SlideShare a Scribd company logo
SESAR and the Military
SESAR and the Military
Jurgen Stegmeir, EDA
SESAR Research relevant for the
Military
Alain Siebert, SESAR JU
The military in SESAR Deployment
Jurgen Stegmeir (EDA) and
Mariagrazia Lapiscopia (SDM)
The Deployment Programme
Not just another plan…
DP 2015
INEA CALL 2014
PLAN CALL AWARD EXECUTE
INEA CALL 2015
SDM
IP
IP
IP
IP
IP
PDP v1
SESAR Deployment Manager Process
DP 2016 Next INEA CALL
States
NATO
OCCAR
SDM
DG MOVE
INEA
PLAN CALL AWARD EXECUTE
EDA Process in SESAR Deployment
Implementing
Partners
CEF CALL 2015 – SUMMARY
Starting date /Completion date
Total budget
Co-funding of eligible costs
65 multi stakeholder
projects
Member States
endorsement
Implementing
projects
16/02/2016 – 31/12/2020
EUR 2.411.021.917
EUR 1.188.258.056
223
27
6 Third Countries*
28 Twinned Proposal (IPs)
* Referring to countries where the Action is located (Switzerland, Norway, Turkey, Serbia, Montenegro and Macedonia). If only States the
Applicants come from are to be considered, there should be 4 third countries (Switzerland, Norway, Serbia and Macedonia)
83 Level 3 Beneficiaries:
 ANSPs: 29
 Airport Operators: 13
 Airspace Users: 16
 MET Service Provider: 10
 EUROCONTROL
 Industry/Providers: 7
 Military: 6
 SDM
2015 CEF Transport Calls for proposals:
Overview
12
5
3
4
AF1
AF3
AF5
AF6
Funding
50.1 mln
Funding
15.1 mln
Funding
14.4 mln
Funding
5.1 mln
Distribution of Military Projects
per ATM Functionality
FR : 1.8 UK : 14.3 ES : 4.2 NAPMA : 17.1 PT : 12.7
NL : 0.3 ES : 0.7 FR : 5.1 UK : 9
FR : 13.3 PT : 1.1
ES : 0.9 PT : 1.3 NAPMA : 2.9
• Upgrade of ATC Systems and ASM tools
• Data exchange between civil and military systems
• Interface with ACCS
• Multifrequency VDL2 for military aircraft
• RNP1 Equipage for transport and VIP platforms
• RNP1 Procedures Implementation and Design
Military Projects
SESAR Deployment: Take away
messages
• To have the best chances of success :
– Projects enhancing civil-military coordination (AF3 and AF5)
– Projects targeting gaps for high readiness families as described in
DP 2015
• Get ready for future calls:
– Gap analysis exercise as baseline for submission of project
proposals
– Indications of interest exercise in preparation for next INEA CEF
Calls
SESAR Deployment: Next Steps
The military community is already moving ahead through:
• EDA engagement with SDM
• Kick-off workshop on 17 March at EDA to start:
– Preparing military inputs for the consultation of the SESAR
Deployment Programme 2016
– Launching the preparation of military projects for the future INEA
Calls
• Building a better understanding of performance assessment for the
military
Thanks for your attention
#SESAR
@WorldATM_now

More Related Content

PDF
B1 jl marchand_jlgarcia_lgmota_roberta
PPT
SESAR at World ATM Congress 2016 - High Performing Aviation for Europe
PPT
SESAR at World ATM Congress 2016 - SESAR Awards
PDF
Le Bourget 2017 - Rotary Wing Unmanned Air Systems & Surveillance/Maritime Pa...
PDF
News on Satnav for GA
PPT
RPAS INTRODUCTION by Michael Standar
PPTX
GSA EGNOS and Galileo for Aviation
PDF
Aopa UK presentation by Martin Robinson
B1 jl marchand_jlgarcia_lgmota_roberta
SESAR at World ATM Congress 2016 - High Performing Aviation for Europe
SESAR at World ATM Congress 2016 - SESAR Awards
Le Bourget 2017 - Rotary Wing Unmanned Air Systems & Surveillance/Maritime Pa...
News on Satnav for GA
RPAS INTRODUCTION by Michael Standar
GSA EGNOS and Galileo for Aviation
Aopa UK presentation by Martin Robinson

What's hot (20)

PPT
SESAR at World ATM Congress 2016 - Exploratory Research programme
PDF
CLOSEYE PROJECT
PDF
Telespazio Geoinformation platform for Defense and Intelligence: Maritime Dom...
PDF
Leonardo Corporate Presentation 11 05 2016
PPTX
H2020-Galileo-2015-1 Call
PPTX
PPTX
Galileo Search & Rescue workshop_European Space Solutions 2016_The perspectiv...
PDF
Remote Tower Press Briefing Farnborough 2014
PPTX
F uturemed wp5_final_2
PPT
AUTOMATION: LESSONS LEARNT FROM SESAR by Michael Standar
PPTX
SESAR Project Awards - Best in class Nomination for Pj14.01.04
PPTX
Galileo Search & Rescue workshop_European Space Solutions 2016_GRICAS - Phili...
PPTX
H2020 2014 1st call GNSS Projects Portfolio
PPTX
Galileo Search & Rescue workshop_European Space Solutions 2016_GSA Welcome
PPT
iNATS: iPad App Guide for North Atlantic Tracks System, Aviation Assistance i...
PPTX
Opening Ceremony and Welcome: MG Fogarty at TechNet Augusta 2015
PDF
The Coming Revolution in Airspace Operation
PDF
European Rotors - PBN and GNSS for Rotorcraft Operations
PPT
Sesar General presentation
PDF
SOLAS - High Value (Telemetry)
SESAR at World ATM Congress 2016 - Exploratory Research programme
CLOSEYE PROJECT
Telespazio Geoinformation platform for Defense and Intelligence: Maritime Dom...
Leonardo Corporate Presentation 11 05 2016
H2020-Galileo-2015-1 Call
Galileo Search & Rescue workshop_European Space Solutions 2016_The perspectiv...
Remote Tower Press Briefing Farnborough 2014
F uturemed wp5_final_2
AUTOMATION: LESSONS LEARNT FROM SESAR by Michael Standar
SESAR Project Awards - Best in class Nomination for Pj14.01.04
Galileo Search & Rescue workshop_European Space Solutions 2016_GRICAS - Phili...
H2020 2014 1st call GNSS Projects Portfolio
Galileo Search & Rescue workshop_European Space Solutions 2016_GSA Welcome
iNATS: iPad App Guide for North Atlantic Tracks System, Aviation Assistance i...
Opening Ceremony and Welcome: MG Fogarty at TechNet Augusta 2015
The Coming Revolution in Airspace Operation
European Rotors - PBN and GNSS for Rotorcraft Operations
Sesar General presentation
SOLAS - High Value (Telemetry)
Ad

Viewers also liked (8)

PDF
A2 p alty k delcourte_d bardelli_f serdot omer_luigi brucculeri
PPT
SGD 2016 - Welcome
PPTX
SGD 2016 - Introduction
PPT
SESAR at World ATM Congress 2016 - SESAR Virtual Centres
PPTX
SGD 2016 - Scenario DEMO#1
PPTX
SGD 2016 - Event closure
PPT
SGD 2016 - Systems explanation DEMO#1
PDF
Day 2 1730 b3 r garrity b reder_ m watson_n watson
A2 p alty k delcourte_d bardelli_f serdot omer_luigi brucculeri
SGD 2016 - Welcome
SGD 2016 - Introduction
SESAR at World ATM Congress 2016 - SESAR Virtual Centres
SGD 2016 - Scenario DEMO#1
SGD 2016 - Event closure
SGD 2016 - Systems explanation DEMO#1
Day 2 1730 b3 r garrity b reder_ m watson_n watson
Ad

More from SESAR Joint Undertaking (18)

PPT
SGD 2016 - Lessons learned
PPTX
SGD 2016 - Scenario DEMO#4.1
PPT
SGD 2016 - Systems explanation DEMO#4.1
PPTX
SGD 2016 - Scenario DEMO#3
PPT
SGD 2016 - Systems explanation DEMO#3
PPT
SGD 2016 - DEMO#1: Architecture
PDF
A3 p alty s. mahlich_p sanchez escalonilla
PPT
SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92
PPTX
SESAR at World ATM Congress 2016 - Spectrum workshop
PDF
Sesar swim master class best in class 2014 solitec
PDF
Sesar swim master class best in class 2014 selex es
PDF
Sesar swim master class best in class 2014 overview of the submissions
PDF
Sesar swim master class best in class 2014 luciad
PDF
Sesar swim master class best in class 2014 flight aware
PDF
Sesar swim master class best in class 2014 announcement award winning proposals
PDF
Sesar swim master class best in class 2014 airbus
PDF
Sesar swim master class best in class 2014 next steps
PDF
Sesar swim master class best in class 2014 beyond the horizon
SGD 2016 - Lessons learned
SGD 2016 - Scenario DEMO#4.1
SGD 2016 - Systems explanation DEMO#4.1
SGD 2016 - Scenario DEMO#3
SGD 2016 - Systems explanation DEMO#3
SGD 2016 - DEMO#1: Architecture
A3 p alty s. mahlich_p sanchez escalonilla
SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92
SESAR at World ATM Congress 2016 - Spectrum workshop
Sesar swim master class best in class 2014 solitec
Sesar swim master class best in class 2014 selex es
Sesar swim master class best in class 2014 overview of the submissions
Sesar swim master class best in class 2014 luciad
Sesar swim master class best in class 2014 flight aware
Sesar swim master class best in class 2014 announcement award winning proposals
Sesar swim master class best in class 2014 airbus
Sesar swim master class best in class 2014 next steps
Sesar swim master class best in class 2014 beyond the horizon

Recently uploaded (20)

PPTX
CroxyProxy Instagram Access id login.pptx
PDF
BLW VOCATIONAL TRAINING SUMMER INTERNSHIP REPORT
PPTX
PA Analog/Digital System: The Backbone of Modern Surveillance and Communication
PPTX
How to Build Crypto Derivative Exchanges from Scratch.pptx
PDF
DevOps & Developer Experience Summer BBQ
PDF
madgavkar20181017ppt McKinsey Presentation.pdf
PDF
Chapter 3 Spatial Domain Image Processing.pdf
PPTX
Comunidade Salesforce São Paulo - Desmistificando o Omnistudio (Vlocity)
PPTX
Understanding_Digital_Forensics_Presentation.pptx
PPTX
Belt and Road Supply Chain Finance Blockchain Solution
PDF
creating-agentic-ai-solutions-leveraging-aws.pdf
PPTX
Effective Security Operations Center (SOC) A Modern, Strategic, and Threat-In...
PDF
Dell Pro 14 Plus: Be better prepared for what’s coming
PDF
Building High-Performance Oracle Teams: Strategic Staffing for Database Manag...
PDF
solutions_manual_-_materials___processing_in_manufacturing__demargo_.pdf
PPTX
breach-and-attack-simulation-cybersecurity-india-chennai-defenderrabbit-2025....
PDF
Chapter 2 Digital Image Fundamentals.pdf
PDF
A Day in the Life of Location Data - Turning Where into How.pdf
PDF
Sensors and Actuators in IoT Systems using pdf
PDF
Google’s NotebookLM Unveils Video Overviews
CroxyProxy Instagram Access id login.pptx
BLW VOCATIONAL TRAINING SUMMER INTERNSHIP REPORT
PA Analog/Digital System: The Backbone of Modern Surveillance and Communication
How to Build Crypto Derivative Exchanges from Scratch.pptx
DevOps & Developer Experience Summer BBQ
madgavkar20181017ppt McKinsey Presentation.pdf
Chapter 3 Spatial Domain Image Processing.pdf
Comunidade Salesforce São Paulo - Desmistificando o Omnistudio (Vlocity)
Understanding_Digital_Forensics_Presentation.pptx
Belt and Road Supply Chain Finance Blockchain Solution
creating-agentic-ai-solutions-leveraging-aws.pdf
Effective Security Operations Center (SOC) A Modern, Strategic, and Threat-In...
Dell Pro 14 Plus: Be better prepared for what’s coming
Building High-Performance Oracle Teams: Strategic Staffing for Database Manag...
solutions_manual_-_materials___processing_in_manufacturing__demargo_.pdf
breach-and-attack-simulation-cybersecurity-india-chennai-defenderrabbit-2025....
Chapter 2 Digital Image Fundamentals.pdf
A Day in the Life of Location Data - Turning Where into How.pdf
Sensors and Actuators in IoT Systems using pdf
Google’s NotebookLM Unveils Video Overviews

SESAR at World ATM Congress 2016 - SESAR and the Military

  • 1. SESAR and the Military
  • 2. SESAR and the Military Jurgen Stegmeir, EDA
  • 3. SESAR Research relevant for the Military Alain Siebert, SESAR JU
  • 4. The military in SESAR Deployment Jurgen Stegmeir (EDA) and Mariagrazia Lapiscopia (SDM)
  • 5. The Deployment Programme Not just another plan… DP 2015 INEA CALL 2014 PLAN CALL AWARD EXECUTE INEA CALL 2015 SDM IP IP IP IP IP PDP v1 SESAR Deployment Manager Process DP 2016 Next INEA CALL
  • 6. States NATO OCCAR SDM DG MOVE INEA PLAN CALL AWARD EXECUTE EDA Process in SESAR Deployment Implementing Partners
  • 7. CEF CALL 2015 – SUMMARY Starting date /Completion date Total budget Co-funding of eligible costs 65 multi stakeholder projects Member States endorsement Implementing projects 16/02/2016 – 31/12/2020 EUR 2.411.021.917 EUR 1.188.258.056 223 27 6 Third Countries* 28 Twinned Proposal (IPs) * Referring to countries where the Action is located (Switzerland, Norway, Turkey, Serbia, Montenegro and Macedonia). If only States the Applicants come from are to be considered, there should be 4 third countries (Switzerland, Norway, Serbia and Macedonia) 83 Level 3 Beneficiaries:  ANSPs: 29  Airport Operators: 13  Airspace Users: 16  MET Service Provider: 10  EUROCONTROL  Industry/Providers: 7  Military: 6  SDM 2015 CEF Transport Calls for proposals: Overview
  • 8. 12 5 3 4 AF1 AF3 AF5 AF6 Funding 50.1 mln Funding 15.1 mln Funding 14.4 mln Funding 5.1 mln Distribution of Military Projects per ATM Functionality FR : 1.8 UK : 14.3 ES : 4.2 NAPMA : 17.1 PT : 12.7 NL : 0.3 ES : 0.7 FR : 5.1 UK : 9 FR : 13.3 PT : 1.1 ES : 0.9 PT : 1.3 NAPMA : 2.9
  • 9. • Upgrade of ATC Systems and ASM tools • Data exchange between civil and military systems • Interface with ACCS • Multifrequency VDL2 for military aircraft • RNP1 Equipage for transport and VIP platforms • RNP1 Procedures Implementation and Design Military Projects
  • 10. SESAR Deployment: Take away messages • To have the best chances of success : – Projects enhancing civil-military coordination (AF3 and AF5) – Projects targeting gaps for high readiness families as described in DP 2015 • Get ready for future calls: – Gap analysis exercise as baseline for submission of project proposals – Indications of interest exercise in preparation for next INEA CEF Calls
  • 11. SESAR Deployment: Next Steps The military community is already moving ahead through: • EDA engagement with SDM • Kick-off workshop on 17 March at EDA to start: – Preparing military inputs for the consultation of the SESAR Deployment Programme 2016 – Launching the preparation of military projects for the future INEA Calls • Building a better understanding of performance assessment for the military
  • 12. Thanks for your attention #SESAR @WorldATM_now