Process of Building
Construction
Presented By: Ayush N. Hajare
(Diploma student, 2nd year, civil engineering)
Building construction
• Building construction is the process of adding structure to
real property.
• Building a construction step involve in any type of
construction is not an easy task.
• For building construction requires lots of time and it is
tedious work, yet it's result is permanent asset for us.
• Care should be taken in building construction, before
planning, building construction projects must consider
important aspects like the purpose of construction,
utility, financial proficiency, the demand of work, etc.
@ayushhajare
Steps for pre- construction
• To Acquire land or plot
• To seek technical help
• Prepare estimation and budgets
• Permission from Authorities
• Approach a builder
@ayushhajare
1.To Acquire land or plot
• It is the first and most important step in building
construction,search for the location for the building
which is best suited for building construction purpose.
• Be careful while selecting land which has all the
desired facilities available nearby and should be free
from all land related issues.
• It is necessary that collect information before buying
land or plot by help of real estate agents or by online
methods.
@ayushhajare
2.To seek technical Help
• After selecting land for building , take the help of a
architect to create building designs and take advice.
• Architect prepare plan as per building requirement,
number of flats , shops based on your requirement and
budgets.
• Then after architect consult with structural engineer for
details of the reinforcements to be used, how deep the
foundation will be, size of gravel to be used, pillar width,
etc.
@ayushhajare
3.Preparing Estimate and budget
• Building Construction involves a huge amount of
material and budget. After, planning and
structural detailing completed these details are
transferred to the building estimator.
• The building estimator will estimate the material
quantity, quantity of different items of work, and
prepare an abstract sheet that shows the cost of
building Construction.
@ayushhajare
• If financial resources are limited, we need to seek
pre- approving for loans in advance or else you
may end up in a cash crunch situation.
4.Permissions from Authorities
• This is most important process after construction,
we have to take permission from local municipal
body before you could go for the construct.
• There are some documents required to get
permission . This document may differ from
state to state, but some are important for every
building construction work.
@ayushhajare
• Following are the list of documents to
get permission
• Land survey: Survey of the land has to be carried out with
the help of athorized land surveyor.
• Soil test report of the land
• Land documents
• Architecture/ elevation/ sectional drawings
• Structural reports
• Architect certificate of undertaking on Record and certificate
of the undertaking of Civil engineer on record.
@ayushhajare
5. Approach a builder
• It is necessary to choose a good builder or contractor for
the construction work. Because the quality of work and
time required for it depends on the work of builder,
hence invistigations must be done.
• The details of the work must be cleared in the contract
document. The contract document should cover layout,
work details, payment method and time scale.
• All the condition of contract must be checked before
signing it.
@ayushhajare
Steps during construction
• Site preparation or leveling
• Excavation and pcc
• Foundation
• Plinth beam and slab
• Superstructure--Column
• Brick masonry work
• The lintel over door windows gaps
• Floor slab or roof structure
• Door window framing and fixations
• Electrical and plumbing
• Exterior finishing
• Terrace and roof finishing
• Internal finishing
• Woodwork and fixture fittings
1.Site preparation or leveling
• The construction site must be cleaned before the
work is executed.
• This work involves the removal of roots of trees ,
debris and leveling ground area.
@ayushhajare
2. Excavation and PCC
• The foundation of building ground is excavated
with the help of excavating machines as per the
building dimensions specified in drawings.
• In this foundation trench, a layer of PCC ( plain
cement concrete) is laid in dug portion before
placing the reinforcements for the foundation.
@ayushhajare
3. Foundation
• The building supported on foundation is the lowermost
part of the building that it is contact with the soil.
• A building is load transferred from the superstructure to the
soil and needs to be extremely strong to handle the load.
• After the PCC work foundation reinforcement work is
started, the foundation bottom level must check before
concreting it and the remaining space between the
foundation is filled with earth.
@ayushhajare
4. Plinth beam and slab
• After the foundation work is done ground beam
form work preparation is started and poured with
concrete.
• Over the plinth beam , masonry work is started
and space between foundation and plinth beam
filled with soil.
@ayushhajare
5.Superstructure - Column
• The superstructure is the portion above the plinth level
of the building.
• The main component of superstructure is a column and
beam.
• The columns are built up to slab level and the frame for
further Construction is prepared.
@ayushhajare
6.Brick masonry work
• As column and beam framework completed masonry
work is started with different materials such as bricks,
concrete blocks ,fly ash bricks, etc. according to building
drawing.
• Masonry work is done using a cement mortar mix,It is
mixture of cement and sand.
• As per drawing,gaps are laid for doors and windows
during the masonry work.
@ayushhajare
7. The lintel over door Windows
gaps
• The lintel is constructed on the door and window
to support the masonry work over it.
• After this further masonry work is done.
@ayushhajare
8. Floor slab or roof structure
• Then the formwork is started to construct slab
resting on the column and beam. Over slab
formwork, slab reinforcement is placed as per slab
detailed drawing.
@ayushhajare
9. Door window framing and
fixations
• After that door window frames are fixed at their
specified position given in drawing.
@ayushhajare
10. Electrical and plumbing
• As we know that buildings are constructed with a
clean finish in which electrical and plumbing work
is not visible.
• They are installed in the walls and slabs such that
they are concealed and invisible after finishing
work is done.
• The point and pipe end left out such that they can
be finished with electric fitting and plumbing
fixtures.
@ayushhajare
Electric fitting
Plumbing fitting
@ayushhajare
11. Exterior finishing
• Once this work is completed, external plastering
and finishing work is started.
• Waterproofing is also done to prevent rising
dampness in the wall.
• External cladding can also be done to enhance the
elevation of the house.
@ayushhajare
12. Terrace and roof finishing
• On top of the slab, waterproofing is done to
prevent any leakage in slab.
• Generally, terrazzo tilling is done to prevent the
slab from a weathering effect.
@ayushhajare
13. Internal finishing
• Internal walls are plaster with smooth finishing
and flooring is done with tiles. Later on, the walls
are painted or textured.
@ayushhajare
14. Woodwork and fixture fittings
• It is last step is this process, almost construction work is
completed and then after furniture work is started.
• Paralley, electrical fitting, switchboard, and plumbing fittings
are complete in the bathrooms and kitchen areas too.
• The last step of building construction is interior decoration
work in completing the building construction with proper
furnishing and fabric used.
@ayushhajare
Conclusion
• Hence, these are the basic steps of building
construction, which can be divided into pre
construction steps and during construction steps.
Each and every step has there own importance in the
complete procedure. Hence, for a proper work done,
all these steps should be followed in proper manner.
@ayushhajare
Thank you
@ayushhajare

More Related Content

PPTX
Building construction ppt
gyan singh
 
PPTX
GOOD CONSTRUCTION PRACTICE.pptx
HirenThakkar31
 
PPTX
Chapter 1 introduction of building construction
KHUSHBU SHAH
 
PPTX
Building construction
nhmurad
 
PDF
Building Construction 1: project 1
Nabeel Joomun
 
PDF
BUILDING CONSTRUCTION REPORT
emily9199
 
PPTX
Building Construction
Wilden How
 
PPT
Introduction to Building Construction
Er.Karan Chauhan
 
Building construction ppt
gyan singh
 
GOOD CONSTRUCTION PRACTICE.pptx
HirenThakkar31
 
Chapter 1 introduction of building construction
KHUSHBU SHAH
 
Building construction
nhmurad
 
Building Construction 1: project 1
Nabeel Joomun
 
BUILDING CONSTRUCTION REPORT
emily9199
 
Building Construction
Wilden How
 
Introduction to Building Construction
Er.Karan Chauhan
 

What's hot (20)

PPTX
Approximate estimate
Prasad Manerikar
 
PPTX
Estimating and costing
AyushHajare
 
PPTX
Construction planning & management
Manit Agarwal
 
PPTX
Estimation and Costing
Vijay325
 
PDF
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
VIDYA VIKAS INSTITUTE OF ENGINEERING AND TECHNOLOGY
 
PPTX
Prefabrication​ structure ppt
AbhishekM45
 
PPTX
Brick bond
Kamrul Hasan Sagar
 
PPTX
Pile foundations
Sameer Thaiyam
 
PPTX
INDUSTRIAL TRAINING OF FLYOVER CONSTRUCTION
Bhavek Sharma
 
PPTX
Shoring
Harikrishna M.S
 
PPTX
Foundation types
Ashwini Ingale
 
PPTX
basics of civil engineering
Chirag Bhanagale
 
PPTX
Underwater construction
Pranay Kumar
 
PPTX
Coffer Dams and Caissons
Rizwan Samor
 
PDF
Special Concretes
GAURAV. H .TANDON
 
PPTX
Design of staircase ppt
Vibhanshu Singh
 
PPTX
High rise building construction
Construction Tech. and Mgmt., VNIT Nagpur
 
PPT
Mixing of concrete.pptx
Nilesh Kachot
 
PPTX
civil engineering-Contracts
Nikhil Kumar
 
PDF
Construction technology presentation
Sze Ting Kuek
 
Approximate estimate
Prasad Manerikar
 
Estimating and costing
AyushHajare
 
Construction planning & management
Manit Agarwal
 
Estimation and Costing
Vijay325
 
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
VIDYA VIKAS INSTITUTE OF ENGINEERING AND TECHNOLOGY
 
Prefabrication​ structure ppt
AbhishekM45
 
Brick bond
Kamrul Hasan Sagar
 
Pile foundations
Sameer Thaiyam
 
INDUSTRIAL TRAINING OF FLYOVER CONSTRUCTION
Bhavek Sharma
 
Foundation types
Ashwini Ingale
 
basics of civil engineering
Chirag Bhanagale
 
Underwater construction
Pranay Kumar
 
Coffer Dams and Caissons
Rizwan Samor
 
Special Concretes
GAURAV. H .TANDON
 
Design of staircase ppt
Vibhanshu Singh
 
High rise building construction
Construction Tech. and Mgmt., VNIT Nagpur
 
Mixing of concrete.pptx
Nilesh Kachot
 
civil engineering-Contracts
Nikhil Kumar
 
Construction technology presentation
Sze Ting Kuek
 
Ad

Similar to Process of Building Construction (20)

PPTX
Basics of building construction
GHARBANWAO
 
DOCX
BUILDING CONSTRUCTION PROCESS FROM START TO FINISH 1.docx
Sudas Duddey
 
PPTX
Document design for presentation in class
rx135boy
 
PPTX
Residential building in Bangalore, Mysore, Mangalore, Karnataka, Hosur, Coimb...
SEO Tech Solution
 
PPTX
BUILDING CONSTRUCTION
vikramvirash
 
PDF
ab+ group SARL (1).pdf
ShaikhBilal24
 
PDF
ab+ group SARL (1).pdf
ShaikhBilal24
 
DOCX
Building Construction - An Overview.docx
info281501
 
PPTX
Building Construction powerpoint for diploma engineering students
AchintyaC
 
PPTX
Construction phases
Meesum Zaidi
 
DOCX
Building Construction Unveiled A Detailed Guide to Key Phases.docx
info281501
 
PPTX
(Avinash)residential building project
Vivek Kumar
 
PDF
SITE PREPARATION OF BUILDING CONSTRUCTION PROJECT.pdf
SolomonTeklu4
 
DOCX
Artscape_Developers best construction companies in Bangalore
Artscape Developer
 
PPTX
Building_Construction_Presentationpsnsfghh.pptx
nitinkumarrajpoot
 
PPTX
CONSTRUCTION and types of bonding MODULE final.pptx
SamitBrian
 
PPTX
kuku.pptx
JaiminTandel1
 
DOCX
Training Report
Ritika Vyas
 
DOCX
What are the stages of New Home Construction
Artscape Developer
 
DOCX
What are the 8 Steps of the Construction Process.docx
info281501
 
Basics of building construction
GHARBANWAO
 
BUILDING CONSTRUCTION PROCESS FROM START TO FINISH 1.docx
Sudas Duddey
 
Document design for presentation in class
rx135boy
 
Residential building in Bangalore, Mysore, Mangalore, Karnataka, Hosur, Coimb...
SEO Tech Solution
 
BUILDING CONSTRUCTION
vikramvirash
 
ab+ group SARL (1).pdf
ShaikhBilal24
 
ab+ group SARL (1).pdf
ShaikhBilal24
 
Building Construction - An Overview.docx
info281501
 
Building Construction powerpoint for diploma engineering students
AchintyaC
 
Construction phases
Meesum Zaidi
 
Building Construction Unveiled A Detailed Guide to Key Phases.docx
info281501
 
(Avinash)residential building project
Vivek Kumar
 
SITE PREPARATION OF BUILDING CONSTRUCTION PROJECT.pdf
SolomonTeklu4
 
Artscape_Developers best construction companies in Bangalore
Artscape Developer
 
Building_Construction_Presentationpsnsfghh.pptx
nitinkumarrajpoot
 
CONSTRUCTION and types of bonding MODULE final.pptx
SamitBrian
 
kuku.pptx
JaiminTandel1
 
Training Report
Ritika Vyas
 
What are the stages of New Home Construction
Artscape Developer
 
What are the 8 Steps of the Construction Process.docx
info281501
 
Ad

Recently uploaded (20)

PDF
Principles of Food Science and Nutritions
Dr. Yogesh Kumar Kosariya
 
PPTX
Module2 Data Base Design- ER and NF.pptx
gomathisankariv2
 
PDF
Top 10 read articles In Managing Information Technology.pdf
IJMIT JOURNAL
 
PPTX
Information Retrieval and Extraction - Module 7
premSankar19
 
PPTX
unit 3a.pptx material management. Chapter of operational management
atisht0104
 
PDF
Queuing formulas to evaluate throughputs and servers
gptshubham
 
PDF
EVS+PRESENTATIONS EVS+PRESENTATIONS like
saiyedaqib429
 
PDF
FLEX-LNG-Company-Presentation-Nov-2017.pdf
jbloggzs
 
PPTX
Chapter_Seven_Construction_Reliability_Elective_III_Msc CM
SubashKumarBhattarai
 
PPTX
ternal cell structure: leadership, steering
hodeeesite4
 
PDF
dse_final_merit_2025_26 gtgfffffcjjjuuyy
rushabhjain127
 
PDF
The Effect of Artifact Removal from EEG Signals on the Detection of Epileptic...
Partho Prosad
 
PPTX
EE3303-EM-I 25.7.25 electrical machines.pptx
Nagen87
 
PDF
Software Testing Tools - names and explanation
shruti533256
 
PPT
Ppt for engineering students application on field effect
lakshmi.ec
 
PPTX
Civil Engineering Practices_BY Sh.JP Mishra 23.09.pptx
bineetmishra1990
 
PDF
Chad Ayach - A Versatile Aerospace Professional
Chad Ayach
 
PPTX
Inventory management chapter in automation and robotics.
atisht0104
 
PDF
top-5-use-cases-for-splunk-security-analytics.pdf
yaghutialireza
 
PPTX
AgentX UiPath Community Webinar series - Delhi
RohitRadhakrishnan8
 
Principles of Food Science and Nutritions
Dr. Yogesh Kumar Kosariya
 
Module2 Data Base Design- ER and NF.pptx
gomathisankariv2
 
Top 10 read articles In Managing Information Technology.pdf
IJMIT JOURNAL
 
Information Retrieval and Extraction - Module 7
premSankar19
 
unit 3a.pptx material management. Chapter of operational management
atisht0104
 
Queuing formulas to evaluate throughputs and servers
gptshubham
 
EVS+PRESENTATIONS EVS+PRESENTATIONS like
saiyedaqib429
 
FLEX-LNG-Company-Presentation-Nov-2017.pdf
jbloggzs
 
Chapter_Seven_Construction_Reliability_Elective_III_Msc CM
SubashKumarBhattarai
 
ternal cell structure: leadership, steering
hodeeesite4
 
dse_final_merit_2025_26 gtgfffffcjjjuuyy
rushabhjain127
 
The Effect of Artifact Removal from EEG Signals on the Detection of Epileptic...
Partho Prosad
 
EE3303-EM-I 25.7.25 electrical machines.pptx
Nagen87
 
Software Testing Tools - names and explanation
shruti533256
 
Ppt for engineering students application on field effect
lakshmi.ec
 
Civil Engineering Practices_BY Sh.JP Mishra 23.09.pptx
bineetmishra1990
 
Chad Ayach - A Versatile Aerospace Professional
Chad Ayach
 
Inventory management chapter in automation and robotics.
atisht0104
 
top-5-use-cases-for-splunk-security-analytics.pdf
yaghutialireza
 
AgentX UiPath Community Webinar series - Delhi
RohitRadhakrishnan8
 

Process of Building Construction

  • 1. Process of Building Construction Presented By: Ayush N. Hajare (Diploma student, 2nd year, civil engineering)
  • 2. Building construction • Building construction is the process of adding structure to real property. • Building a construction step involve in any type of construction is not an easy task. • For building construction requires lots of time and it is tedious work, yet it's result is permanent asset for us. • Care should be taken in building construction, before planning, building construction projects must consider important aspects like the purpose of construction, utility, financial proficiency, the demand of work, etc. @ayushhajare
  • 3. Steps for pre- construction • To Acquire land or plot • To seek technical help • Prepare estimation and budgets • Permission from Authorities • Approach a builder @ayushhajare
  • 4. 1.To Acquire land or plot • It is the first and most important step in building construction,search for the location for the building which is best suited for building construction purpose. • Be careful while selecting land which has all the desired facilities available nearby and should be free from all land related issues. • It is necessary that collect information before buying land or plot by help of real estate agents or by online methods. @ayushhajare
  • 5. 2.To seek technical Help • After selecting land for building , take the help of a architect to create building designs and take advice. • Architect prepare plan as per building requirement, number of flats , shops based on your requirement and budgets. • Then after architect consult with structural engineer for details of the reinforcements to be used, how deep the foundation will be, size of gravel to be used, pillar width, etc. @ayushhajare
  • 6. 3.Preparing Estimate and budget • Building Construction involves a huge amount of material and budget. After, planning and structural detailing completed these details are transferred to the building estimator. • The building estimator will estimate the material quantity, quantity of different items of work, and prepare an abstract sheet that shows the cost of building Construction. @ayushhajare
  • 7. • If financial resources are limited, we need to seek pre- approving for loans in advance or else you may end up in a cash crunch situation.
  • 8. 4.Permissions from Authorities • This is most important process after construction, we have to take permission from local municipal body before you could go for the construct. • There are some documents required to get permission . This document may differ from state to state, but some are important for every building construction work. @ayushhajare
  • 9. • Following are the list of documents to get permission • Land survey: Survey of the land has to be carried out with the help of athorized land surveyor. • Soil test report of the land • Land documents • Architecture/ elevation/ sectional drawings • Structural reports • Architect certificate of undertaking on Record and certificate of the undertaking of Civil engineer on record. @ayushhajare
  • 10. 5. Approach a builder • It is necessary to choose a good builder or contractor for the construction work. Because the quality of work and time required for it depends on the work of builder, hence invistigations must be done. • The details of the work must be cleared in the contract document. The contract document should cover layout, work details, payment method and time scale. • All the condition of contract must be checked before signing it. @ayushhajare
  • 11. Steps during construction • Site preparation or leveling • Excavation and pcc • Foundation • Plinth beam and slab • Superstructure--Column • Brick masonry work • The lintel over door windows gaps • Floor slab or roof structure • Door window framing and fixations • Electrical and plumbing • Exterior finishing • Terrace and roof finishing • Internal finishing • Woodwork and fixture fittings
  • 12. 1.Site preparation or leveling • The construction site must be cleaned before the work is executed. • This work involves the removal of roots of trees , debris and leveling ground area. @ayushhajare
  • 13. 2. Excavation and PCC • The foundation of building ground is excavated with the help of excavating machines as per the building dimensions specified in drawings. • In this foundation trench, a layer of PCC ( plain cement concrete) is laid in dug portion before placing the reinforcements for the foundation. @ayushhajare
  • 14. 3. Foundation • The building supported on foundation is the lowermost part of the building that it is contact with the soil. • A building is load transferred from the superstructure to the soil and needs to be extremely strong to handle the load. • After the PCC work foundation reinforcement work is started, the foundation bottom level must check before concreting it and the remaining space between the foundation is filled with earth. @ayushhajare
  • 15. 4. Plinth beam and slab • After the foundation work is done ground beam form work preparation is started and poured with concrete. • Over the plinth beam , masonry work is started and space between foundation and plinth beam filled with soil. @ayushhajare
  • 16. 5.Superstructure - Column • The superstructure is the portion above the plinth level of the building. • The main component of superstructure is a column and beam. • The columns are built up to slab level and the frame for further Construction is prepared. @ayushhajare
  • 17. 6.Brick masonry work • As column and beam framework completed masonry work is started with different materials such as bricks, concrete blocks ,fly ash bricks, etc. according to building drawing. • Masonry work is done using a cement mortar mix,It is mixture of cement and sand. • As per drawing,gaps are laid for doors and windows during the masonry work. @ayushhajare
  • 18. 7. The lintel over door Windows gaps • The lintel is constructed on the door and window to support the masonry work over it. • After this further masonry work is done. @ayushhajare
  • 19. 8. Floor slab or roof structure • Then the formwork is started to construct slab resting on the column and beam. Over slab formwork, slab reinforcement is placed as per slab detailed drawing. @ayushhajare
  • 20. 9. Door window framing and fixations • After that door window frames are fixed at their specified position given in drawing. @ayushhajare
  • 21. 10. Electrical and plumbing • As we know that buildings are constructed with a clean finish in which electrical and plumbing work is not visible. • They are installed in the walls and slabs such that they are concealed and invisible after finishing work is done. • The point and pipe end left out such that they can be finished with electric fitting and plumbing fixtures. @ayushhajare
  • 23. 11. Exterior finishing • Once this work is completed, external plastering and finishing work is started. • Waterproofing is also done to prevent rising dampness in the wall. • External cladding can also be done to enhance the elevation of the house. @ayushhajare
  • 24. 12. Terrace and roof finishing • On top of the slab, waterproofing is done to prevent any leakage in slab. • Generally, terrazzo tilling is done to prevent the slab from a weathering effect. @ayushhajare
  • 25. 13. Internal finishing • Internal walls are plaster with smooth finishing and flooring is done with tiles. Later on, the walls are painted or textured. @ayushhajare
  • 26. 14. Woodwork and fixture fittings • It is last step is this process, almost construction work is completed and then after furniture work is started. • Paralley, electrical fitting, switchboard, and plumbing fittings are complete in the bathrooms and kitchen areas too. • The last step of building construction is interior decoration work in completing the building construction with proper furnishing and fabric used. @ayushhajare
  • 27. Conclusion • Hence, these are the basic steps of building construction, which can be divided into pre construction steps and during construction steps. Each and every step has there own importance in the complete procedure. Hence, for a proper work done, all these steps should be followed in proper manner. @ayushhajare