WIP- Discrete Job Creation Process (Manual)
Production
Identify the
item to Build
Standard
Assembly
?
Select BOM and
Routing
Enter Assembly
and Quantity
Attach a
document if
required
NOYES
Determine
the Job
Number
Create
Discrete Job
Select type
as
‘Standard’
Select type
as ‘Non
Standard’
Release a
Discrete Job
Create Discrete Job
 Overview
• Discrete jobs may be created from Planner Workbench through the WIP Mass Interface, or
they may be created using the Discrete Job form.
• Non-standard discrete jobs for repair, engineering prototypes, and released new build jobs
using optional bills of materials or routings may be created using the Discrete Job form.
• A standard job is for items that have a standard released bill of material.
• Non-standard jobs are more flexible than standard jobs. They can be used for rework, field
service repair, upgrades, disassembly, maintenance engineering prototypes, and other
miscellaneous projects
• For a standard job, if a primary BOM and/or routing exist for the assembly they will be
defaulted. You can also enter an alternate BOM and/or routing.
• You can attach illustrative or explanatory files-in the form of text, images, word processing
documents, spreadsheets, video, etc. to discrete jobs.
• Change the Status on the job from Unreleased to Released.
Modify Discrete Job
 Overview:
• You can change discrete jobs using the Discrete Jobs and Discrete Jobs Summary windows.
• What We Can Change?
 Date changes: For date changes, it is only necessary to change either the start date or the
completion date. If the start date is changed, the system will forward schedule and
recalculate the completion date. If the completion date is changed, the system will
backward schedule and recalculate the start date. These changes can be made through the
Define Discrete Job form.
 Quantity changes: Quantity changes can be done with no restrictions if the job is unreleased.
You can also increase the quantity as a job is released. If the job is released and work has
begun on the assembly, you cannot decrease the job quantity lower than the number of
assemblies that have already passed the Queue intraoperation step of the first operation. If
a sales order is linked to the job, you cannot decrease the job quantity lower than the order
quantity.
 Comments: The text of one-time comments can be amended. Standard comments can
either be added or deleted.
Modify Discrete Job
 Status: Jobs can have the following statuses: Unreleased, Released, Complete - Charges
Allowed, Complete - No Charges Allowed, On Hold, and Cancelled.
 Firm: Unreleased schedules or jobs may be firmed to prevent MRP date changes from being
reflected automatically on the schedule or job.
Note: Changes cannot be made on components and operations in the Discrete Job form.
WIP-Component Issue Process
Production
Stores
Identify Discrete
Job
Pending
Material
Requirement
?
Print Move Order
Pick Slip
Run ‘Component
Pick Release’
View and allocate
material
YES
Check the
material
requirement
Transact Move
Order
WIP-Change Material Requirement Process
Production
Planning
Check Discrete Job
for which additional
material required
Query discrete job
where changes are
required
Identify the changes in
item/Quantity/dates/
comments/status/firm
fields
Enter and Save the
changes
Open Material
Requirement form
Modify Material Requirement
 Once a discrete job has been created you may modify material requirements if they differ
from the BOM. You may also use this form to add requirements for a non-standard discrete
job.
 This responsibility is majorly provided to Planner or Shop Floor In charge as this will cause
audit issue when “ Require Qty in BOM V/S Actual Consumption” is calculated.
Caution:
• Major changes in the Material Requirement are done through BOM revision.
• Change the material requirement when the Job is in ‘Release or Un-release’ State
• Changes in material requirement after JOB completion may cause variance.
WIP-Move Transaction Process
(Inter-Operation Moves)
Operation 10 QUEUE
QUEUEOperation 20
RUN TO MOVE REJECT SCRAP
RUN TO MOVE REJECT SCRAP
Operation 30
QUEUE RUN TO MOVE REJECT SCRAP
Operation N
WIP-Move Transaction Process
(Intra-Operation Moves)
Operation 10 QUEUE
QUEUEOperation 20
RUN TO MOVE REJECT SCRAP
RUN TO MOVE REJECT SCRAP
Operation 30
QUEUE RUN TO MOVE REJECT SCRAP
Operation N
Move Transaction
 Overview:
 Using the Move Transactions form, you can move the assemblies you are building from one
operation and/or intraoperation step to another.
 You can move assemblies forward and backward within and between operations.
 Moving assemblies into the To Move, Reject, or Scrap intraoperation step of an operation
completes those assemblies at that operation.
 When assemblies are completed at an operation, the system automatically backflushes
Operation Pull components and charges resources.
 Interoperation Moves: Moving assemblies from one operation to another is an interoperation
move. Moves usually follow the forward sequence defined by the routing, but you can move
assemblies from any operation to any other, even preceding operations.
 Intraoperation Moves: Moving assemblies from one intraoperation step of an operation to
another intraoperation step of the same operation is an intraoperation move. You can move
assemblies from any enabled intraoperation step, (Queue, Run, To move, Reject, or Scrap), as
required.
Things to Check
 View Pending Jobs
 Use the Pending Jobs and Schedules form to view, update, delete, and resubmit records that
have failed validation and remain in the Open Job and Schedule Interface table.
 You cannot close a job if pending transactions exist. If no pending transactions exist on a job
then the results of the search will return nothing.
Navigate to: Discrete > Pending Jobs and Schedules
 Pending Move Transactions
 You can view, update, delete, and resubmit move transaction records that have failed
validation and remain in the Open Move Transaction Interface table.
 You can view error messages associated with failed records. Error messages can assist you in
updating failed records before resubmission.
Navigate to: Move Transactions > Pending Move Transactions
Things to Check
 Pending Resource Transactions
 You can view, update, delete and resubmit resource transactions that have failed validation or
processing and remain in the Open Resource Transaction Interface table.
 You can view error messages associated with failed records, which can help you in updating
the failed records before resubmission.
 At period close this table should be reviewed prior to closing the period to make sure all
resource transactions have cleared.
Navigate to: Resource Transactions > Pending Resource Transactions
WIP Value Summary
 View A WIP Value Summary
 Use the WIP Value Summary form to view the current value of open and closed jobs.
Navigate to: Discrete > WIP Value Summary
How to Understand the form output:
Periods From/To: This field will display the current period unless you entered a range into the
previous form.
Quantities: This area will display the quantity information related to the discrete job selected.
Cost Element: Displays the cost element associated with the cost information listed.
Account: Displays the account associated with the cost you are viewing.
Cost Incurred: Displays the current cost incurred on the discrete job by element.
Cost Relieved: Displays the current cost relieved on the discrete job by element.
Variances Relieved: Displays the current cost variance relieved on the discrete job by element.
WIP Value Summary
Variance Relieved= Costs Incurred - Costs Relieved
COST INCURRED >> (Production Cost) Term used to indicate the total amount spent to
produce an assembly by using/consuming applicable MATERIALS (sub assembly &
components) & RESOURCES (such as machine, man power, consumables, tools etc.)
COST RELIEVED >> (BOM Cost) Cost or Rate of the assembly item produced by the
manufacturing process, which is defined as Item standard cost at Item Costs form of
costing module
WIP Material Transactions
 When Material Transaction is used:
• Excess material may have been issued in error to a job.
• The bill of materials for an assembly may be incorrect and may call for too many or too few
components.
• A component may have been damaged during assembly and it is decided to issue another
component to the schedule or job, while leaving the damaged component charged to the
schedule or job also.
• Components may be consumed during assembly set-up and it has been decided to leave the loss
charged to the schedule or job and replace the components.
• One WIP supply subinventory may have a short-term oversupply and it may be decided to transfer
the components to another WIP supply subinventory requiring them.
WIP Material Transactions Types
 WIP Material Transaction Types:
• WIP Component Issue-Issues components from inventory to jobs and schedules to fulfill
positive material requirements.
• WIP component Return-Returns components from jobs and schedules to inventory.
• WIP negative component issue-Issues components from jobs and schedules to inventory to
fulfill negative material requirements. (WIP negative component issue is to return material
into stock, material requirement should be – yes)
• WIP negative component return-Returns components to jobs and schedules from inventory
to fulfill negative material requirements. WIP negative component returns reverse WIP
negative component issues.
• Replenishment supply subinventory-Replenishes the supply subinventories of Operation Pull
or Assembly Pull supply type components. This transaction works the same as performing a
subinventory transfer in inventory.
• Inventory sub transfer-Performs a subinventory transfer of one subinventory to another. This
is similar to the replenishment supply subinventory type.
WIP-Complete Discrete Job Process
Production
Check Discrete Job
which needs to be
complete
Pending
Material
Requirement
?
Pending
Move
Transaction
?
Use ‘Completion
Transaction’ and
complete desired
assembly units
Complete move
transaction
Is it a last
operation?
To component
Pick Release
Process
YES
NO NO
YES
YES
NO
Complete Discrete Job
 Overview
• A job must have a status of “Released” in order to have completions transacted against it.
• When the last assembly on the job is completed, Materials or Manufacturing will process
the final completion transaction and change the status of the job to “complete charges
allowed”.
• The job will remain open for a determined amount of time in this state in order to allow for
all appropriate charges to be made against it.
• At the end of that time, Cost Accounting will change the status of the job to “complete no
charges allowed”.
• At the end of the accounting period, Cost Accounting will change the status of all jobs
currently at “complete no charges allowed” to “closed”.
WIP- Discrete Job Close Process
Production
Cost
Accounting
Identify the
Discrete Job
to complete
Is it a
serialized
item ?
Charge the Job
with appropriate
charges
Change the job
status to “
Complete-No
Charge Allowed”
Close Discrete
Job
NO
YESMove assembly
to FG or
Shipping
Enter
completion
data
Enter serial
numbers
Partial
quantity ?
NO
YES
Close Discrete Job
 Overview
• A job must have a status of “Released” in order to complete quantities against it.
• When the last assembly on the job is completed and transacted, Materials or Manufacturing
will change the status of the job to “Complete-Charges Allowed”.
• The job will remain open for a determined amount of time to allow all transactions to be
done against the job and variances to be researched and resolved.
• Materials or Manufacturing will change the status to “Complete-No Charges Allowed”. Cost
Accounting will review all jobs in this status and then close the jobs.

More Related Content

What's hot (20)

PPT
Standard Cost Accounting in Oracle ERP
Larry Sherrod
 
DOCX
Move order types
Shiv Om Mishra
 
PDF
Oracle SCM Functional Interview Questions & Answers - Inventory Module - Part...
Boopathy CS
 
DOCX
Discrete Job Closure Process
Baker Khader Abdallah, PMP
 
PDF
Oracle R12 Inventory – Defining Unit of Measure
Boopathy CS
 
DOCX
How to configure LCM After receiving
Ahmed Elshayeb
 
DOCX
PO Position Hierarchy in R12
parinay jain
 
DOCX
Oracle Purchasing Internal Requisition
Ahmed Elshayeb
 
PPT
Order Line Sets in Oracle Order Management
Bizinsight Consulting Inc
 
PPT
Sla and cost acctg
Beverley Baker-Harris
 
PDF
Oracle Inventory – Types of Move Orders
Boopathy CS
 
DOCX
Elshayeb Expense Subinventory And Items Scenario
Ahmed Elshayeb
 
DOCX
Oracle Ebs Enterprise Asset Management.docx
Mina Lotfy
 
PDF
Oracle R12 Order Management - Back to Back (B2B) Order Flow:
Boopathy CS
 
PDF
Oracle min-max-planning
mgarg82
 
DOCX
Oracle Purchasing R12 Setup Steps
Ahmed Elshayeb
 
PPT
Oracle Applications R12 Sourcing Training
Dharmalingam Kandampalayam Shanmugam
 
PDF
Oracle EBS Currency conversion
Baker Khader Abdallah, PMP
 
PPT
R12 inventory features
Suresh Mishra
 
DOCX
Pick pack and ship confirm process in oracle apps
shravan kumar chelika
 
Standard Cost Accounting in Oracle ERP
Larry Sherrod
 
Move order types
Shiv Om Mishra
 
Oracle SCM Functional Interview Questions & Answers - Inventory Module - Part...
Boopathy CS
 
Discrete Job Closure Process
Baker Khader Abdallah, PMP
 
Oracle R12 Inventory – Defining Unit of Measure
Boopathy CS
 
How to configure LCM After receiving
Ahmed Elshayeb
 
PO Position Hierarchy in R12
parinay jain
 
Oracle Purchasing Internal Requisition
Ahmed Elshayeb
 
Order Line Sets in Oracle Order Management
Bizinsight Consulting Inc
 
Sla and cost acctg
Beverley Baker-Harris
 
Oracle Inventory – Types of Move Orders
Boopathy CS
 
Elshayeb Expense Subinventory And Items Scenario
Ahmed Elshayeb
 
Oracle Ebs Enterprise Asset Management.docx
Mina Lotfy
 
Oracle R12 Order Management - Back to Back (B2B) Order Flow:
Boopathy CS
 
Oracle min-max-planning
mgarg82
 
Oracle Purchasing R12 Setup Steps
Ahmed Elshayeb
 
Oracle Applications R12 Sourcing Training
Dharmalingam Kandampalayam Shanmugam
 
Oracle EBS Currency conversion
Baker Khader Abdallah, PMP
 
R12 inventory features
Suresh Mishra
 
Pick pack and ship confirm process in oracle apps
shravan kumar chelika
 

Viewers also liked (18)

PDF
Cost accounting for Oracle
George Faur
 
PPTX
Bill of material
Bhaskar Das
 
PPTX
Phantom bills of material
Larry Sherrod
 
PPTX
Material Requirement Planning
Pritesh Mogane
 
PPSX
16.bill of material
Subbu Pullela
 
PPTX
Engineering in oracle
Larry Sherrod
 
PPTX
Oracle Configurator Developer
Pritesh Mogane
 
PPTX
Install base
Pritesh Mogane
 
PPTX
Overcoming Order Fulfillment Challenges in Manufacturing, High-Tech & Retail
Capgemini
 
PPTX
Ch02 mis-erp presentation
SR NAIDU
 
PPTX
Food Packaging Technologies Summit
Sonoco
 
PDF
Structural Packaging Summit: Using Consumer Insights to Satisfy the Customer
Sonoco
 
PDF
Sonoco 2Q 2012 Results Presentation
Sonoco
 
PDF
Oracle WIP – Supply Types:
Boopathy CS
 
PPT
Brad Weller_Nando Galazzo Packaging Solutions Presentation Berlin 2001
Brad Weller
 
PDF
1.what is bill of materials
Joko Prasetyo
 
PDF
Technical architecture for order management
Mohit kumar Gupta
 
PDF
Manufacturing Analytics
Nitai Partners Inc
 
Cost accounting for Oracle
George Faur
 
Bill of material
Bhaskar Das
 
Phantom bills of material
Larry Sherrod
 
Material Requirement Planning
Pritesh Mogane
 
16.bill of material
Subbu Pullela
 
Engineering in oracle
Larry Sherrod
 
Oracle Configurator Developer
Pritesh Mogane
 
Install base
Pritesh Mogane
 
Overcoming Order Fulfillment Challenges in Manufacturing, High-Tech & Retail
Capgemini
 
Ch02 mis-erp presentation
SR NAIDU
 
Food Packaging Technologies Summit
Sonoco
 
Structural Packaging Summit: Using Consumer Insights to Satisfy the Customer
Sonoco
 
Sonoco 2Q 2012 Results Presentation
Sonoco
 
Oracle WIP – Supply Types:
Boopathy CS
 
Brad Weller_Nando Galazzo Packaging Solutions Presentation Berlin 2001
Brad Weller
 
1.what is bill of materials
Joko Prasetyo
 
Technical architecture for order management
Mohit kumar Gupta
 
Manufacturing Analytics
Nitai Partners Inc
 
Ad

Similar to Oracle R12 Work In Process (20)

PPT
Oracle_WIP.ppt
YasirAbbas932491
 
PPT
Oracle 11i Work In Process Training Presentation.ppt
appsloader
 
PDF
Ms project2007 quickguide
Jason Koo
 
PDF
Ms project2007 quickguide
성철 박
 
DOC
Closing Work Orders
kalebhanly
 
PPTX
Oracle Manufacturing and bom - Overview.pptx
devarajellikkal
 
PPT
Maintenance Work Orders.ppt
angelosantos795550
 
PPS
What if analysis in talika pms
Manish kumar
 
PPTX
Microsoft Project Foundations Course.pptx
Keshava Prasad, PMP®, CSM®SAFe® Agilist
 
PDF
Wip back flush
DAve Swanson
 
PPT
03 - SAP PM WorkOrder Presentation_EN.ppt
ghkamel
 
PPTX
MICROSOFT PROJECT TUTORIAL
Vismay Shah
 
PPT
Create a new work order in Ibm Maximo
Tony Bertram
 
PPTX
MS Project
Mustafa Sonasath
 
PPT
IIG's Process Manufacturing Solution for Sage 100
Janice Haywood
 
PDF
MS Project Guide.pdf
MuhammadZahidQazi
 
PPTX
MICROSOFT PROJECT
Smit Patel
 
DOCX
Sheet1[Project Name]0Gantt ChartSecurity Network UpgradeTeam BToda.docx
maoanderton
 
PDF
Pswfl
siramc
 
Oracle_WIP.ppt
YasirAbbas932491
 
Oracle 11i Work In Process Training Presentation.ppt
appsloader
 
Ms project2007 quickguide
Jason Koo
 
Ms project2007 quickguide
성철 박
 
Closing Work Orders
kalebhanly
 
Oracle Manufacturing and bom - Overview.pptx
devarajellikkal
 
Maintenance Work Orders.ppt
angelosantos795550
 
What if analysis in talika pms
Manish kumar
 
Microsoft Project Foundations Course.pptx
Keshava Prasad, PMP®, CSM®SAFe® Agilist
 
Wip back flush
DAve Swanson
 
03 - SAP PM WorkOrder Presentation_EN.ppt
ghkamel
 
MICROSOFT PROJECT TUTORIAL
Vismay Shah
 
Create a new work order in Ibm Maximo
Tony Bertram
 
MS Project
Mustafa Sonasath
 
IIG's Process Manufacturing Solution for Sage 100
Janice Haywood
 
MS Project Guide.pdf
MuhammadZahidQazi
 
MICROSOFT PROJECT
Smit Patel
 
Sheet1[Project Name]0Gantt ChartSecurity Network UpgradeTeam BToda.docx
maoanderton
 
Pswfl
siramc
 
Ad

Recently uploaded (20)

PPTX
AUTOMATION AND ROBOTICS IN PHARMA INDUSTRY.pptx
sameeraaabegumm
 
PDF
HubSpot Main Hub: A Unified Growth Platform
Jaswinder Singh
 
PDF
Smart Trailers 2025 Update with History and Overview
Paul Menig
 
PPTX
"Autonomy of LLM Agents: Current State and Future Prospects", Oles` Petriv
Fwdays
 
PDF
Newgen Beyond Frankenstein_Build vs Buy_Digital_version.pdf
darshakparmar
 
PDF
Blockchain Transactions Explained For Everyone
CIFDAQ
 
PDF
Newgen 2022-Forrester Newgen TEI_13 05 2022-The-Total-Economic-Impact-Newgen-...
darshakparmar
 
PPTX
From Sci-Fi to Reality: Exploring AI Evolution
Svetlana Meissner
 
PDF
New from BookNet Canada for 2025: BNC BiblioShare - Tech Forum 2025
BookNet Canada
 
PPTX
AI Penetration Testing Essentials: A Cybersecurity Guide for 2025
defencerabbit Team
 
PDF
"AI Transformation: Directions and Challenges", Pavlo Shaternik
Fwdays
 
PPTX
WooCommerce Workshop: Bring Your Laptop
Laura Hartwig
 
PDF
Mastering Financial Management in Direct Selling
Epixel MLM Software
 
PDF
Bitcoin for Millennials podcast with Bram, Power Laws of Bitcoin
Stephen Perrenod
 
PDF
Using FME to Develop Self-Service CAD Applications for a Major UK Police Force
Safe Software
 
PDF
What Makes Contify’s News API Stand Out: Key Features at a Glance
Contify
 
PDF
Presentation - Vibe Coding The Future of Tech
yanuarsinggih1
 
PDF
NewMind AI - Journal 100 Insights After The 100th Issue
NewMind AI
 
PDF
Transcript: New from BookNet Canada for 2025: BNC BiblioShare - Tech Forum 2025
BookNet Canada
 
PDF
CIFDAQ Token Spotlight for 9th July 2025
CIFDAQ
 
AUTOMATION AND ROBOTICS IN PHARMA INDUSTRY.pptx
sameeraaabegumm
 
HubSpot Main Hub: A Unified Growth Platform
Jaswinder Singh
 
Smart Trailers 2025 Update with History and Overview
Paul Menig
 
"Autonomy of LLM Agents: Current State and Future Prospects", Oles` Petriv
Fwdays
 
Newgen Beyond Frankenstein_Build vs Buy_Digital_version.pdf
darshakparmar
 
Blockchain Transactions Explained For Everyone
CIFDAQ
 
Newgen 2022-Forrester Newgen TEI_13 05 2022-The-Total-Economic-Impact-Newgen-...
darshakparmar
 
From Sci-Fi to Reality: Exploring AI Evolution
Svetlana Meissner
 
New from BookNet Canada for 2025: BNC BiblioShare - Tech Forum 2025
BookNet Canada
 
AI Penetration Testing Essentials: A Cybersecurity Guide for 2025
defencerabbit Team
 
"AI Transformation: Directions and Challenges", Pavlo Shaternik
Fwdays
 
WooCommerce Workshop: Bring Your Laptop
Laura Hartwig
 
Mastering Financial Management in Direct Selling
Epixel MLM Software
 
Bitcoin for Millennials podcast with Bram, Power Laws of Bitcoin
Stephen Perrenod
 
Using FME to Develop Self-Service CAD Applications for a Major UK Police Force
Safe Software
 
What Makes Contify’s News API Stand Out: Key Features at a Glance
Contify
 
Presentation - Vibe Coding The Future of Tech
yanuarsinggih1
 
NewMind AI - Journal 100 Insights After The 100th Issue
NewMind AI
 
Transcript: New from BookNet Canada for 2025: BNC BiblioShare - Tech Forum 2025
BookNet Canada
 
CIFDAQ Token Spotlight for 9th July 2025
CIFDAQ
 

Oracle R12 Work In Process

  • 1. WIP- Discrete Job Creation Process (Manual) Production Identify the item to Build Standard Assembly ? Select BOM and Routing Enter Assembly and Quantity Attach a document if required NOYES Determine the Job Number Create Discrete Job Select type as ‘Standard’ Select type as ‘Non Standard’ Release a Discrete Job
  • 2. Create Discrete Job  Overview • Discrete jobs may be created from Planner Workbench through the WIP Mass Interface, or they may be created using the Discrete Job form. • Non-standard discrete jobs for repair, engineering prototypes, and released new build jobs using optional bills of materials or routings may be created using the Discrete Job form. • A standard job is for items that have a standard released bill of material. • Non-standard jobs are more flexible than standard jobs. They can be used for rework, field service repair, upgrades, disassembly, maintenance engineering prototypes, and other miscellaneous projects • For a standard job, if a primary BOM and/or routing exist for the assembly they will be defaulted. You can also enter an alternate BOM and/or routing. • You can attach illustrative or explanatory files-in the form of text, images, word processing documents, spreadsheets, video, etc. to discrete jobs. • Change the Status on the job from Unreleased to Released.
  • 3. Modify Discrete Job  Overview: • You can change discrete jobs using the Discrete Jobs and Discrete Jobs Summary windows. • What We Can Change?  Date changes: For date changes, it is only necessary to change either the start date or the completion date. If the start date is changed, the system will forward schedule and recalculate the completion date. If the completion date is changed, the system will backward schedule and recalculate the start date. These changes can be made through the Define Discrete Job form.  Quantity changes: Quantity changes can be done with no restrictions if the job is unreleased. You can also increase the quantity as a job is released. If the job is released and work has begun on the assembly, you cannot decrease the job quantity lower than the number of assemblies that have already passed the Queue intraoperation step of the first operation. If a sales order is linked to the job, you cannot decrease the job quantity lower than the order quantity.  Comments: The text of one-time comments can be amended. Standard comments can either be added or deleted.
  • 4. Modify Discrete Job  Status: Jobs can have the following statuses: Unreleased, Released, Complete - Charges Allowed, Complete - No Charges Allowed, On Hold, and Cancelled.  Firm: Unreleased schedules or jobs may be firmed to prevent MRP date changes from being reflected automatically on the schedule or job. Note: Changes cannot be made on components and operations in the Discrete Job form.
  • 5. WIP-Component Issue Process Production Stores Identify Discrete Job Pending Material Requirement ? Print Move Order Pick Slip Run ‘Component Pick Release’ View and allocate material YES Check the material requirement Transact Move Order
  • 6. WIP-Change Material Requirement Process Production Planning Check Discrete Job for which additional material required Query discrete job where changes are required Identify the changes in item/Quantity/dates/ comments/status/firm fields Enter and Save the changes Open Material Requirement form
  • 7. Modify Material Requirement  Once a discrete job has been created you may modify material requirements if they differ from the BOM. You may also use this form to add requirements for a non-standard discrete job.  This responsibility is majorly provided to Planner or Shop Floor In charge as this will cause audit issue when “ Require Qty in BOM V/S Actual Consumption” is calculated. Caution: • Major changes in the Material Requirement are done through BOM revision. • Change the material requirement when the Job is in ‘Release or Un-release’ State • Changes in material requirement after JOB completion may cause variance.
  • 8. WIP-Move Transaction Process (Inter-Operation Moves) Operation 10 QUEUE QUEUEOperation 20 RUN TO MOVE REJECT SCRAP RUN TO MOVE REJECT SCRAP Operation 30 QUEUE RUN TO MOVE REJECT SCRAP Operation N
  • 9. WIP-Move Transaction Process (Intra-Operation Moves) Operation 10 QUEUE QUEUEOperation 20 RUN TO MOVE REJECT SCRAP RUN TO MOVE REJECT SCRAP Operation 30 QUEUE RUN TO MOVE REJECT SCRAP Operation N
  • 10. Move Transaction  Overview:  Using the Move Transactions form, you can move the assemblies you are building from one operation and/or intraoperation step to another.  You can move assemblies forward and backward within and between operations.  Moving assemblies into the To Move, Reject, or Scrap intraoperation step of an operation completes those assemblies at that operation.  When assemblies are completed at an operation, the system automatically backflushes Operation Pull components and charges resources.  Interoperation Moves: Moving assemblies from one operation to another is an interoperation move. Moves usually follow the forward sequence defined by the routing, but you can move assemblies from any operation to any other, even preceding operations.  Intraoperation Moves: Moving assemblies from one intraoperation step of an operation to another intraoperation step of the same operation is an intraoperation move. You can move assemblies from any enabled intraoperation step, (Queue, Run, To move, Reject, or Scrap), as required.
  • 11. Things to Check  View Pending Jobs  Use the Pending Jobs and Schedules form to view, update, delete, and resubmit records that have failed validation and remain in the Open Job and Schedule Interface table.  You cannot close a job if pending transactions exist. If no pending transactions exist on a job then the results of the search will return nothing. Navigate to: Discrete > Pending Jobs and Schedules  Pending Move Transactions  You can view, update, delete, and resubmit move transaction records that have failed validation and remain in the Open Move Transaction Interface table.  You can view error messages associated with failed records. Error messages can assist you in updating failed records before resubmission. Navigate to: Move Transactions > Pending Move Transactions
  • 12. Things to Check  Pending Resource Transactions  You can view, update, delete and resubmit resource transactions that have failed validation or processing and remain in the Open Resource Transaction Interface table.  You can view error messages associated with failed records, which can help you in updating the failed records before resubmission.  At period close this table should be reviewed prior to closing the period to make sure all resource transactions have cleared. Navigate to: Resource Transactions > Pending Resource Transactions
  • 13. WIP Value Summary  View A WIP Value Summary  Use the WIP Value Summary form to view the current value of open and closed jobs. Navigate to: Discrete > WIP Value Summary How to Understand the form output: Periods From/To: This field will display the current period unless you entered a range into the previous form. Quantities: This area will display the quantity information related to the discrete job selected. Cost Element: Displays the cost element associated with the cost information listed. Account: Displays the account associated with the cost you are viewing. Cost Incurred: Displays the current cost incurred on the discrete job by element. Cost Relieved: Displays the current cost relieved on the discrete job by element. Variances Relieved: Displays the current cost variance relieved on the discrete job by element.
  • 14. WIP Value Summary Variance Relieved= Costs Incurred - Costs Relieved COST INCURRED >> (Production Cost) Term used to indicate the total amount spent to produce an assembly by using/consuming applicable MATERIALS (sub assembly & components) & RESOURCES (such as machine, man power, consumables, tools etc.) COST RELIEVED >> (BOM Cost) Cost or Rate of the assembly item produced by the manufacturing process, which is defined as Item standard cost at Item Costs form of costing module
  • 15. WIP Material Transactions  When Material Transaction is used: • Excess material may have been issued in error to a job. • The bill of materials for an assembly may be incorrect and may call for too many or too few components. • A component may have been damaged during assembly and it is decided to issue another component to the schedule or job, while leaving the damaged component charged to the schedule or job also. • Components may be consumed during assembly set-up and it has been decided to leave the loss charged to the schedule or job and replace the components. • One WIP supply subinventory may have a short-term oversupply and it may be decided to transfer the components to another WIP supply subinventory requiring them.
  • 16. WIP Material Transactions Types  WIP Material Transaction Types: • WIP Component Issue-Issues components from inventory to jobs and schedules to fulfill positive material requirements. • WIP component Return-Returns components from jobs and schedules to inventory. • WIP negative component issue-Issues components from jobs and schedules to inventory to fulfill negative material requirements. (WIP negative component issue is to return material into stock, material requirement should be – yes) • WIP negative component return-Returns components to jobs and schedules from inventory to fulfill negative material requirements. WIP negative component returns reverse WIP negative component issues. • Replenishment supply subinventory-Replenishes the supply subinventories of Operation Pull or Assembly Pull supply type components. This transaction works the same as performing a subinventory transfer in inventory. • Inventory sub transfer-Performs a subinventory transfer of one subinventory to another. This is similar to the replenishment supply subinventory type.
  • 17. WIP-Complete Discrete Job Process Production Check Discrete Job which needs to be complete Pending Material Requirement ? Pending Move Transaction ? Use ‘Completion Transaction’ and complete desired assembly units Complete move transaction Is it a last operation? To component Pick Release Process YES NO NO YES YES NO
  • 18. Complete Discrete Job  Overview • A job must have a status of “Released” in order to have completions transacted against it. • When the last assembly on the job is completed, Materials or Manufacturing will process the final completion transaction and change the status of the job to “complete charges allowed”. • The job will remain open for a determined amount of time in this state in order to allow for all appropriate charges to be made against it. • At the end of that time, Cost Accounting will change the status of the job to “complete no charges allowed”. • At the end of the accounting period, Cost Accounting will change the status of all jobs currently at “complete no charges allowed” to “closed”.
  • 19. WIP- Discrete Job Close Process Production Cost Accounting Identify the Discrete Job to complete Is it a serialized item ? Charge the Job with appropriate charges Change the job status to “ Complete-No Charge Allowed” Close Discrete Job NO YESMove assembly to FG or Shipping Enter completion data Enter serial numbers Partial quantity ? NO YES
  • 20. Close Discrete Job  Overview • A job must have a status of “Released” in order to complete quantities against it. • When the last assembly on the job is completed and transacted, Materials or Manufacturing will change the status of the job to “Complete-Charges Allowed”. • The job will remain open for a determined amount of time to allow all transactions to be done against the job and variances to be researched and resolved. • Materials or Manufacturing will change the status to “Complete-No Charges Allowed”. Cost Accounting will review all jobs in this status and then close the jobs.