Overview
   Strategy was adopted in June 2009. Targets set for 2020. Three-year action
    plans (2009/10 – 2011/12) for ‘corporate’ and ‘community’ were adopted.
   http://www.boroondara.vic.gov.au/our-city/environment/strategies
   New action plans to guide priorities between 2012/13 – 2015/16 need to
    be developed for Council endorsement.

   Community forum aims to:
     Update interested community groups and individuals on progress to
       date against the current action plans and foreshadow proposed
       upcoming actions
     Seek suggestions for potential actions and priorities for the updated
       action plans
     Explore opportunities for collaboration on community-focused
       initiatives .

This briefing has been distributed prior to the forum to help attendees prepare
for a meaningful and collaborative forum discussion.

                                                            www.boroondara.vic.gov.au
Recap on the Strategy
Principles:
1. Leadership by Council with the community
2. Assuming a moral obligation to act
3. Pursuit of ‘multiple benefits’ and a ‘no regrets’ approach to action
4. Actions prioritised by impact
5. Equity in both strategy and action

Objectives (reflecting combination of benefits being sought):
1. Reduce Council’s own greenhouse gas emissions
2. Reduce aggregate emissions for Australia
3. Reduce the impact of increasing energy prices on Council’s budget
4. Reduce the impact of increasing energy prices of vulnerable sectors of the
   community
5. Support the Australian Government to introduce more ambitious
   greenhouse gas reduction targets
6. Increase local energy security through investment in renewable energy
   sources.

                                                             www.boroondara.vic.gov.au
Recap (con’t)
Targets:
• To reduce Council’s corporate greenhouse gas emissions by 30 - 40 per cent
below its 2007/08 levels by 2020
• To support programs and projects with the community that achieve an
abatement total of at least 50,000 tonnes CO2-e by 2020.

Highest priority action areas:
Corporate
     • Buildings - energy efficiency (co-gen at leisure centres, ESD in buildings
        and facilities)
    • Streetlighting – switch to T5 lamps
    • Fleet – smaller, more fuel-efficient fleet
Community
    • Residential – energy efficiency (eg light globes, showerheads, solar hot
        water)
    • Commercial – energy efficiency opportunities in existing commercial
        buildings
Context – then and now
Then (ie mid-2009):
•   Prior to international negotiations in Copenhagen
•   Carbon Pollution Reduction Scheme (CPRS) announced and intended to start
    in 2011/12
•   Significant community debate on details but support for national action on
    climate change was high.

Now
•   International mitigation commitments and framework still not agreed
•   Revised emissions trading scheme (Clean Energy Future) now legislated
    without bi-partisan support
•   Victorian Government undertaking review of the Victorian Climate Change
    Act 2010.
•   Public debate and opinion has shifted. Acceptance of the science and
    support for strong action has waned.
•   Climate action and advocacy groups remain engaged and driving for
    effective action.
Council emissions sources 2009/10
                                 Refrigerants: Air Con
                                       & Fridges
                                          1%


                         Other Scope 3
                          Emissions *
                             10%
               Vehicles : Fuel
                    9%

                                                     Buildings: Electricity
            Buildings: Gas                                   43%
                 10%




                       Streetlighting:
                         Electricity
                            27%
Corporate emissions progress

                                         30000
Greenhouse gas emissions (tonnes CO2e)




                                                                          911                   911
                                         25000


                                                                         8443                   7819
                                         20000



                                         15000
                                                    26837

                                         10000
                                                                        17268                  18074
                                                                                                                   16000

                                         5000



                                             0
                                                 2007/08 Actual      2008/09 Actual         2009/10 Actual       2020 Target


                                                        GreenFleet   GreenPower       Greenhouse gas emissions
Building emissions by site
                3500
                       • Top 14 sites = 87% of building emissions
                       & about 50% of total emissions
                3000
                       •Top 7 sites (out of ~ 200) = 70% of
                2500   building emissions

                2000                                                natural
 tonnes CO2-e




                                                                    gas
                1500
                                                                    electricity
                1000


                500


                   0
Corporate Action Plan – status
Priority area and   Status
action
Street lighting     • Funding allocated
switch to T5s       • Contract negotiations almost complete with United
                    Energy (Ashburton and Glen Iris)
                    • Also in negotiation with CitiPower (rest of municipality)
Buildings energy    • Install co- generator at Ashburton pool – complete
efficiency          • Lighting retrofits at Kew & Riversdale depot – complete
                    •Sustainable Buildings Policy and Guidelines – complete
                    • Implementation of new policy / guidelines – underway
                    • (New) Feasibility study for cogeneration at Boroondara
                    Sports Complex and Kew Rec Centre – commenced
Fleet               • New efficient Local Laws fleet - complete
                    • Switch to sustainable biodiesel for large trucks -
                    complete
Data management     • Annual emissions inventories – ongoing
and reporting       • Utilities data process improvements – ongoing
Key projects
                           Asburton Community Precinct Cogeneration –
                           • 230kW cogenerator at Ashburton Pool and
                           Recreation Centre commissioned in October
                           2011.
                           • PVs, VSDs and lighting retrofits in precinct
                           community buildings.
APARC cogeneration plant   • Emissions reductions in the order of 1000
                           tonnes will flow through into 11/12 inventory.
                           • Project investment: ≈ $1 million

                           Street Lighting bulk change -
                           • Once fully implemented, project is expected
                           to save approx 16,800 tonnes of CO2-e over
                           ten years.
                           • Negotiations with distribution businesses are
                           complex and slow.
                           • Anticipated completion in 2012/13
                           • Project investment: $2.4M
Community Action Plan - status
Priority area and action    Status
Residential – Solar Hot     • Sustainable Easter Suburbs program in 2010/11
Water promotion             with other Eastern Alliance for Greenhouse Action
                            (EAGA) councils – complete
Residential – Solar PV      • Solar Suburbs program in 2008/09 – 09/10 with
promotion                   EAGA – complete
                            Notes: early end due to loss of fed rebate
Residential – Lightbulbs    • Live Green with LESS program (free in-home
                            replacement of light bulbs) in 2009/10 – complete
                            • GreenHouse Project (with Sustainability Vic) in
                            2009/10 – complete
Residential – Showerheads   • Live Green with LESS program (in-home
                            replacement of light bulbs) in 2009/10 – complete
                            • Showerhead exchange at Council offices
                            (supplied by YVW) in 2010/11 & 11/12 – ongoing
Commercial – promote        • Promotion via business networks and trader
building retrofits          associations – lower priority
Complementary (community) actions
• Eco-living centre at 25 Inglesby Rd, Camberwell –
  construction set for 2012/13
• Living for our Future program – workshop series on
  composting and worm farming, solar hot water / PV,
  energy smart homes, productive gardening etc
• Boroondara Sustainability Awards
• Continued investment in walking and cycling
  infrastructure
• Walking School Bus program – currently 17 schools
• Ongoing promotion of available grants and rebates eg
  Victorian Energy Saved Incentive Scheme
A new sustainable living hub
Boroondara Eco-Living Centre
                                   Tours
                                   School activities
                                   Seminars
                                   Workshops
                                   Meetings
                                   Events
                                   Outdoor classes
                                   Demonstrations
                                   Interactive activities
                                   Interpretive displays

Upcoming community consultation:
Wed 30 Nov 2011 – 6pm at Council
PLEASE COME AND HAVE YOUR SAY
Possible future actions (corporate)
Priority area     Options / ideas

Public lighting   • Solar lighting along share paths
                  • Other ideas/ options?

Buildings         • Increase ESD in building renewal program
                  • Progressively retrofit co-gen at remaining leisure
                  centres
                  • Other ideas/ options?

Fleet             • Tighten ‘green vehicle’ definition in Fleet Policy
                  • Trial hybrid / electric garbage trucks
                  • Other ideas/ options?

Data management   • Progress to real-time utilities data monitoring
and reporting     • Other ideas/options?
Possible future actions (community)
Priority area          Options / ideas

Residential - energy   • Promo revised Vic Energy Saver Incentive Scheme offer
                       (in-home smart switches etc)
                       • Community / enviro group initiatives?
                       • Other ideas / options?

Residential - waste    • Subsidised worm farms / compost bins
                       • Community / enviro group initiatives?
                       • Other ideas / options?

Transport sector       • Participate in PARK(ing ) Day
                       • Other ideas / options?


Commercial sector      • Other ideas / options?
Group activity
1. Split into two groups to share / brainstorm
   ideas:
   – Actions to reduce community emissions
   – Actions to reduce Council emissions
2. Assess against value & effort matrix
3. Feedback best ideas to whole group
4. Whole group reflection

               WRAP UP AND CLOSE

More Related Content

PDF
Energy Forum Roanoke
PDF
back 2 business week - green deal: Phil Powell on community energy
PDF
Mastering solar planning & permits presentation 10182011
PPTX
CBI energy conference: Martin Ashcroft
PDF
Renewable and low carbon energy capacity study for the East of England
PDF
F1 friday sustainable energy
PDF
CVGA Annual General Meeting November 2016
PDF
2010 12-16 kurnitski-synergia
Energy Forum Roanoke
back 2 business week - green deal: Phil Powell on community energy
Mastering solar planning & permits presentation 10182011
CBI energy conference: Martin Ashcroft
Renewable and low carbon energy capacity study for the East of England
F1 friday sustainable energy
CVGA Annual General Meeting November 2016
2010 12-16 kurnitski-synergia

What's hot (19)

PPT
Sustainable refurbishment at scale - By Stephen Passmore, Energy Saving Trust
PPTX
EDC's DMA: Tools and Strategy in Sustainability Reporting
KEY
Charles McGlashan: Marin Clean Energy
PDF
OPA - Chee-Aloy - Ontario's Green Energy Act And FiT Program
PDF
Solar Financing: Shedding Light on Solar Incentives
PDF
Alan Pears - slides - price on carbon forum Aug 2011
PDF
20121016 sev1 aee_parish-presentation_mio-awi-pptx
PPTX
Keynote - Joseph Simonelli
PDF
Overview of Energy Efficieny and Conservation Block Grants for the City of Ir...
PDF
What does one planet living look like and how can you embed it into your retr...
PPTX
Beattie decarb course
PPTX
EECBG Program Success 2012
PPTX
About the ladock wind project june12v2 030712_v4
PPTX
History of energy, economy and environment in the Philippines (in FIilipino l...
PPTX
009 Eco-island: The hub of a sustainable future
PDF
Self Energy Miguel Matias 21 Jan 2011
PDF
South Africa Contact Issue 2 2012
PDF
State Of The Energy Industry Jan 2006
Sustainable refurbishment at scale - By Stephen Passmore, Energy Saving Trust
EDC's DMA: Tools and Strategy in Sustainability Reporting
Charles McGlashan: Marin Clean Energy
OPA - Chee-Aloy - Ontario's Green Energy Act And FiT Program
Solar Financing: Shedding Light on Solar Incentives
Alan Pears - slides - price on carbon forum Aug 2011
20121016 sev1 aee_parish-presentation_mio-awi-pptx
Keynote - Joseph Simonelli
Overview of Energy Efficieny and Conservation Block Grants for the City of Ir...
What does one planet living look like and how can you embed it into your retr...
Beattie decarb course
EECBG Program Success 2012
About the ladock wind project june12v2 030712_v4
History of energy, economy and environment in the Philippines (in FIilipino l...
009 Eco-island: The hub of a sustainable future
Self Energy Miguel Matias 21 Jan 2011
South Africa Contact Issue 2 2012
State Of The Energy Industry Jan 2006

Viewers also liked (7)

PPT
North East Bicycle Corridor linking Chandle Hiqhway and Alexandra Parade
PPS
LIghter Footprints proposals for Our Low Carbon Future 15 Nov 2011
PDF
Rail Corridors and the Principal Bicycle Network (Parsons Brinckerhoff) p51-80
PPT
Hawthorn to box hill trail
PDF
Rail Corridors and the Principal Bicycle Network (Parsons Brinckerhoff) p01-50
PDF
Succession “Losers”: What Happens to Executives Passed Over for the CEO Job?
PDF
32 Ways a Digital Marketing Consultant Can Help Grow Your Business
North East Bicycle Corridor linking Chandle Hiqhway and Alexandra Parade
LIghter Footprints proposals for Our Low Carbon Future 15 Nov 2011
Rail Corridors and the Principal Bicycle Network (Parsons Brinckerhoff) p51-80
Hawthorn to box hill trail
Rail Corridors and the Principal Bicycle Network (Parsons Brinckerhoff) p01-50
Succession “Losers”: What Happens to Executives Passed Over for the CEO Job?
32 Ways a Digital Marketing Consultant Can Help Grow Your Business

Similar to Our Low Carbon Future Community Consultation Nov 2011 draft (20)

PPT
Climate Change Mitigation & Adaptation
PPT
"Products / Technologies: Lessons Learnt form Radian Retrofit Project" - Paul...
PDF
Beyond Zero Carbon Housing - Robin Nicholson
PPTX
Greening DECC - The CIO as Champion
PDF
KICC MEA Kenilworth 30 September 2009
PDF
Paul Ciniglio presentation for South Coast green breakfast - 22 May
PDF
Pulse Energy Webinar: Sustainability in Cities
PPT
community retrofit
PPT
Robin Nicholson Evening Lecture for the MEGS-KT project
PDF
Blake Lapthorn eco retrofit seminar slides 21 October 2010
PDF
Session 1 stefan johansson
PPTX
Terry McGivern MEGS-KT lecture 14th November 2012
PDF
NHS Sustainability Day Oxford Road Show
PPTX
Bristol Energy Cooperative Bond Offer July 2017
PPTX
Biomass And The RHI
PDF
Blake Lapthorn and Savills sustainability in the changing environment seminar
PDF
Blake Lapthorn and Savills sustainability in the changing environment seminar
PPT
Ecoterrace Design Quality Presentation
PPT
Presentación Carbon Masters- Foro Energético
PPTX
Climate Change - Role of Industry - Mr. Rambabu
Climate Change Mitigation & Adaptation
"Products / Technologies: Lessons Learnt form Radian Retrofit Project" - Paul...
Beyond Zero Carbon Housing - Robin Nicholson
Greening DECC - The CIO as Champion
KICC MEA Kenilworth 30 September 2009
Paul Ciniglio presentation for South Coast green breakfast - 22 May
Pulse Energy Webinar: Sustainability in Cities
community retrofit
Robin Nicholson Evening Lecture for the MEGS-KT project
Blake Lapthorn eco retrofit seminar slides 21 October 2010
Session 1 stefan johansson
Terry McGivern MEGS-KT lecture 14th November 2012
NHS Sustainability Day Oxford Road Show
Bristol Energy Cooperative Bond Offer July 2017
Biomass And The RHI
Blake Lapthorn and Savills sustainability in the changing environment seminar
Blake Lapthorn and Savills sustainability in the changing environment seminar
Ecoterrace Design Quality Presentation
Presentación Carbon Masters- Foro Energético
Climate Change - Role of Industry - Mr. Rambabu

Recently uploaded (20)

PDF
Transform-Quality-Engineering-with-AI-A-60-Day-Blueprint-for-Digital-Success.pdf
PDF
AI.gov: A Trojan Horse in the Age of Artificial Intelligence
PDF
EIS-Webinar-Regulated-Industries-2025-08.pdf
PDF
Launch a Bumble-Style App with AI Features in 2025.pdf
PDF
IT-ITes Industry bjjbnkmkhkhknbmhkhmjhjkhj
PPTX
Information-Technology-in-Human-Society.pptx
PDF
A symptom-driven medical diagnosis support model based on machine learning te...
PDF
The-Future-of-Automotive-Quality-is-Here-AI-Driven-Engineering.pdf
PDF
Connector Corner: Transform Unstructured Documents with Agentic Automation
PDF
giants, standing on the shoulders of - by Daniel Stenberg
PDF
Data Virtualization in Action: Scaling APIs and Apps with FME
PDF
Introduction to MCP and A2A Protocols: Enabling Agent Communication
PDF
CEH Module 2 Footprinting CEH V13, concepts
PDF
Transform-Your-Streaming-Platform-with-AI-Driven-Quality-Engineering.pdf
PDF
Transform-Your-Supply-Chain-with-AI-Driven-Quality-Engineering.pdf
PDF
CCUS-as-the-Missing-Link-to-Net-Zero_AksCurious.pdf
PPTX
Blending method and technology for hydrogen.pptx
PDF
SaaS reusability assessment using machine learning techniques
PPTX
Rise of the Digital Control Grid Zeee Media and Hope and Tivon FTWProject.com
PDF
Altius execution marketplace concept.pdf
Transform-Quality-Engineering-with-AI-A-60-Day-Blueprint-for-Digital-Success.pdf
AI.gov: A Trojan Horse in the Age of Artificial Intelligence
EIS-Webinar-Regulated-Industries-2025-08.pdf
Launch a Bumble-Style App with AI Features in 2025.pdf
IT-ITes Industry bjjbnkmkhkhknbmhkhmjhjkhj
Information-Technology-in-Human-Society.pptx
A symptom-driven medical diagnosis support model based on machine learning te...
The-Future-of-Automotive-Quality-is-Here-AI-Driven-Engineering.pdf
Connector Corner: Transform Unstructured Documents with Agentic Automation
giants, standing on the shoulders of - by Daniel Stenberg
Data Virtualization in Action: Scaling APIs and Apps with FME
Introduction to MCP and A2A Protocols: Enabling Agent Communication
CEH Module 2 Footprinting CEH V13, concepts
Transform-Your-Streaming-Platform-with-AI-Driven-Quality-Engineering.pdf
Transform-Your-Supply-Chain-with-AI-Driven-Quality-Engineering.pdf
CCUS-as-the-Missing-Link-to-Net-Zero_AksCurious.pdf
Blending method and technology for hydrogen.pptx
SaaS reusability assessment using machine learning techniques
Rise of the Digital Control Grid Zeee Media and Hope and Tivon FTWProject.com
Altius execution marketplace concept.pdf

Our Low Carbon Future Community Consultation Nov 2011 draft

  • 1. Our Low Carbon Future Strategy Briefing on progress so far & looking forward Community forum - November 2011
  • 2. Overview  Strategy was adopted in June 2009. Targets set for 2020. Three-year action plans (2009/10 – 2011/12) for ‘corporate’ and ‘community’ were adopted.  http://www.boroondara.vic.gov.au/our-city/environment/strategies  New action plans to guide priorities between 2012/13 – 2015/16 need to be developed for Council endorsement.  Community forum aims to:  Update interested community groups and individuals on progress to date against the current action plans and foreshadow proposed upcoming actions  Seek suggestions for potential actions and priorities for the updated action plans  Explore opportunities for collaboration on community-focused initiatives . This briefing has been distributed prior to the forum to help attendees prepare for a meaningful and collaborative forum discussion. www.boroondara.vic.gov.au
  • 3. Recap on the Strategy Principles: 1. Leadership by Council with the community 2. Assuming a moral obligation to act 3. Pursuit of ‘multiple benefits’ and a ‘no regrets’ approach to action 4. Actions prioritised by impact 5. Equity in both strategy and action Objectives (reflecting combination of benefits being sought): 1. Reduce Council’s own greenhouse gas emissions 2. Reduce aggregate emissions for Australia 3. Reduce the impact of increasing energy prices on Council’s budget 4. Reduce the impact of increasing energy prices of vulnerable sectors of the community 5. Support the Australian Government to introduce more ambitious greenhouse gas reduction targets 6. Increase local energy security through investment in renewable energy sources. www.boroondara.vic.gov.au
  • 4. Recap (con’t) Targets: • To reduce Council’s corporate greenhouse gas emissions by 30 - 40 per cent below its 2007/08 levels by 2020 • To support programs and projects with the community that achieve an abatement total of at least 50,000 tonnes CO2-e by 2020. Highest priority action areas: Corporate • Buildings - energy efficiency (co-gen at leisure centres, ESD in buildings and facilities) • Streetlighting – switch to T5 lamps • Fleet – smaller, more fuel-efficient fleet Community • Residential – energy efficiency (eg light globes, showerheads, solar hot water) • Commercial – energy efficiency opportunities in existing commercial buildings
  • 5. Context – then and now Then (ie mid-2009): • Prior to international negotiations in Copenhagen • Carbon Pollution Reduction Scheme (CPRS) announced and intended to start in 2011/12 • Significant community debate on details but support for national action on climate change was high. Now • International mitigation commitments and framework still not agreed • Revised emissions trading scheme (Clean Energy Future) now legislated without bi-partisan support • Victorian Government undertaking review of the Victorian Climate Change Act 2010. • Public debate and opinion has shifted. Acceptance of the science and support for strong action has waned. • Climate action and advocacy groups remain engaged and driving for effective action.
  • 6. Council emissions sources 2009/10 Refrigerants: Air Con & Fridges 1% Other Scope 3 Emissions * 10% Vehicles : Fuel 9% Buildings: Electricity Buildings: Gas 43% 10% Streetlighting: Electricity 27%
  • 7. Corporate emissions progress 30000 Greenhouse gas emissions (tonnes CO2e) 911 911 25000 8443 7819 20000 15000 26837 10000 17268 18074 16000 5000 0 2007/08 Actual 2008/09 Actual 2009/10 Actual 2020 Target GreenFleet GreenPower Greenhouse gas emissions
  • 8. Building emissions by site 3500 • Top 14 sites = 87% of building emissions & about 50% of total emissions 3000 •Top 7 sites (out of ~ 200) = 70% of 2500 building emissions 2000 natural tonnes CO2-e gas 1500 electricity 1000 500 0
  • 9. Corporate Action Plan – status Priority area and Status action Street lighting • Funding allocated switch to T5s • Contract negotiations almost complete with United Energy (Ashburton and Glen Iris) • Also in negotiation with CitiPower (rest of municipality) Buildings energy • Install co- generator at Ashburton pool – complete efficiency • Lighting retrofits at Kew & Riversdale depot – complete •Sustainable Buildings Policy and Guidelines – complete • Implementation of new policy / guidelines – underway • (New) Feasibility study for cogeneration at Boroondara Sports Complex and Kew Rec Centre – commenced Fleet • New efficient Local Laws fleet - complete • Switch to sustainable biodiesel for large trucks - complete Data management • Annual emissions inventories – ongoing and reporting • Utilities data process improvements – ongoing
  • 10. Key projects Asburton Community Precinct Cogeneration – • 230kW cogenerator at Ashburton Pool and Recreation Centre commissioned in October 2011. • PVs, VSDs and lighting retrofits in precinct community buildings. APARC cogeneration plant • Emissions reductions in the order of 1000 tonnes will flow through into 11/12 inventory. • Project investment: ≈ $1 million Street Lighting bulk change - • Once fully implemented, project is expected to save approx 16,800 tonnes of CO2-e over ten years. • Negotiations with distribution businesses are complex and slow. • Anticipated completion in 2012/13 • Project investment: $2.4M
  • 11. Community Action Plan - status Priority area and action Status Residential – Solar Hot • Sustainable Easter Suburbs program in 2010/11 Water promotion with other Eastern Alliance for Greenhouse Action (EAGA) councils – complete Residential – Solar PV • Solar Suburbs program in 2008/09 – 09/10 with promotion EAGA – complete Notes: early end due to loss of fed rebate Residential – Lightbulbs • Live Green with LESS program (free in-home replacement of light bulbs) in 2009/10 – complete • GreenHouse Project (with Sustainability Vic) in 2009/10 – complete Residential – Showerheads • Live Green with LESS program (in-home replacement of light bulbs) in 2009/10 – complete • Showerhead exchange at Council offices (supplied by YVW) in 2010/11 & 11/12 – ongoing Commercial – promote • Promotion via business networks and trader building retrofits associations – lower priority
  • 12. Complementary (community) actions • Eco-living centre at 25 Inglesby Rd, Camberwell – construction set for 2012/13 • Living for our Future program – workshop series on composting and worm farming, solar hot water / PV, energy smart homes, productive gardening etc • Boroondara Sustainability Awards • Continued investment in walking and cycling infrastructure • Walking School Bus program – currently 17 schools • Ongoing promotion of available grants and rebates eg Victorian Energy Saved Incentive Scheme
  • 13. A new sustainable living hub Boroondara Eco-Living Centre Tours School activities Seminars Workshops Meetings Events Outdoor classes Demonstrations Interactive activities Interpretive displays Upcoming community consultation: Wed 30 Nov 2011 – 6pm at Council PLEASE COME AND HAVE YOUR SAY
  • 14. Possible future actions (corporate) Priority area Options / ideas Public lighting • Solar lighting along share paths • Other ideas/ options? Buildings • Increase ESD in building renewal program • Progressively retrofit co-gen at remaining leisure centres • Other ideas/ options? Fleet • Tighten ‘green vehicle’ definition in Fleet Policy • Trial hybrid / electric garbage trucks • Other ideas/ options? Data management • Progress to real-time utilities data monitoring and reporting • Other ideas/options?
  • 15. Possible future actions (community) Priority area Options / ideas Residential - energy • Promo revised Vic Energy Saver Incentive Scheme offer (in-home smart switches etc) • Community / enviro group initiatives? • Other ideas / options? Residential - waste • Subsidised worm farms / compost bins • Community / enviro group initiatives? • Other ideas / options? Transport sector • Participate in PARK(ing ) Day • Other ideas / options? Commercial sector • Other ideas / options?
  • 16. Group activity 1. Split into two groups to share / brainstorm ideas: – Actions to reduce community emissions – Actions to reduce Council emissions 2. Assess against value & effort matrix 3. Feedback best ideas to whole group 4. Whole group reflection WRAP UP AND CLOSE