The paper analyzes the power consumption and propagation delay of logic circuits designed with reversible gates using VHDL, aiming to provide insights for designers to optimize logic circuits. It discusses the significance of reversible logic in minimizing power dissipation and heat generation in advanced VLSI design, emphasizing the need for reversible computing to address current technological challenges. Various reversible gates are evaluated through simulations, highlighting their potential in enhancing performance and energy efficiency in digital logic circuits.