Software Project Management: ResearchColab- Budget (Document-12)
Presented in 4th year of Bachelor of Science in Software Engineering (BSSE) course at Institute of Information Technology, University of Dhaka (IIT, DU).
PMBoK 6 - Chapter 9 for Project Resource Management.
This presentation material is presented for CAPM students of Telkom University Bandung, Indonesia on 16 December 2018.
Ch 9 project monitoring & control updatedFarhana Rehman
Project monitoring and control involves collecting project performance data, comparing actual performance to the plan, and taking corrective actions when needed. Key aspects of project control include planning performance, measuring status, comparing to the baseline to identify variances, and taking corrective actions. Earned value analysis is a technique that compares planned, actual, and earned values to analyze schedule and cost performance. It provides variances, indexes, and estimates that help project managers understand project status and forecast completion.
Software Project Management: Project SummaryMinhas Kamal
Software Project Management: ResearchColab- Project Summary (Document-13)
Presented in 4th year of Bachelor of Science in Software Engineering (BSSE) course at Institute of Information Technology, University of Dhaka (IIT, DU).
The document outlines a presentation on project communication management. It discusses the importance of communication management, defining it as ensuring timely and appropriate planning, collection, creation, distribution, storage, retrieval, management, control, monitoring, and disposition of project information. It also covers communicating with stakeholders, various communication forms and tools, developing a communication plan, addressing requirements problems, and controlling communications.
Software Project Management: Project PlanningMinhas Kamal
Software Project Management: ResearchColab- Project Planning (Document-4)
Presented in 4th year of Bachelor of Science in Software Engineering (BSSE) course at Institute of Information Technology, University of Dhaka (IIT, DU).
Project scope management includes processes for defining and controlling what work needs to be done to deliver the project, beginning with developing a scope management plan, collecting requirements, and creating a detailed project scope statement that outlines the deliverables, exclusions, assumptions and acceptance criteria. It also involves breaking the work down into a work breakdown structure and validating that the project scope accurately reflects stakeholder needs through requirements traceability and change control. Effective scope management is crucial for project success by ensuring the project includes all necessary work and only the work required to complete the project.
The concepts and processes on how to perform project schedule management according to PMBOK Guide 6th edition. You'll find key concepts and terms, plan schedule management, define activities, sequence activities, estimate activity duration, develop schedule, and control schedule.
The document discusses developing a project plan and network. It covers constructing a project network using activity-on-node (AON) terminology. The key steps are:
1) Developing a work breakdown structure (WBS) and identifying each activity with a unique number.
2) Constructing the network using AON, with activities represented by nodes and dependencies by arrows.
3) Performing forward and backward passes to calculate earliest/latest start and finish times and determine the critical path.
4) Analyzing slack to identify which activities have no flexibility in scheduling.
different sectors related to project and their classifications on basis of level of technology, scope and significance, size and scale, purpose, ownership and speed of implementation
This document outlines the seven phases of the project life cycle: initiation, planning, execution, monitoring and control, and closeout. It describes the key activities and outputs for each phase. The initiation phase involves selecting a project manager and defining objectives. The planning phase develops detailed plans for tasks, schedule, budget, roles and communication. Execution involves executing the plans, and monitoring and control compares results to metrics and identifies variances. The closeout phase hands over the final product and archives lessons learned.
Learn the 5 Key Project Management Phases that every project manager knows. Perfect information for those business professionals curious about how project managers plan their projects.
1. Project control through accurate progress reporting and monitoring is essential to identify issues early when corrective actions can be most effective. Overly optimistic reporting can mask delays until it is too late to remedy problems.
2. Data capture from project participants is key to monitoring progress. Structured reporting templates aligned with the project plan help ensure accurate and consistent information.
3. Effective project control involves setting performance targets with participants, documenting discussions, and using action lists to track and follow up on tasks. Regular communication and status updates are needed to keep the project on track.
This document summarizes a presentation on project scheduling. It discusses key terminology like milestones and activities. The basic steps of project management are defined including defining activities, sequencing, estimating resources and durations, developing a schedule, and controlling the schedule. Techniques for project scheduling are described, including work breakdown structures (WBS), Gantt charts, critical path method (CPM), and Program Evaluation Review Technique (PERT). WBS involves breaking down large projects into smaller, more manageable tasks. Gantt charts, CPM, and PERT are network-based scheduling methods that use diagrams to show task relationships and identify the critical path.
This is the part of the presentation done by a PMP Workgroup which includes the project managers from NashTech, Trobz and Besco to study the Project Management and get the PMP certification. This part describes the process of Estimate Activity Durations in the Project Schedule Management knowledge area.
This document discusses project costs, budgeting, and appraisal. It defines key terms like project costs, classifications of costs, and budgeting. It explains methods for forecasting, budgeting, and appraising projects. Project appraisal techniques like payback period, accounting rate of return, and net present value are explained in detail. Factors that affect project costs and the importance of project cost management are also discussed.
Give the Information about the Function and How to find the best Resources for our Project that we Have.
This Presentation make the direction for you to easily handle your project
This document discusses project management and the critical path method technique. It defines project management as planning, directing, and controlling resources to meet time, cost, and technical constraints. The critical path method allows project managers to identify the critical activities and completion time of a project by determining the earliest and latest times of each activity. The document provides examples of constructing critical path networks and calculating key timing metrics to schedule and control a project.
The document discusses integrating cost and schedule data from different sources. It emphasizes that while project work can be grouped by individual disciplines like cost and schedule, these areas must ultimately be integrated as a single unit. It provides examples of integrating actual cost data from SAP and funding/forecast data from Oracle Hyperion into a Primavera P6 schedule using macros, web services, and import files to process large volumes of project data on a monthly basis. The document stresses the importance of defining integration rules and templates to ensure the right data is imported into the correct activities and work breakdown structure levels in P6.
The concepts and processes on how to perform project cost management according to PMBOK Guide 6th edition. You'll find key concepts and terms, plan cost management, estimate costs, determine budget, and control cost.
This document discusses monitoring and controlling projects. It outlines three scenarios for projects: when they go as planned, when there are changes from stakeholders, and when risks occur. When projects go as planned, the project manager follows the plan, do, check, act cycle to monitor progress. When changes are requested, an integrated change management process is followed, involving change requests, a change control board, and adjusting baselines. Risks can also lead to change requests if their impacts require action. The overall goal is for the project manager to control changes and maintain the project plan.
Cost management involves planning, estimating, budgeting, and controlling costs to complete a project within budget. Common cost estimating techniques include analogous, parametric, and bottom-up estimating. Earned value management is used to measure project performance by comparing planned, earned, and actual costs and schedules.
This document introduces earned value analysis (EVA), a project management technique that integrates scope, schedule, and cost to measure performance. It defines key EVA terms like budgeted cost of work performed, actual cost, earned value, and planned value. Metrics like cost variance, schedule variance, cost performance index, and estimate at completion are also explained. An example project is used to demonstrate how to calculate these metrics. The document proposes implementing EVA for ATCO projects by developing a module in their EIS system to track EVA parameters and metrics on a monthly basis. A plan is outlined to get feedback, train users, and start the new EVA process.
The document discusses project integration management which involves coordinating all project management processes throughout a project's life cycle. It outlines developing key project documents like the project charter, scope statement, and management plan. It also discusses the typical project life cycle phases of concept, development, implementation, and close-out. Overall, the document provides an overview of integrating the key elements and processes involved in managing a project from start to finish.
The document discusses various aspects of project planning and management including:
1. The planning process which involves project identification, formulation, and preparation including market analysis, technical factors, and project appraisal.
2. Methods of project budgeting, cost estimation, and risk management.
3. Tools used in project planning such as the work breakdown structure, scheduling, budgeting, and forecasting.
4. The importance of market analysis and demand forecasting in the planning process.
The document discusses developing a project plan and network. It covers constructing a project network using activity-on-node (AON) terminology. The key steps are:
1) Developing a work breakdown structure (WBS) and identifying each activity with a unique number.
2) Constructing the network using AON, with activities represented by nodes and dependencies by arrows.
3) Performing forward and backward passes to calculate earliest/latest start and finish times and determine the critical path.
4) Analyzing slack to identify which activities have no flexibility in scheduling.
different sectors related to project and their classifications on basis of level of technology, scope and significance, size and scale, purpose, ownership and speed of implementation
This document outlines the seven phases of the project life cycle: initiation, planning, execution, monitoring and control, and closeout. It describes the key activities and outputs for each phase. The initiation phase involves selecting a project manager and defining objectives. The planning phase develops detailed plans for tasks, schedule, budget, roles and communication. Execution involves executing the plans, and monitoring and control compares results to metrics and identifies variances. The closeout phase hands over the final product and archives lessons learned.
Learn the 5 Key Project Management Phases that every project manager knows. Perfect information for those business professionals curious about how project managers plan their projects.
1. Project control through accurate progress reporting and monitoring is essential to identify issues early when corrective actions can be most effective. Overly optimistic reporting can mask delays until it is too late to remedy problems.
2. Data capture from project participants is key to monitoring progress. Structured reporting templates aligned with the project plan help ensure accurate and consistent information.
3. Effective project control involves setting performance targets with participants, documenting discussions, and using action lists to track and follow up on tasks. Regular communication and status updates are needed to keep the project on track.
This document summarizes a presentation on project scheduling. It discusses key terminology like milestones and activities. The basic steps of project management are defined including defining activities, sequencing, estimating resources and durations, developing a schedule, and controlling the schedule. Techniques for project scheduling are described, including work breakdown structures (WBS), Gantt charts, critical path method (CPM), and Program Evaluation Review Technique (PERT). WBS involves breaking down large projects into smaller, more manageable tasks. Gantt charts, CPM, and PERT are network-based scheduling methods that use diagrams to show task relationships and identify the critical path.
This is the part of the presentation done by a PMP Workgroup which includes the project managers from NashTech, Trobz and Besco to study the Project Management and get the PMP certification. This part describes the process of Estimate Activity Durations in the Project Schedule Management knowledge area.
This document discusses project costs, budgeting, and appraisal. It defines key terms like project costs, classifications of costs, and budgeting. It explains methods for forecasting, budgeting, and appraising projects. Project appraisal techniques like payback period, accounting rate of return, and net present value are explained in detail. Factors that affect project costs and the importance of project cost management are also discussed.
Give the Information about the Function and How to find the best Resources for our Project that we Have.
This Presentation make the direction for you to easily handle your project
This document discusses project management and the critical path method technique. It defines project management as planning, directing, and controlling resources to meet time, cost, and technical constraints. The critical path method allows project managers to identify the critical activities and completion time of a project by determining the earliest and latest times of each activity. The document provides examples of constructing critical path networks and calculating key timing metrics to schedule and control a project.
The document discusses integrating cost and schedule data from different sources. It emphasizes that while project work can be grouped by individual disciplines like cost and schedule, these areas must ultimately be integrated as a single unit. It provides examples of integrating actual cost data from SAP and funding/forecast data from Oracle Hyperion into a Primavera P6 schedule using macros, web services, and import files to process large volumes of project data on a monthly basis. The document stresses the importance of defining integration rules and templates to ensure the right data is imported into the correct activities and work breakdown structure levels in P6.
The concepts and processes on how to perform project cost management according to PMBOK Guide 6th edition. You'll find key concepts and terms, plan cost management, estimate costs, determine budget, and control cost.
This document discusses monitoring and controlling projects. It outlines three scenarios for projects: when they go as planned, when there are changes from stakeholders, and when risks occur. When projects go as planned, the project manager follows the plan, do, check, act cycle to monitor progress. When changes are requested, an integrated change management process is followed, involving change requests, a change control board, and adjusting baselines. Risks can also lead to change requests if their impacts require action. The overall goal is for the project manager to control changes and maintain the project plan.
Cost management involves planning, estimating, budgeting, and controlling costs to complete a project within budget. Common cost estimating techniques include analogous, parametric, and bottom-up estimating. Earned value management is used to measure project performance by comparing planned, earned, and actual costs and schedules.
This document introduces earned value analysis (EVA), a project management technique that integrates scope, schedule, and cost to measure performance. It defines key EVA terms like budgeted cost of work performed, actual cost, earned value, and planned value. Metrics like cost variance, schedule variance, cost performance index, and estimate at completion are also explained. An example project is used to demonstrate how to calculate these metrics. The document proposes implementing EVA for ATCO projects by developing a module in their EIS system to track EVA parameters and metrics on a monthly basis. A plan is outlined to get feedback, train users, and start the new EVA process.
The document discusses project integration management which involves coordinating all project management processes throughout a project's life cycle. It outlines developing key project documents like the project charter, scope statement, and management plan. It also discusses the typical project life cycle phases of concept, development, implementation, and close-out. Overall, the document provides an overview of integrating the key elements and processes involved in managing a project from start to finish.
The document discusses various aspects of project planning and management including:
1. The planning process which involves project identification, formulation, and preparation including market analysis, technical factors, and project appraisal.
2. Methods of project budgeting, cost estimation, and risk management.
3. Tools used in project planning such as the work breakdown structure, scheduling, budgeting, and forecasting.
4. The importance of market analysis and demand forecasting in the planning process.
The document discusses project budget management. It defines a project budget as the total money allocated for a project over a specific time period. Budgeting is performed early in planning to estimate costs. There are three types of budget estimates - rough, contract, and definitive - that vary in accuracy. The key steps are determining resource needs, estimating costs, developing the budget document, getting approval, creating a baseline, publishing the budget, executing expenses, and controlling the budget.
The document discusses the project management life cycle which includes 5 process groups: initiating, planning, executing, monitoring and controlling, and closing. It also discusses the 10 knowledge areas that are core to project management according to PMI. The process groups involve defining a project, planning how to execute it, carrying out the work, tracking progress, and finally closing the project. The knowledge areas provide the technical skills needed for effective project management.
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET Journal
This document discusses planning and scheduling a residential construction project using Microsoft Project. It summarizes the key steps:
1) The activities of constructing two residential blocks were planned and scheduled in MSP, including allocating resources, determining task relationships, and generating a Gantt chart.
2) The total baseline duration of the project was estimated to be 632 days with a total cost of Rs. 154,394,081.
3) Planning and scheduling the project in MSP allowed determining the critical path and monitoring project progress and costs.
This document provides an overview of topics related to industrial project management, including human resource management, project cost estimating, financial principles, investment analysis, and project financing and budgeting. It discusses developing a human resource management plan, estimating project costs using different methods, the importance of investment analysis, and creating a project budget by breaking the project into tasks and milestones and estimating costs. The document is intended to educate students in an MSc program on key aspects of managing industrial projects.
The simplified project management process it-toolkitsIT-Toolkits.org
One of the challenges of explaining project management to people who are unfamiliar with the approach, is that descriptions are often either so high-level as to be meaningless, or so detailed that they are overwhelming. Over the years, I have come to use a model as a framework for introducing and discussing project management tools and techniques. It can be used as the basis for a five-minute explanation of what is involved in project management, but also as an outline for more detailed discussions. (The actual model can be found on the Key Consulting website under free templates and info.)
Project management involves four main phases: initiating, planning, executing, and closing. The initiating phase involves establishing the project team and management procedures. Planning defines tasks, schedules, resources, and risks. Execution involves implementing the project plan, monitoring progress, and managing changes. Finally, closing includes finalizing documentation, conducting reviews, and closing out the project.
1. The document provides guidance on developing an effective project schedule according to generally accepted good practices. It discusses scheduling roles and responsibilities, the purpose of a project schedule, and planning versus scheduling.
2. Key aspects of designing an effective project schedule that are covered include determining an appropriate level of detail, status update cycle, and time scale for activities. The overall process of developing a project schedule is also outlined.
3. An effective project schedule is a dynamic tool that provides a roadmap for completing project work successfully and allows monitoring of progress to make accurate projections.
This document discusses project planning and scheduling for the construction of a residential building. It provides an overview of the project, which involves constructing a G+1 building of approximately 1100 square feet in Shahnoorwadi, India. It describes collecting project data, using the Primavera Project Planner software to develop a network diagram and schedule, and generating reports to analyze the critical path of the project. The objectives are to prepare a CPM chart for the building and gain experience using the Primavera scheduling tool.
The document discusses various communication tools used to manage project time, including introducing the baseline schedule, change control plan, change requests, Gantt charts, logic network diagrams, project milestone lists, project scheduling tools, and schedule management plans. It provides details on each tool, how project managers can use them to communicate with stakeholders, and the benefits they provide for time management and tracking project progress.
Project planning is an important part of software project management that involves breaking down the work, allocating resources, and creating a schedule. It occurs at three stages: proposal, project startup, and periodically throughout the project. The project plan sets out the resources, work breakdown structure, and schedule. It identifies risks and describes the organization, requirements, activities, milestones, and monitoring mechanisms. The planning process establishes constraints and assesses parameters, defines deliverables and milestones, draws up and updates the schedule, and reviews progress, revising estimates as needed.
The document describes the purpose and processes of project planning at the detail level. It involves further defining project parameters, refining scope, schedule and budget, developing additional project team members, and confirming sponsorship. Key processes include conducting a kickoff meeting, developing a detailed project plan, performing risk assessment, refining management plans, and gaining final approval to proceed with project execution.
Most Popular 20 Evergreen Project Management TermsSHAZEBALIKHAN1
Project management requires a deep understanding of the jargon and terminology for effective implementation of practices. The article presents 20 popular and common terms of project management
This document provides a project management plan template for an economic development department. It includes sections on the project introduction and background, executive summary, scope, work breakdown structure, cost and staffing management plans, stakeholder analysis, implementation plan, risk management plan, procurement management plan, log frame, evaluation plan, and annexures including a target setting worksheet and reporting template. The template provides guidance on the key elements to include in each section to effectively plan and manage the project.
This document provides an outline for beginners on digital image processing. It discusses key concepts such as images being represented as 2D matrices of pixels, pixel color represented by color models like RGB and CMY, image sampling and quantization, common image processing operations like filtering and morphological operations. It provides examples of different types of filters and morphological operations. Finally, it discusses applications of image processing like contrast enhancement, noise reduction, segmentation and more advanced applications when combined with machine learning.
Deep Learning - Exploring The Magical World of Neural NetworkMinhas Kamal
The document provides an introduction to machine learning and neural networks. It explains that machine learning allows a system to learn from data rather than through explicit programming. The document then discusses neurons and how they are the basic unit of a neural network, functioning similarly to mathematical functions. It provides an example of using a single neuron to solve a classification problem. The document explains how the neuron's weights are learned through an error-based training process. It suggests expanding the network to include multiple interconnected neurons and layers to perform more complex tasks like deep learning.
Machine Learning - Entering into The Wonderful Galaxy of Machine LearningMinhas Kamal
This document provides an overview of machine learning. It discusses what machine learning is, the different types including supervised vs. unsupervised learning and regression vs. classification problems. It also summarizes several common machine learning techniques like linear regression, Naive Bayes, k-means clustering, decision trees, random forests, AdaBoost, support vector machines, recurrent neural networks, and convolutional neural networks. The document aims to introduce readers to the "wonderful galaxy of machine learning."
Artificial Intelligence - Staring at The Grand Universe of AI (1)Minhas Kamal
This document provides an introduction to artificial intelligence. It discusses what AI is and is not, the subfields of AI including computer vision, evolutionary computation, pattern recognition and machine learning. It explains why AI is important and some of its current applications like personal assistants, image generation and analysis. The document is meant to serve as an introduction for learning about the "grand universe of AI". It contains 11 slides on these topics to provide a high-level overview of the field.
Final Project Report- Bengali Braille to Text TranslatorMinhas Kamal
Complete Project Report on software project- Bengali Braille to Text Translator. Chapters- Software Requirement Specification (SRS), Architectural Design, User Interface Design, Testing, User Manual.
Created in 4th year of Bachelor of Science in Software Engineering (BSSE) course at Institute of Information Technology, University of Dhaka (IIT, DU).
Abstract- Bengali Braille to Text TranslatorMinhas Kamal
Abstract on a software project- Bengali Braille to Text Translator.
Created in 4th year of Bachelor of Science in Software Engineering (BSSE) course at Institute of Information Technology, University of Dhaka (IIT, DU).
Software Project Management: Testing DocumentMinhas Kamal
This document outlines the testing plan for an application called ResearchCoLab. It details test items, strategy, required tools, measures, pass/fail criteria, responsibilities, and schedule. Test cases are provided to test database integrity, system response time under load, user access permissions, compatibility across configurations, and implemented features such as user registration and login. The goal is to thoroughly test the application according to best practices before the scheduled submission date.
Software Project Management: Change ControlMinhas Kamal
Software Project Management: ResearchColab- Change Control (Document-10)
Presented in 4th year of Bachelor of Science in Software Engineering (BSSE) course at Institute of Information Technology, University of Dhaka (IIT, DU).
Software Project Management: Release NotesMinhas Kamal
Software Project Management: ResearchColab- Release Notes (Document-9)
Presented in 4th year of Bachelor of Science in Software Engineering (BSSE) course at Institute of Information Technology, University of Dhaka (IIT, DU).
Software Project Management: Configuration ManagementMinhas Kamal
Software Project Management: ResearchColab- Configuration Management (Document-8)
Presented in 4th year of Bachelor of Science in Software Engineering (BSSE) course at Institute of Information Technology, University of Dhaka (IIT, DU).
Software Project Management: Risk ManagementMinhas Kamal
Software Project Management: ResearchColab- Risk Management (Document-7)
Presented in 4th year of Bachelor of Science in Software Engineering (BSSE) course at Institute of Information Technology, University of Dhaka (IIT, DU).
Software Project Management: Software ArchitectureMinhas Kamal
Software Project Management: ResearchColab- Software Architecture (Document-6)
Presented in 4th year of Bachelor of Science in Software Engineering (BSSE) course at Institute of Information Technology, University of Dhaka (IIT, DU).
Software Project Management: Software Requirement SpecificationMinhas Kamal
Software Project Management: ResearchColab- Software Requirement Specification (Document-5)
Presented in 4th year of Bachelor of Science in Software Engineering (BSSE) course at Institute of Information Technology, University of Dhaka (IIT, DU).
Software Project Management: Business CaseMinhas Kamal
Software Project Management: ResearchColab- Business Case (Document-3)
Presented in 4th year of Bachelor of Science in Software Engineering (BSSE) course at Institute of Information Technology, University of Dhaka (IIT, DU).
Software Project Management: Project InitiationMinhas Kamal
Software Project Management: ResearchColab- Project Initiation (Document-1)
Presented in 4th year of Bachelor of Science in Software Engineering (BSSE) course at Institute of Information Technology, University of Dhaka (IIT, DU).
Software Project Management: Project CharterMinhas Kamal
Software Project Management: ResearchColab- Project Charter (Document-1.1)
Presented in 4th year of Bachelor of Science in Software Engineering (BSSE) course at Institute of Information Technology, University of Dhaka (IIT, DU).
Software Project Management Presentation FinalMinhas Kamal
Software Project Management- ResearchColab
Presented in 4th year of Bachelor of Science in Software Engineering (BSSE) course at Institute of Information Technology, University of Dhaka (IIT, DU).
Software Requirements Specification on Bengali Braille to Text TranslatorMinhas Kamal
Complete Software Requirements Specification (SRS) on a software project Bengali Braille to Text Translator. Chapters- Inception, Elicitation, Scenario-Based Model, Data Model, Class-Based Model, and Behavioral Model.
Created in 4th year of Bachelor of Science in Software Engineering (BSSE) course at Institute of Information Technology, University of Dhaka (IIT, DU).
Project Proposal: Bengali Braille to Text TranslationMinhas Kamal
Software Project Proposal- Bengali Braille to Text Translation
Presented in 4th year of Bachelor of Science in Software Engineering (BSSE) course at Institute of Information Technology, University of Dhaka (IIT, DU).
Software Project Proposal: Bengali Braille to Text TranslationMinhas Kamal
Software Project Proposal- Bengali Braille to Text Translation
Presented in 4th year of Bachelor of Science in Software Engineering (BSSE) course at Institute of Information Technology, University of Dhaka (IIT, DU).
How can one start with crypto wallet development.pptxlaravinson24
This presentation is a beginner-friendly guide to developing a crypto wallet from scratch. It covers essential concepts such as wallet types, blockchain integration, key management, and security best practices. Ideal for developers and tech enthusiasts looking to enter the world of Web3 and decentralized finance.
Not So Common Memory Leaks in Java WebinarTier1 app
This SlideShare presentation is from our May webinar, “Not So Common Memory Leaks & How to Fix Them?”, where we explored lesser-known memory leak patterns in Java applications. Unlike typical leaks, subtle issues such as thread local misuse, inner class references, uncached collections, and misbehaving frameworks often go undetected and gradually degrade performance. This deck provides in-depth insights into identifying these hidden leaks using advanced heap analysis and profiling techniques, along with real-world case studies and practical solutions. Ideal for developers and performance engineers aiming to deepen their understanding of Java memory management and improve application stability.
Adobe Lightroom Classic Crack FREE Latest link 2025kashifyounis067
🌍📱👉COPY LINK & PASTE ON GOOGLE http://drfiles.net/ 👈🌍
Adobe Lightroom Classic is a desktop-based software application for editing and managing digital photos. It focuses on providing users with a powerful and comprehensive set of tools for organizing, editing, and processing their images on their computer. Unlike the newer Lightroom, which is cloud-based, Lightroom Classic stores photos locally on your computer and offers a more traditional workflow for professional photographers.
Here's a more detailed breakdown:
Key Features and Functions:
Organization:
Lightroom Classic provides robust tools for organizing your photos, including creating collections, using keywords, flags, and color labels.
Editing:
It offers a wide range of editing tools for making adjustments to color, tone, and more.
Processing:
Lightroom Classic can process RAW files, allowing for significant adjustments and fine-tuning of images.
Desktop-Focused:
The application is designed to be used on a computer, with the original photos stored locally on the hard drive.
Non-Destructive Editing:
Edits are applied to the original photos in a non-destructive way, meaning the original files remain untouched.
Key Differences from Lightroom (Cloud-Based):
Storage Location:
Lightroom Classic stores photos locally on your computer, while Lightroom stores them in the cloud.
Workflow:
Lightroom Classic is designed for a desktop workflow, while Lightroom is designed for a cloud-based workflow.
Connectivity:
Lightroom Classic can be used offline, while Lightroom requires an internet connection to sync and access photos.
Organization:
Lightroom Classic offers more advanced organization features like Collections and Keywords.
Who is it for?
Professional Photographers:
PCMag notes that Lightroom Classic is a popular choice among professional photographers who need the flexibility and control of a desktop-based application.
Users with Large Collections:
Those with extensive photo collections may prefer Lightroom Classic's local storage and robust organization features.
Users who prefer a traditional workflow:
Users who prefer a more traditional desktop workflow, with their original photos stored on their computer, will find Lightroom Classic a good fit.
Download Wondershare Filmora Crack [2025] With Latesttahirabibi60507
Copy & Past Link 👉👉
http://drfiles.net/
Wondershare Filmora is a video editing software and app designed for both beginners and experienced users. It's known for its user-friendly interface, drag-and-drop functionality, and a wide range of tools and features for creating and editing videos. Filmora is available on Windows, macOS, iOS (iPhone/iPad), and Android platforms.
TestMigrationsInPy: A Dataset of Test Migrations from Unittest to Pytest (MSR...Andre Hora
Unittest and pytest are the most popular testing frameworks in Python. Overall, pytest provides some advantages, including simpler assertion, reuse of fixtures, and interoperability. Due to such benefits, multiple projects in the Python ecosystem have migrated from unittest to pytest. To facilitate the migration, pytest can also run unittest tests, thus, the migration can happen gradually over time. However, the migration can be timeconsuming and take a long time to conclude. In this context, projects would benefit from automated solutions to support the migration process. In this paper, we propose TestMigrationsInPy, a dataset of test migrations from unittest to pytest. TestMigrationsInPy contains 923 real-world migrations performed by developers. Future research proposing novel solutions to migrate frameworks in Python can rely on TestMigrationsInPy as a ground truth. Moreover, as TestMigrationsInPy includes information about the migration type (e.g., changes in assertions or fixtures), our dataset enables novel solutions to be verified effectively, for instance, from simpler assertion migrations to more complex fixture migrations. TestMigrationsInPy is publicly available at: https://github.com/altinoalvesjunior/TestMigrationsInPy.
🌍📱👉COPY LINK & PASTE ON GOOGLE http://drfiles.net/ 👈🌍
Adobe Illustrator is a powerful, professional-grade vector graphics software used for creating a wide range of designs, including logos, icons, illustrations, and more. Unlike raster graphics (like photos), which are made of pixels, vector graphics in Illustrator are defined by mathematical equations, allowing them to be scaled up or down infinitely without losing quality.
Here's a more detailed explanation:
Key Features and Capabilities:
Vector-Based Design:
Illustrator's foundation is its use of vector graphics, meaning designs are created using paths, lines, shapes, and curves defined mathematically.
Scalability:
This vector-based approach allows for designs to be resized without any loss of resolution or quality, making it suitable for various print and digital applications.
Design Creation:
Illustrator is used for a wide variety of design purposes, including:
Logos and Brand Identity: Creating logos, icons, and other brand assets.
Illustrations: Designing detailed illustrations for books, magazines, web pages, and more.
Marketing Materials: Creating posters, flyers, banners, and other marketing visuals.
Web Design: Designing web graphics, including icons, buttons, and layouts.
Text Handling:
Illustrator offers sophisticated typography tools for manipulating and designing text within your graphics.
Brushes and Effects:
It provides a range of brushes and effects for adding artistic touches and visual styles to your designs.
Integration with Other Adobe Software:
Illustrator integrates seamlessly with other Adobe Creative Cloud apps like Photoshop, InDesign, and Dreamweaver, facilitating a smooth workflow.
Why Use Illustrator?
Professional-Grade Features:
Illustrator offers a comprehensive set of tools and features for professional design work.
Versatility:
It can be used for a wide range of design tasks and applications, making it a versatile tool for designers.
Industry Standard:
Illustrator is a widely used and recognized software in the graphic design industry.
Creative Freedom:
It empowers designers to create detailed, high-quality graphics with a high degree of control and precision.
AgentExchange is Salesforce’s latest innovation, expanding upon the foundation of AppExchange by offering a centralized marketplace for AI-powered digital labor. Designed for Agentblazers, developers, and Salesforce admins, this platform enables the rapid development and deployment of AI agents across industries.
Email: [email protected]
Phone: +1(630) 349 2411
Website: https://www.fexle.com/blogs/agentexchange-an-ultimate-guide-for-salesforce-consultants-businesses/?utm_source=slideshare&utm_medium=pptNg
Explaining GitHub Actions Failures with Large Language Models Challenges, In...ssuserb14185
GitHub Actions (GA) has become the de facto tool that developers use to automate software workflows, seamlessly building, testing, and deploying code. Yet when GA fails, it disrupts development, causing delays and driving up costs. Diagnosing failures becomes especially challenging because error logs are often long, complex and unstructured. Given these difficulties, this study explores the potential of large language models (LLMs) to generate correct, clear, concise, and actionable contextual descriptions (or summaries) for GA failures, focusing on developers’ perceptions of their feasibility and usefulness. Our results show that over 80% of developers rated LLM explanations positively in terms of correctness for simpler/small logs. Overall, our findings suggest that LLMs can feasibly assist developers in understanding common GA errors, thus, potentially reducing manual analysis. However, we also found that improved reasoning abilities are needed to support more complex CI/CD scenarios. For instance, less experienced developers tend to be more positive on the described context, while seasoned developers prefer concise summaries. Overall, our work offers key insights for researchers enhancing LLM reasoning, particularly in adapting explanations to user expertise.
https://arxiv.org/abs/2501.16495
Get & Download Wondershare Filmora Crack Latest [2025]saniaaftab72555
Copy & Past Link 👉👉
https://dr-up-community.info/
Wondershare Filmora is a video editing software and app designed for both beginners and experienced users. It's known for its user-friendly interface, drag-and-drop functionality, and a wide range of tools and features for creating and editing videos. Filmora is available on Windows, macOS, iOS (iPhone/iPad), and Android platforms.
Landscape of Requirements Engineering for/by AI through Literature ReviewHironori Washizaki
Hironori Washizaki, "Landscape of Requirements Engineering for/by AI through Literature Review," RAISE 2025: Workshop on Requirements engineering for AI-powered SoftwarE, 2025.
Secure Test Infrastructure: The Backbone of Trustworthy Software DevelopmentShubham Joshi
A secure test infrastructure ensures that the testing process doesn’t become a gateway for vulnerabilities. By protecting test environments, data, and access points, organizations can confidently develop and deploy software without compromising user privacy or system integrity.
This presentation explores code comprehension challenges in scientific programming based on a survey of 57 research scientists. It reveals that 57.9% of scientists have no formal training in writing readable code. Key findings highlight a "documentation paradox" where documentation is both the most common readability practice and the biggest challenge scientists face. The study identifies critical issues with naming conventions and code organization, noting that 100% of scientists agree readable code is essential for reproducible research. The research concludes with four key recommendations: expanding programming education for scientists, conducting targeted research on scientific code quality, developing specialized tools, and establishing clearer documentation guidelines for scientific software.
Presented at: The 33rd International Conference on Program Comprehension (ICPC '25)
Date of Conference: April 2025
Conference Location: Ottawa, Ontario, Canada
Preprint: https://arxiv.org/abs/2501.10037
Interactive Odoo Dashboard for various business needs can provide users with dynamic, visually appealing dashboards tailored to their specific requirements. such a module that could support multiple dashboards for different aspects of a business
✅Visit And Buy Now : https://bit.ly/3VojWza
✅This Interactive Odoo dashboard module allow user to create their own odoo interactive dashboards for various purpose.
App download now :
Odoo 18 : https://bit.ly/3VojWza
Odoo 17 : https://bit.ly/4h9Z47G
Odoo 16 : https://bit.ly/3FJTEA4
Odoo 15 : https://bit.ly/3W7tsEB
Odoo 14 : https://bit.ly/3BqZDHg
Odoo 13 : https://bit.ly/3uNMF2t
Try Our website appointment booking odoo app : https://bit.ly/3SvNvgU
👉Want a Demo ?📧 [email protected]
➡️Contact us for Odoo ERP Set up : 091066 49361
👉Explore more apps: https://bit.ly/3oFIOCF
👉Want to know more : 🌐 https://www.axistechnolabs.com/
#odoo #odoo18 #odoo17 #odoo16 #odoo15 #odooapps #dashboards #dashboardsoftware #odooerp #odooimplementation #odoodashboardapp #bestodoodashboard #dashboardapp #odoodashboard #dashboardmodule #interactivedashboard #bestdashboard #dashboard #odootag #odooservices #odoonewfeatures #newappfeatures #odoodashboardapp #dynamicdashboard #odooapp #odooappstore #TopOdooApps #odooapp #odooexperience #odoodevelopment #businessdashboard #allinonedashboard #odooproducts
F-Secure Freedome VPN 2025 Crack Plus Activation New Versionsaimabibi60507
Copy & Past Link 👉👉
https://dr-up-community.info/
F-Secure Freedome VPN is a virtual private network service developed by F-Secure, a Finnish cybersecurity company. It offers features such as Wi-Fi protection, IP address masking, browsing protection, and a kill switch to enhance online privacy and security .
WinRAR Crack for Windows (100% Working 2025)sh607827
copy and past on google ➤ ➤➤ https://hdlicense.org/ddl/
WinRAR Crack Free Download is a powerful archive manager that provides full support for RAR and ZIP archives and decompresses CAB, ARJ, LZH, TAR, GZ, ACE, UUE, .
⭕️➡️ FOR DOWNLOAD LINK : http://drfiles.net/ ⬅️⭕️
Maxon Cinema 4D 2025 is the latest version of the Maxon's 3D software, released in September 2024, and it builds upon previous versions with new tools for procedural modeling and animation, as well as enhancements to particle, Pyro, and rigid body simulations. CG Channel also mentions that Cinema 4D 2025.2, released in April 2025, focuses on spline tools and unified simulation enhancements.
Key improvements and features of Cinema 4D 2025 include:
Procedural Modeling: New tools and workflows for creating models procedurally, including fabric weave and constellation generators.
Procedural Animation: Field Driver tag for procedural animation.
Simulation Enhancements: Improved particle, Pyro, and rigid body simulations.
Spline Tools: Enhanced spline tools for motion graphics and animation, including spline modifiers from Rocket Lasso now included for all subscribers.
Unified Simulation & Particles: Refined physics-based effects and improved particle systems.
Boolean System: Modernized boolean system for precise 3D modeling.
Particle Node Modifier: New particle node modifier for creating particle scenes.
Learning Panel: Intuitive learning panel for new users.
Redshift Integration: Maxon now includes access to the full power of Redshift rendering for all new subscriptions.
In essence, Cinema 4D 2025 is a major update that provides artists with more powerful tools and workflows for creating 3D content, particularly in the fields of motion graphics, VFX, and visualization.
3. 2
1. Project Budget Management
A project budget is the total sum of money allocated for the particular purpose of the
project for a specific period of time. The goal of budget management is to control
project costs within the approved budget and deliver the expected project goals.
Our definition of a successful project is one that meets four success criteria: that the
project’s scope is delivered on schedule, it is delivered within budget and, once
delivered, it meets the quality expectations of the sponsor and stakeholders.
The focus of this chapter is on managing and controlling the project budget
throughout the entire project life cycle while relating budget control to the other
success criteria.
Budget management consists of a series of tasks and steps designed to help manage
the costs of the project, the steps are:
Defining the Budget
Executing the Budget
Controlling the Budget
Updating the Budget
Inputs: Inputs for the project budget management include the following
documents or sources of information:
WBS
Project contract or initial budget
Resource requirements
Resource cost estimates
Activity duration estimates
Historical information
Market conditions
Sponsor and organization policies
Outputs: The project team will use the above information to develop three
important documents for the project:
Cost estimates by activity
the Project Budget
the Budget Variance Report
4. 3
Inputs Process Outputs
WBS
Resource
requirements
Cost estimates
Schedule
Historical information
Market condition
Policies
Plan - Define and estimate
the resource requirements
and develop budget
Do – Obtain approval, and
publish budget, authorize
expenses
Check –Budget control and
performance analysis
Adapt – Update budget, set
corrective
actions
Project Budget
Baseline
Budget variance
report
Budget updates
Budgeting serves as a control mechanism where actual costs can be compared with
and measured against the budget. The budget is often a fairly set parameter in the
execution of the project. When a schedule begins to slip, cost is proportionally
affected. When project costs begin to escalate, the project manager should revisit
the Project Plan to determine whether scope, budget, or schedule needs adjusting.
To develop the budget, the applicable cost factors associated with project tasks are
identified. The development of costs for each task should be simple and direct and
consist of personal resource, material, and other direct costs. Cost of performing a
task is directly related to the personnel assigned to the task, the duration of the task,
and the cost of any non-personal items required by the task.
2. Defining the Budget
The project manager is responsible to estimate the budget required to complete
project activities. The Project Manager should allocate all costs to project activities,
and all aspects of the project, including the cost of internal and external human
resources, equipment, travel, materials and supplies, should be incorporated. The
budget should be much more detailed and more accurate than it was on the project
proposal
The Project Manager can use manual or automated tools to generate the budget
estimate. The budgeting tools may be simple spreadsheets or complex budget
estimating tool. For historical purposes, and to enable the budget to be refined, the
Project Manager should always maintain notes on how this budget was derived. Cost
5. 4
estimating checklists help to ensure that all preliminary budgeting information is
known and all bases are covered. The Project Manager must also include in the
budget the cost of both the human resources and the equipment and materials
required to perform the work. The method by which staff and products will be
acquired for the project will directly affect the budgeting process.
As the budget estimate is being developed, additional tasks may be identified
because the work is being further defined. It may be necessary to update the WBS
and the project schedule to include the activities identified during budget estimating,
such as equipment, materials, and other non-human resources.
2.1 Resource Requirements
Resource requirements involve determining what resources (people, equipment,
services, and material) and the quantities of those resources are required to
complete the project.
The projects’ WBS, scope statement, historical information, resource information,
and policies are inputs used to determine the resources for the project. The main
output is a list of resources requirements that provides the basis for budget
estimating and budget controls, and provide valuable information to the project
resource management process.
Human resources/Project Staffing
The project will develop a list of the human resource requirements detailing the
expertise level, areas of experience in designing, programming, testing. This
information will be used in the Resource management process to develop the project
team for Researchcolab.com project.
Equipment and Material resources
Equipment includes all the specialized tools needed by the project, from logistic
support to Laptop, desktop, premises and utility.
2.2 Budget Estimate
Once all project requirements have been documented, the next step is to determine
the costs of each requirement which will result in the creation of the project budget.
6. 5
A cost estimate, which is the process to approximate the costs that the project will
spend to get or use the project resources.
Work hour breakdown
As with developing a project schedule, documenting assumptions made while
developing the project budget is critical to the success of the project. Without clear
documentation of these assumptions, tracking the budget is not only difficult but
risky
2.3 Budget Development
The project budget is used to communicate what amounts will spent on categories of
resources within a given time period.
Total persons working 7
Work hour per person per day 1
Total working days 60
Total work hours per person 60
Work hours in total 420
Type Sector Breakdown Frequency Amount (BDT)
Opex
Project staffing
Total work hours 420
Daily 63,000/= BDT
Cost per person per
hour
150/= BDT
Logistic
Transport 1,000/= BDT
Ongoing 11,500/= BDT
Report Printing 1,500/= BDT
Web hosting 9,000/= BDT
Utility
Internet bills (7
person, 2 months)
7,000/= BDT
Ongoing 7,000/=
Miscellaneous Ongoing 2,000/=
Capex
Laptop Laptop computers 7 Pcs One time 2,80,000/=
Desktop Desktop computers 3 Pcs One time 1,20,000/=
7. 6
2.4 Budget Approval
The final steps in estimating the budget is to get approval. The completed project
budget should be reviewed by the project team and be reviewed by the project
sponsor. Once the project budget has been completed the next steps is to get
approval for the project budget, this occurs at three times during the project
lifecycle- during project negotiations with the sponsor which lead to the contact
budget, during the planning phase of the project when the project budget is
developed in more detail, following the project’s chart of accounts, and becomes the
baseline budget.
Approval of the project budget can result in negotiations between the project team
and the sponsor, depending on the size of the budget these negotiations can take
some time before the budget is approved and a contract is signed.
3. Executing the Budget
In this section we will describe the budget in project execution.
3.1 Budget Baseline
Once the project budget has been reviewed and approved the next step is to create a
budget baseline, the baseline is a time-phased budget that project managers use to
measure and monitor budget performance. The budget baseline will be used to
control the budget using the Earned Value calculations to determine how the project
is performing according to the progress made
3.2 Publish Budget
The approved budget needs to be communicated to all people that will use it to
monitor, control and make decisions based on the information of the budget. The list
of people comes from the team/stakeholder communication mentioned in the
project communication management plan.
Premises Ongoing 2,40,000/=
Total anticipated costs 7,23,500 /=
8. 7
3.3 Budget Execution
Executing the budget is the action of authorizing the expenses approved on the
project budget, the project manager then initiates to carry the activities that lead to
form project team, purchase of equipment, materials and services, all according to a
project procurement plan developed during the project planning. This step occurs
after the budget has been approved and the project authorized to start its activities
according to the project plan.
4. Budget Control
Monitoring and controlling the project budget ensures that only the appropriate
project changes are included in the budget baseline, that information about
authorized changes are communicated and corrective actions are taken by project
manager. The action of budget control is also a process of managing the budget.
Budget management is the process by which costs or expenses incurred on the
project are formally identified, approved and paid. Purchase order forms are
completed for each set of related project expenses such as staffing, equipment and
materials costs. Depending on the authorization level the purchase order forms are
approved and recorded by the project manager for tracking, sponsor reporting and
auditing purposes.
4.1 Budget Reporting
The typical report contains a list of all budget accounts (COA) and columns that list
the budget baseline, the cumulative expenses to date, the balance to date and the
burn ration or how the budget is spend according to the yearly budget plan. Below is
an example of a budget report:
Expense Reports, reports provide the expenses to date by account, project
name and
funding code.
Variance Reports, show the difference between what has been expensed and
the
approved budget, the balance for each account.
9. 8
Burn Ratio Reports, shows the rate at which the project is using the budget
according
to the original plan, a quick method to see if the project budget is on track.
4.2 Earned Value Management
Performance of the project will be measured using Earned Value Management. The
following four Earned Value metrics is used to measure to projects cost performance:
Schedule Variance (SV)
Cost Variance (CV)
Schedule Performance Index (SPI)
Cost Performance Index (CPI)
If the Schedule Performance Index or Cost Performance Index has a variance of
between 0.1 and 0.2 the Project Manager must report the reason for the exception.
If the SPI or CPI has a variance of greater than 0.2 the Project Manager must report
the reason for the exception and provide management a detailed corrective plan to
bring the projects performance back to acceptable levels.
Performance Measure Yellow Red
Schedule Performance Index (SPI) Between 0.9 and 0.8
or Between 1.1 and
1.2
Less Than 0.8 or
Greater than 1.2
Cost Performance Index (CPI) Between 0.9 and 0.8
or Between 1.1 and
1.2
Less Than 0.8 or
Greater than 1.2
4.3 Budget Analysis
Identify the causes for the deviations from plan. Major deviations from the budget
baseline need to be analysed to determine what caused the difference so that steps
can be taken to prevent the situation from happening again in the future, or with
similar projects.
10. 9
Forecasting
Earned Value enables the project manager to forecast the probable final cost and
schedule results on the project. With Earned Value, the project does not have to wait
until it is almost complete to know that it has a cost problem. Earned Value gives a
project manager an “early warning” signal in time to take corrective action, in time to
influence the final results by taking corrective actions.
The Control Thresholds for this project is a CPI or SPI of less than 0.8 or greater than
1.2. If the project reaches one of these Control Thresholds a Cost Variance
Corrective Action Plan is required. The Project Manager will present the Project
Sponsor with options for corrective actions within five business days from when the
cost variance is first reported. Within three business days from when the Project
Sponsor selects a corrective action option, the Project Manager will present the
Project Sponsor with a formal Cost Variance Corrective Action Plan. The Cost
Variance Corrective Action Plan will detail the actions necessary to bring the project
back within budget and the means by which the effectiveness of the actions in the
plan will be measured.
5. Budget Update
Budget update for ResearchColab project is described bellow.
5.1 Budget Changes
Updates to the budget come from approved changes to the budget. For most
projects changes to the budget need to be approved by the sponsor, in some
instances the sponsor can give the project a small percentage that the project can
use to cover small budget modifications
It is important that the project manager understands the sponsor contract clauses
and monitors, with special attention the accounts or budget items that have
restrictions. Not doing so may result in losses to the project.
11. 10
5.2 Corrective Actions
If the project is under or over budget of the defined limit then the project manager
needs to take corrective actions to bring the budget back on track, these actions may
include trade-offs that will need to be discussed with sponsor, trade-off include
reducing the scope or lowering the quality. Corrective actions may include the use of
alternative options to produce the similar output using different inputs, the project
manager will implement the corrective actions and monitor their performance to see
if they are effective in reducing the project expenses and help bring the project back
on track. Corrective actions need to be consulted with the project team so that
changes are implemented.
5.3 Communicate Changes
Changes to the budget need to be communicated and incorporated on the system
that track change control. Communicating the changes of the budget to the team
member that will use the information helps reduce the chances that work will be
done on activities that have been either cancelled or postponed.