP project should be taken from the Venture Capitalist playbook not an IT managers playbook. n Investments must be staged. Capital must be conserved. Cash flows must be assured before more investment takes place. n Great care must be taken to see that all participants in the initiative (including members of the senior management team) share the risk in a way that facilitates success. n The composition of the team – the sponsors, consultants, product vendors, IT staff, and line managers – is of the utmost importance. VC’s usually start with the resumes when reading a business plan. Who is involved matters more than what the plan is. ERP as Enterprise Transformation There are there major processes that make an ERP project significantly different than an IT project. n Practical process reengineering – is about replacing historically evolved business processes with more effective and efficient standard processes. However, ERP starts with a set of templates. The task of redesigning a process is made easier using these templates. But if the templates don’t match the desired business process the temptation to ā€œcustomizeā€ them. This removes much of the benefit originally provided by the ERP system. And creates and instant legacy system with the same maintenance and support problems of the previous environment. n Package approaches to delivering IT capability – with numerous business advantages. Installing a packaged solution provides many well documented benefits.
  • 3. One overlooked benefit is the imposition of a discipline on process and software changes. If the organization is not prepared to accept this discipline, this benefit soon disappears. n Shift toward modularity of fundamental business processes – may in the end have the most significant impact on the organization – the modularization of the organization’s architectures. There is technical architecture, data architecture, application architecture, and enterprise process architecture. All of these architectures will be impacted in some way. Without preparing for this impact the project will soon exhaust the skills, resources, and patience of the staff, vendors and sponsors. Types of ERP Implementations There are there basic types of ERP projects: n Comprehensive – represents an ambitious implementation approach n Multi–national company n Multiple sites n Full functionality of ERP, the 12 main modules of SAP R/3 for example n An independently evolved business process n Scope and level of the business process reengineering is high n Long deployment process based on module–by–module or full system implementation. n $10M expected investment n Middle of the Road – is mid way between comprehensive and vanilla n Multiple sites n Implementation of only core ERP modules, financials, Asset Management, and Project systems in R/3 n BPR level is significant, but not as extensive as the comprehensive process n $3M expected investment n Vanilla – is the least ambitious n One site n Small number of users (< 100) n Core functionality only n Alignment of the company processes with the ERP process, means no BPR. n $1–2M expected investment How to Implement an ERP System IT projects traditionally use a formal management, development, and deployment process that emphasizes planning. These processes organize the work into phases seperated by decision points. The supporters of this approach emphasize that changes made early in the project is less expensive than changes made late in the project. This waterfall approach is based on several flawed assumptions:
  • 4. n It is not humanly possible to execute a planning process so that implementation is merely a matter of performing the defined tasks. n Plans for complex systems rarely turn out to be good enough. n Unanticipated problems are the norm rather than the exception. n It is not possible to protect against late changes. n All businesses face late changing competitive environments. n Windows of business opportunity open and close at the whim of the markets not the project manager. n Business usually commit to a plan. By making this commitment, they lose much of their ability to take advantage of fortuitous developments in the business environment. n In a financial setting this is the option value of the decision. n Deferring decisions to take advantage of new information and new opportunities is rarely taken into account on IT projects. It is vital to the success of an ERP project. The Road to Hell is Paved with Good Intentions These flawed assumptions usually lead to a dysfunctional dynamic that undermines the effectiveness of the project team. This dysfunctional dynamic takes place in the following way: n The client company pretends that it is possible to plan well enough to lay out specific milestones far in advance and then writes a contract with these milestones in it. n The vendor pretends that it knows how to meet these milestones in order to win the business. Neither party can possibly know what it is pretending to know. Both parties know that, but each feels compelled to maintain the pretense of good project management. This simply clogs the communication channels between the projects participants. Planning in the Presence of Uncertainty The difficulty of planning in an uncertain environment does not remove the need for planning – it simply changes its purpose. n Plan to gain understanding. n Plan for unanticipated events, this is risk management. n Don’t take planning too seriously, the original plan is simply a guide to the future it is not the future. Avoiding Dysfunction ERP projects should be thought of and managed as new business ventures. n Staging – ERP paradox of absorbing the ERP system whole to gain the benefits of the integration and infrastructure is not a good venture decision. In fact the venture capitalist would say this is a lousy business opportunity. n Different businesses have different cash flow requirements
  • 5. n Investment moves to those businesses that have acceptable or low cash flow requirements. n The risk / reward proposition must be reasonable. n Incentive alignment and risk sharing – among the parties cooperative problem solving behaviors are not only encouraged they are demanded. n Vendor and system integrator payments linked to the accomplishment of real tasks, not milestone dates. n Senior mangers compensation based on successfully delivering components of the project. n No conditional support, every one must have some skin in the game. Conditional support is the kiss of death for an ERP project. It’s going to get ugly no matter what happens, so everyone has to be 100% committed. n These incentive plans must be balanced by common sense. n People are the key to success – any venture is based on having the right people first. An ā€œAā€ team with a ā€œBā€ idea is always better than a ā€œBā€ team with an ā€œAā€ idea. How NSA Can Help Nilan–Sanders Associates is a small consulting firm with extensive experience in a variety of software product development and deployment processes. We base our value to our clients on the simple idea that: n In an environment of uncertainty, money buys information (it’s the options game all over again). Knowing something that you did not know before is very valuable when you are managing a new venture. We are professional information sources. Our role as consultants is to bring to our clients the not only the latest information, but the information that will contribute to the successful outcome of the project. n Anything that interferes with the lines of communications between the ERP team, vendors, system integrators, and customers of the system will led to less than acceptable results. Our role is to facilitate these communication links. n Maintaining an effective problem–solving environment is a critical success factor in all technology ventures. The creation of detailed plans, even if they are obsolete from the moment they are published is a skill we provide. What does not kill me makes me stronger. — Fredrich Nietsche ERP has the potential to make an organization stronger. The trick is not to die in the process.
  • 6. Resumes Glen B. Alleman Glen is an experienced IT consultant with over 15 years of major client management responsibility in a broad variety of industries. His over 22 years of progressive responsibility in the design, development, and management of industrial strength software systems provides a solid foundation for architecting state of the art e- commerce and business systems. His direct hands-on experience with large–scale integration environments and business domains include: IT Strategies, object based system architecture, enterprise application integration, business process reengineering, and product development strategies. Glen's extensive program management experience, with multiple concurrent projects involving hardware, software, multiple sites and legacy business systems integration forms the basis of a strong business focused on delivering the system, on time and on budget, which meets the requirements of the client. Glen holds a MBA from the University of Southern California and a B.S. in Physics from the University of California, Irvine. Richard A. Sanders Rick has a 20 year background in high technology systems and software development focusing on publishing, multimedia and mission critical IT solutions. From 1996–99 he was Vice President of Research and Development at SII, responsible for the technical direction and the development of all products. Rick was also with SII from 1986 until 1993 starting as the Director of R&D. In 1991, Rick was chosen to start up SII's Telco Division – a Yellow Pages electronic publishing joint venture with US–West in Englewood, Colorado. Rick left SII in 1993 and joined Visionary Corporate Technologies, Inc. in Palo Alto as a multimedia publishing business developer. In 1994, he became the Vice president of R&D at American Fundware. In the 1980's, he held positions as manager of software development at Logicon, Inc. and, later, Harris Corporation. Rick holds a BS in Computer Sciences and a Masters Degree in Business from the University of California at Irvine. Stephan E. Nilan Steve has 20 plus years experience in high technology marketing and strategic business planning with a focus on publishing and media, including newspapers, cable television and the Internet. Prior to forming Nilan–Sanders in 1997 with Rick Sanders, he was Vice President of Marketing and, later, Vice President of Business Development at System Integrators, Inc. (SII), a worldwide provider of newspaper publishing systems. At SII, Steve formed MediaBridge, the Company’s new media division with a focus on Internet publishing ventures. Steve was President and co–founder of MediaExpress, a cable television–to–PC information broadcast service. Steve has also held marketing management positions with Logicon, Inc., Harris Corporation and Unify Corporation. He holds a BA from Villanova University and an MBA from Iona College.