SlideShare a Scribd company logo
©The McGraw-Hill Companies,
1
An Introduction
Chapter
1
Software Project
Management
4th
Edition
Robert Hughes and
Mike Cotterell
©The McGraw-Hill Companies,
2
Outline of talk
In this introduction the main questions to be
addressed will be:
– What is software project management? Is it
really different from ‘ordinary’ project
management?
– How do you know when a project has been
successful? For example, do the expectations
of the customer/client match those of the
developers?
©The McGraw-Hill Companies,
3
What is a project?
Some dictionary definitions:
“A specific plan or design”
“A planned undertaking”
“A large undertaking e.g. a public works
scheme”
Longmans dictionary
Key points above are planning and size
of task
©The McGraw-Hill Companies,
4
Jobs versus projects
‘Jobs’ – repetition of very well-defined and well
understood tasks with very little uncertainty
‘Exploration’ – e.g. finding a cure for cancer:
the outcome is very uncertain
‘Projects’ – in the middle!
©The McGraw-Hill Companies,
5
Characteristics of
projects
A task is more ‘project-like’ if it is:
• Non-routine
• Planned
• Aiming at a specific target
• Work carried out for a customer
• Involving several specialisms
• Made up of several different phases
• Constrained by time and resources
• Large and/or complex
©The McGraw-Hill Companies,
6
Are software projects really
different from other projects?
Not really! …but…
• Invisibility
• Complexity
• Conformity
• Flexibility
make software more problematic to
build than other engineered artefacts.
©The McGraw-Hill Companies,
7
Activities covered by project
management
Feasibility study
Is project technically feasible and worthwhile from a
business point of view?
Planning
Only done if project is feasible
Execution
Implement plan, but plan may be changed as we go along
©The McGraw-Hill Companies,
8
The software development life-
cycle (ISO 12207)
©The McGraw-Hill Companies,
9
ISO 12207 life-cycle
Requirements analysis
– Requirements elicitation: what does the
client need?
– Analysis: converting ‘customer-facing’
requirements into equivalents that
developers can understand
– Requirements will cover
• Functions
• Quality
• Resource constraints i.e. costs
©The McGraw-Hill Companies,
10
ISO 12207 life-cycle
• Architecture design
– Based on system requirements
– Defines components of system: hardware,
software, organizational
– Software requirements will come out of this
• Code and test
– Of individual components
• Integration
– Putting the components together
©The McGraw-Hill Companies,
11
ISO12207 continued
• Qualification testing
– Testing the system (not just the software)
• Installation
– The process of making the system
operational
– Includes setting up standing data, setting
system parameters, installing on
operational hardware platforms, user
training etc
• Acceptance support
– Including maintenance and enhancement
©The McGraw-Hill Companies,
12
Some ways of categorizing
projects
Distinguishing different types of project is
important as different types of task
need different project approaches e.g.
• Information systems versus embedded
systems
• Objective-based versus product-based
©The McGraw-Hill Companies,
13
What is management?
This involves the following activities:
• Planning – deciding what is to be done
• Organizing – making arrangements
• Staffing – selecting the right people for
the job
• Directing – giving instructions
continued…
©The McGraw-Hill Companies,
14
What is management?
(continued)
• Monitoring – checking on progress
• Controlling – taking action to remedy hold-ups
• Innovating – coming up with solutions when
problems emerge
• Representing – liaising with clients, users,
developers and other stakeholders
©The McGraw-Hill Companies,
15
Setting objectives
• Answering the question ‘What do we
have to do to have a success?’
• Need for a project authority
– Sets the project scope
– Allocates/approves costs
• Could be one person - or a group
– Project Board
– Project Management Board
– Steering committee
©The McGraw-Hill Companies,
16
Objectives
Informally, the objective of a project can be
defined by completing the statement:
The project will be regarded as a
success if………………………………..
Rather like post-conditions for the project
Focus on what will be put in place, rather than
how activities will be carried out
©The McGraw-Hill Companies,
17
Objectives should be SMART
S – specific, that is, concrete and well-defined
M – measurable, that is, satisfaction of the
objective can be objectively judged
A – achievable, that is, it is within the power of the
individual or group concerned to meet the target
R – relevant, the objective must relevant to the true
purpose of the project
T – time constrained: there is defined point in
time by which the objective should be achieved
©The McGraw-Hill Companies,
18
Goals/sub-objectives
These are steps along the way to achieving
the objective. Informally, these can be
defined by completing the sentence…
Objective X will be achieved
IF the following goals are all achieved
A……………
B……………
C…………… etc
©The McGraw-Hill Companies,
19
Goals/sub-objectives continued
Often a goal can be allocated to an individual.
Individual may have the capability of achieving
goal, but not the objective on their own e.g.
Objective – user satisfaction with software product
Analyst goal – accurate requirements
Developer goal – software that is reliable
©The McGraw-Hill Companies,
20
Measures of effectiveness
How do we know that the goal or objective has
been achieved?
By a practical test, that can be objectively
assessed.
e.g. for user satisfaction with software product:
• Repeat business – they buy further products from
us
• Number of complaints – if low etc etc
©The McGraw-Hill Companies,
21
Stakeholders
These are people who have a stake or
interest in the project
In general, they could be users/clients or
developers/implementers
They could be:
• Within the project team
• Outside the project team, but within the same
organization
• Outside both the project team and the
organization
©The McGraw-Hill Companies,
22
The business case
Benefits of delivered
project must outweigh
costs
Costs include:
- Development
- Operation
Benefits
- Quantifiable
- Non-quantifiable
£
£
Benefits
Costs
©The McGraw-Hill Companies,
23
Management control
©The McGraw-Hill Companies,
24
Management control
Data – the raw details
e.g. ‘6,000 documents processed at location X’
Information – the data is processed to produce
something that is meaningful and useful
e.g. ‘productivity is 100 documents a day’
Comparison with objectives/goals
e.g. we will not meet target of processing all
documents by 31st
March
continued…..
©The McGraw-Hill Companies,
25
Management control -
continued
Modelling – working out the probable
outcomes of various decisions
e.g. if we employ two more staff at location X
how quickly can we get the documents
processed?
Implementation – carrying out the remedial
actions that have been decided upon
©The McGraw-Hill Companies,
26
Key points in lecture
• Projects are non-routine - thus uncertain
• The particular problems of projects e.g. lack of
visibility
• Clear objectives are essential which can be
objectively assessed
• Stuff happens. Not usually possible to keep
precisely plan – need for control
• Communicate, communicate, communicate!
Ad

More Related Content

What's hot (20)

MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
Kathirvel Ayyaswamy
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
Kathirvel Ayyaswamy
 
SPM PPT
SPM PPTSPM PPT
SPM PPT
Suresh Kumar
 
Software effort estimation
Software effort estimationSoftware effort estimation
Software effort estimation
tumetr1
 
Spm software effort estimation
Spm software effort estimationSpm software effort estimation
Spm software effort estimation
Kanchana Devi
 
Spm unit 1
Spm unit 1Spm unit 1
Spm unit 1
sweetyammu
 
Lecture 2
Lecture 2Lecture 2
Lecture 2
9anm12
 
Visualizing Progress.pptx
Visualizing Progress.pptxVisualizing Progress.pptx
Visualizing Progress.pptx
ShanmugapriyaSenthil3
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Lovely Professional University
 
Object Oriented Analysis Design using UML
Object Oriented Analysis Design using UMLObject Oriented Analysis Design using UML
Object Oriented Analysis Design using UML
Ajit Nayak
 
Spm unit 3
Spm unit 3Spm unit 3
Spm unit 3
sweetyammu
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
Kathirvel Ayyaswamy
 
Managing contracts
Managing contractsManaging contracts
Managing contracts
tumetr1
 
Pressman ch-21-project-management-concepts
Pressman ch-21-project-management-conceptsPressman ch-21-project-management-concepts
Pressman ch-21-project-management-concepts
seethaveera
 
Spm ap-network model-
Spm ap-network model-Spm ap-network model-
Spm ap-network model-
Kanchana Devi
 
SPM Activity Planning Introduction
SPM Activity Planning IntroductionSPM Activity Planning Introduction
SPM Activity Planning Introduction
Kanchana Devi
 
Spm unit 4
Spm unit 4Spm unit 4
Spm unit 4
sweetyammu
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
Saqib Raza
 
Introduction to Software Project Management
Introduction to Software Project ManagementIntroduction to Software Project Management
Introduction to Software Project Management
Reetesh Gupta
 
Spm project planning
Spm project planning Spm project planning
Spm project planning
Kanchana Devi
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
Kathirvel Ayyaswamy
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
Kathirvel Ayyaswamy
 
Software effort estimation
Software effort estimationSoftware effort estimation
Software effort estimation
tumetr1
 
Spm software effort estimation
Spm software effort estimationSpm software effort estimation
Spm software effort estimation
Kanchana Devi
 
Lecture 2
Lecture 2Lecture 2
Lecture 2
9anm12
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Lovely Professional University
 
Object Oriented Analysis Design using UML
Object Oriented Analysis Design using UMLObject Oriented Analysis Design using UML
Object Oriented Analysis Design using UML
Ajit Nayak
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
Kathirvel Ayyaswamy
 
Managing contracts
Managing contractsManaging contracts
Managing contracts
tumetr1
 
Pressman ch-21-project-management-concepts
Pressman ch-21-project-management-conceptsPressman ch-21-project-management-concepts
Pressman ch-21-project-management-concepts
seethaveera
 
Spm ap-network model-
Spm ap-network model-Spm ap-network model-
Spm ap-network model-
Kanchana Devi
 
SPM Activity Planning Introduction
SPM Activity Planning IntroductionSPM Activity Planning Introduction
SPM Activity Planning Introduction
Kanchana Devi
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
Saqib Raza
 
Introduction to Software Project Management
Introduction to Software Project ManagementIntroduction to Software Project Management
Introduction to Software Project Management
Reetesh Gupta
 
Spm project planning
Spm project planning Spm project planning
Spm project planning
Kanchana Devi
 

Viewers also liked (14)

Programme management and project evaluation
Programme management and project evaluationProgramme management and project evaluation
Programme management and project evaluation
tumetr1
 
An introduction
An introductionAn introduction
An introduction
tumetr
 
file transfer and access utilities
file transfer and access utilitiesfile transfer and access utilities
file transfer and access utilities
tumetr1
 
retrieving the mail
retrieving the mailretrieving the mail
retrieving the mail
tumetr1
 
ตัวอย่างบทคัดย่อเล่มโปรเจ็ค
ตัวอย่างบทคัดย่อเล่มโปรเจ็คตัวอย่างบทคัดย่อเล่มโปรเจ็ค
ตัวอย่างบทคัดย่อเล่มโปรเจ็ค
tumetr1
 
connectivity utility
connectivity utilityconnectivity utility
connectivity utility
tumetr1
 
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
Mubashir Ali
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project Management
LAVANYA PALANIYAPPAN
 
Software Project Management Spm1176
Software Project Management Spm1176Software Project Management Spm1176
Software Project Management Spm1176
Ahmad Hammoud,CPM,IBA,MSE,NLP
 
SDPM - Lecture 2 -The STEP WISE Approach to Project Planning
SDPM - Lecture 2 -The STEP WISE Approach to Project PlanningSDPM - Lecture 2 -The STEP WISE Approach to Project Planning
SDPM - Lecture 2 -The STEP WISE Approach to Project Planning
OpenLearningLab
 
Stepwise planning
Stepwise planningStepwise planning
Stepwise planning
KavithaGowri
 
Project Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th EditionProject Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th Edition
pankajsh10
 
Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5
pankajsh10
 
Project management
Project managementProject management
Project management
Satish Yadavalli
 
Programme management and project evaluation
Programme management and project evaluationProgramme management and project evaluation
Programme management and project evaluation
tumetr1
 
An introduction
An introductionAn introduction
An introduction
tumetr
 
file transfer and access utilities
file transfer and access utilitiesfile transfer and access utilities
file transfer and access utilities
tumetr1
 
retrieving the mail
retrieving the mailretrieving the mail
retrieving the mail
tumetr1
 
ตัวอย่างบทคัดย่อเล่มโปรเจ็ค
ตัวอย่างบทคัดย่อเล่มโปรเจ็คตัวอย่างบทคัดย่อเล่มโปรเจ็ค
ตัวอย่างบทคัดย่อเล่มโปรเจ็ค
tumetr1
 
connectivity utility
connectivity utilityconnectivity utility
connectivity utility
tumetr1
 
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
Mubashir Ali
 
SDPM - Lecture 2 -The STEP WISE Approach to Project Planning
SDPM - Lecture 2 -The STEP WISE Approach to Project PlanningSDPM - Lecture 2 -The STEP WISE Approach to Project Planning
SDPM - Lecture 2 -The STEP WISE Approach to Project Planning
OpenLearningLab
 
Project Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th EditionProject Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th Edition
pankajsh10
 
Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5
pankajsh10
 
Ad

Similar to Software Project Management chapter-1 (20)

Spm chapter 1
Spm chapter 1Spm chapter 1
Spm chapter 1
Suresh Kumar
 
SPM_Project definition steps and description
SPM_Project definition steps and descriptionSPM_Project definition steps and description
SPM_Project definition steps and description
aruldanica2508
 
Software Engin_Chapter_1- 2016 4 (1).ppt
Software Engin_Chapter_1- 2016 4 (1).pptSoftware Engin_Chapter_1- 2016 4 (1).ppt
Software Engin_Chapter_1- 2016 4 (1).ppt
arpita259075
 
Software Project Management_Chapter_1.ppt
Software Project Management_Chapter_1.pptSoftware Project Management_Chapter_1.ppt
Software Project Management_Chapter_1.ppt
brmadhu
 
Ch01_Introduction_to_SPM.pdf
Ch01_Introduction_to_SPM.pdfCh01_Introduction_to_SPM.pdf
Ch01_Introduction_to_SPM.pdf
WrushabhShirsat3
 
1588439426-1-introduction-to-project-management.pptx
1588439426-1-introduction-to-project-management.pptx1588439426-1-introduction-to-project-management.pptx
1588439426-1-introduction-to-project-management.pptx
JavedAjmal1
 
Ch01_Introduction_to_SPM.ppt
Ch01_Introduction_to_SPM.pptCh01_Introduction_to_SPM.ppt
Ch01_Introduction_to_SPM.ppt
62AniketVishwakarma
 
Copy og thd se gtfor engineering using so so so
Copy og thd se gtfor engineering using so so soCopy og thd se gtfor engineering using so so so
Copy og thd se gtfor engineering using so so so
CSEISE
 
Mg6088 spm unit-1
Mg6088 spm unit-1Mg6088 spm unit-1
Mg6088 spm unit-1
SIMONTHOMAS S
 
An approach-to-planning-software-projects
An approach-to-planning-software-projectsAn approach-to-planning-software-projects
An approach-to-planning-software-projects
tumetr
 
What is IT Project Management
What is IT Project Management What is IT Project Management
What is IT Project Management
NamraRasheed4
 
Chapter 01 - Introduction to Software Project Management
Chapter 01 - Introduction to Software Project ManagementChapter 01 - Introduction to Software Project Management
Chapter 01 - Introduction to Software Project Management
RohanMistry15
 
Spm
Spm Spm
Spm
Suresh Kumar
 
Week 1 Introduction Software Project Versus Other Type of Projects.pptx
Week 1 Introduction Software Project Versus Other Type of Projects.pptxWeek 1 Introduction Software Project Versus Other Type of Projects.pptx
Week 1 Introduction Software Project Versus Other Type of Projects.pptx
PhidaHossain
 
Project management lecture 1
Project management lecture 1Project management lecture 1
Project management lecture 1
Abeera Malik
 
software project managment 4th ed: chapter 2
software project managment 4th ed: chapter 2software project managment 4th ed: chapter 2
software project managment 4th ed: chapter 2
HafidlotulFatimahAhm
 
Software Project Management(Unit-1). ppt
Software Project Management(Unit-1). pptSoftware Project Management(Unit-1). ppt
Software Project Management(Unit-1). ppt
ghatak2042
 
Session 2 mod 2 proj mgt
Session 2 mod 2 proj mgtSession 2 mod 2 proj mgt
Session 2 mod 2 proj mgt
Himani Maheshwari
 
step of planning of software project manager
step of planning of software project managerstep of planning of software project manager
step of planning of software project manager
Meenakshi Raheja
 
classle_37133_05c1c0be651c4c162c3207a89ccd7723_b849f1b258faeed2_f.ppt
classle_37133_05c1c0be651c4c162c3207a89ccd7723_b849f1b258faeed2_f.pptclassle_37133_05c1c0be651c4c162c3207a89ccd7723_b849f1b258faeed2_f.ppt
classle_37133_05c1c0be651c4c162c3207a89ccd7723_b849f1b258faeed2_f.ppt
Meenakshi Raheja
 
SPM_Project definition steps and description
SPM_Project definition steps and descriptionSPM_Project definition steps and description
SPM_Project definition steps and description
aruldanica2508
 
Software Engin_Chapter_1- 2016 4 (1).ppt
Software Engin_Chapter_1- 2016 4 (1).pptSoftware Engin_Chapter_1- 2016 4 (1).ppt
Software Engin_Chapter_1- 2016 4 (1).ppt
arpita259075
 
Software Project Management_Chapter_1.ppt
Software Project Management_Chapter_1.pptSoftware Project Management_Chapter_1.ppt
Software Project Management_Chapter_1.ppt
brmadhu
 
Ch01_Introduction_to_SPM.pdf
Ch01_Introduction_to_SPM.pdfCh01_Introduction_to_SPM.pdf
Ch01_Introduction_to_SPM.pdf
WrushabhShirsat3
 
1588439426-1-introduction-to-project-management.pptx
1588439426-1-introduction-to-project-management.pptx1588439426-1-introduction-to-project-management.pptx
1588439426-1-introduction-to-project-management.pptx
JavedAjmal1
 
Copy og thd se gtfor engineering using so so so
Copy og thd se gtfor engineering using so so soCopy og thd se gtfor engineering using so so so
Copy og thd se gtfor engineering using so so so
CSEISE
 
An approach-to-planning-software-projects
An approach-to-planning-software-projectsAn approach-to-planning-software-projects
An approach-to-planning-software-projects
tumetr
 
What is IT Project Management
What is IT Project Management What is IT Project Management
What is IT Project Management
NamraRasheed4
 
Chapter 01 - Introduction to Software Project Management
Chapter 01 - Introduction to Software Project ManagementChapter 01 - Introduction to Software Project Management
Chapter 01 - Introduction to Software Project Management
RohanMistry15
 
Week 1 Introduction Software Project Versus Other Type of Projects.pptx
Week 1 Introduction Software Project Versus Other Type of Projects.pptxWeek 1 Introduction Software Project Versus Other Type of Projects.pptx
Week 1 Introduction Software Project Versus Other Type of Projects.pptx
PhidaHossain
 
Project management lecture 1
Project management lecture 1Project management lecture 1
Project management lecture 1
Abeera Malik
 
software project managment 4th ed: chapter 2
software project managment 4th ed: chapter 2software project managment 4th ed: chapter 2
software project managment 4th ed: chapter 2
HafidlotulFatimahAhm
 
Software Project Management(Unit-1). ppt
Software Project Management(Unit-1). pptSoftware Project Management(Unit-1). ppt
Software Project Management(Unit-1). ppt
ghatak2042
 
step of planning of software project manager
step of planning of software project managerstep of planning of software project manager
step of planning of software project manager
Meenakshi Raheja
 
classle_37133_05c1c0be651c4c162c3207a89ccd7723_b849f1b258faeed2_f.ppt
classle_37133_05c1c0be651c4c162c3207a89ccd7723_b849f1b258faeed2_f.pptclassle_37133_05c1c0be651c4c162c3207a89ccd7723_b849f1b258faeed2_f.ppt
classle_37133_05c1c0be651c4c162c3207a89ccd7723_b849f1b258faeed2_f.ppt
Meenakshi Raheja
 
Ad

More from Computing Cage (13)

Overview of tcp ip
Overview of tcp ipOverview of tcp ip
Overview of tcp ip
Computing Cage
 
Introduction to Object Oriented Design
Introduction to Object Oriented DesignIntroduction to Object Oriented Design
Introduction to Object Oriented Design
Computing Cage
 
Introduction to Network Security
Introduction to Network SecurityIntroduction to Network Security
Introduction to Network Security
Computing Cage
 
Software Testing & Debugging
Software Testing & DebuggingSoftware Testing & Debugging
Software Testing & Debugging
Computing Cage
 
Sample slides 2
Sample slides 2Sample slides 2
Sample slides 2
Computing Cage
 
Sample slides 1
Sample slides 1Sample slides 1
Sample slides 1
Computing Cage
 
System Integration & Build Management
System Integration & Build ManagementSystem Integration & Build Management
System Integration & Build Management
Computing Cage
 
Software Architecture
Software ArchitectureSoftware Architecture
Software Architecture
Computing Cage
 
Search Engine Optimization
Search Engine OptimizationSearch Engine Optimization
Search Engine Optimization
Computing Cage
 
A Star Search
A Star SearchA Star Search
A Star Search
Computing Cage
 
Assessing Technology Landscape
Assessing Technology LandscapeAssessing Technology Landscape
Assessing Technology Landscape
Computing Cage
 
System Level Requirements Gathering
System Level Requirements GatheringSystem Level Requirements Gathering
System Level Requirements Gathering
Computing Cage
 
Enterprise Application Integration
Enterprise Application IntegrationEnterprise Application Integration
Enterprise Application Integration
Computing Cage
 
Introduction to Object Oriented Design
Introduction to Object Oriented DesignIntroduction to Object Oriented Design
Introduction to Object Oriented Design
Computing Cage
 
Introduction to Network Security
Introduction to Network SecurityIntroduction to Network Security
Introduction to Network Security
Computing Cage
 
Software Testing & Debugging
Software Testing & DebuggingSoftware Testing & Debugging
Software Testing & Debugging
Computing Cage
 
System Integration & Build Management
System Integration & Build ManagementSystem Integration & Build Management
System Integration & Build Management
Computing Cage
 
Search Engine Optimization
Search Engine OptimizationSearch Engine Optimization
Search Engine Optimization
Computing Cage
 
Assessing Technology Landscape
Assessing Technology LandscapeAssessing Technology Landscape
Assessing Technology Landscape
Computing Cage
 
System Level Requirements Gathering
System Level Requirements GatheringSystem Level Requirements Gathering
System Level Requirements Gathering
Computing Cage
 
Enterprise Application Integration
Enterprise Application IntegrationEnterprise Application Integration
Enterprise Application Integration
Computing Cage
 

Recently uploaded (20)

Presentation on Tourism Product Development By Md Shaifullar Rabbi
Presentation on Tourism Product Development By Md Shaifullar RabbiPresentation on Tourism Product Development By Md Shaifullar Rabbi
Presentation on Tourism Product Development By Md Shaifullar Rabbi
Md Shaifullar Rabbi
 
Exploring-Substances-Acidic-Basic-and-Neutral.pdf
Exploring-Substances-Acidic-Basic-and-Neutral.pdfExploring-Substances-Acidic-Basic-and-Neutral.pdf
Exploring-Substances-Acidic-Basic-and-Neutral.pdf
Sandeep Swamy
 
Unit 6_Introduction_Phishing_Password Cracking.pdf
Unit 6_Introduction_Phishing_Password Cracking.pdfUnit 6_Introduction_Phishing_Password Cracking.pdf
Unit 6_Introduction_Phishing_Password Cracking.pdf
KanchanPatil34
 
How to track Cost and Revenue using Analytic Accounts in odoo Accounting, App...
How to track Cost and Revenue using Analytic Accounts in odoo Accounting, App...How to track Cost and Revenue using Analytic Accounts in odoo Accounting, App...
How to track Cost and Revenue using Analytic Accounts in odoo Accounting, App...
Celine George
 
Understanding P–N Junction Semiconductors: A Beginner’s Guide
Understanding P–N Junction Semiconductors: A Beginner’s GuideUnderstanding P–N Junction Semiconductors: A Beginner’s Guide
Understanding P–N Junction Semiconductors: A Beginner’s Guide
GS Virdi
 
To study Digestive system of insect.pptx
To study Digestive system of insect.pptxTo study Digestive system of insect.pptx
To study Digestive system of insect.pptx
Arshad Shaikh
 
Operations Management (Dr. Abdulfatah Salem).pdf
Operations Management (Dr. Abdulfatah Salem).pdfOperations Management (Dr. Abdulfatah Salem).pdf
Operations Management (Dr. Abdulfatah Salem).pdf
Arab Academy for Science, Technology and Maritime Transport
 
Presentation of the MIPLM subject matter expert Erdem Kaya
Presentation of the MIPLM subject matter expert Erdem KayaPresentation of the MIPLM subject matter expert Erdem Kaya
Presentation of the MIPLM subject matter expert Erdem Kaya
MIPLM
 
Political History of Pala dynasty Pala Rulers NEP.pptx
Political History of Pala dynasty Pala Rulers NEP.pptxPolitical History of Pala dynasty Pala Rulers NEP.pptx
Political History of Pala dynasty Pala Rulers NEP.pptx
Arya Mahila P. G. College, Banaras Hindu University, Varanasi, India.
 
P-glycoprotein pamphlet: iteration 4 of 4 final
P-glycoprotein pamphlet: iteration 4 of 4 finalP-glycoprotein pamphlet: iteration 4 of 4 final
P-glycoprotein pamphlet: iteration 4 of 4 final
bs22n2s
 
K12 Tableau Tuesday - Algebra Equity and Access in Atlanta Public Schools
K12 Tableau Tuesday  - Algebra Equity and Access in Atlanta Public SchoolsK12 Tableau Tuesday  - Algebra Equity and Access in Atlanta Public Schools
K12 Tableau Tuesday - Algebra Equity and Access in Atlanta Public Schools
dogden2
 
LDMMIA Reiki Master Spring 2025 Mini Updates
LDMMIA Reiki Master Spring 2025 Mini UpdatesLDMMIA Reiki Master Spring 2025 Mini Updates
LDMMIA Reiki Master Spring 2025 Mini Updates
LDM Mia eStudios
 
Handling Multiple Choice Responses: Fortune Effiong.pptx
Handling Multiple Choice Responses: Fortune Effiong.pptxHandling Multiple Choice Responses: Fortune Effiong.pptx
Handling Multiple Choice Responses: Fortune Effiong.pptx
AuthorAIDNationalRes
 
To study the nervous system of insect.pptx
To study the nervous system of insect.pptxTo study the nervous system of insect.pptx
To study the nervous system of insect.pptx
Arshad Shaikh
 
Michelle Rumley & Mairéad Mooney, Boole Library, University College Cork. Tra...
Michelle Rumley & Mairéad Mooney, Boole Library, University College Cork. Tra...Michelle Rumley & Mairéad Mooney, Boole Library, University College Cork. Tra...
Michelle Rumley & Mairéad Mooney, Boole Library, University College Cork. Tra...
Library Association of Ireland
 
GDGLSPGCOER - Git and GitHub Workshop.pptx
GDGLSPGCOER - Git and GitHub Workshop.pptxGDGLSPGCOER - Git and GitHub Workshop.pptx
GDGLSPGCOER - Git and GitHub Workshop.pptx
azeenhodekar
 
One Hot encoding a revolution in Machine learning
One Hot encoding a revolution in Machine learningOne Hot encoding a revolution in Machine learning
One Hot encoding a revolution in Machine learning
momer9505
 
The ever evoilving world of science /7th class science curiosity /samyans aca...
The ever evoilving world of science /7th class science curiosity /samyans aca...The ever evoilving world of science /7th class science curiosity /samyans aca...
The ever evoilving world of science /7th class science curiosity /samyans aca...
Sandeep Swamy
 
Social Problem-Unemployment .pptx notes for Physiotherapy Students
Social Problem-Unemployment .pptx notes for Physiotherapy StudentsSocial Problem-Unemployment .pptx notes for Physiotherapy Students
Social Problem-Unemployment .pptx notes for Physiotherapy Students
DrNidhiAgarwal
 
Quality Contril Analysis of Containers.pdf
Quality Contril Analysis of Containers.pdfQuality Contril Analysis of Containers.pdf
Quality Contril Analysis of Containers.pdf
Dr. Bindiya Chauhan
 
Presentation on Tourism Product Development By Md Shaifullar Rabbi
Presentation on Tourism Product Development By Md Shaifullar RabbiPresentation on Tourism Product Development By Md Shaifullar Rabbi
Presentation on Tourism Product Development By Md Shaifullar Rabbi
Md Shaifullar Rabbi
 
Exploring-Substances-Acidic-Basic-and-Neutral.pdf
Exploring-Substances-Acidic-Basic-and-Neutral.pdfExploring-Substances-Acidic-Basic-and-Neutral.pdf
Exploring-Substances-Acidic-Basic-and-Neutral.pdf
Sandeep Swamy
 
Unit 6_Introduction_Phishing_Password Cracking.pdf
Unit 6_Introduction_Phishing_Password Cracking.pdfUnit 6_Introduction_Phishing_Password Cracking.pdf
Unit 6_Introduction_Phishing_Password Cracking.pdf
KanchanPatil34
 
How to track Cost and Revenue using Analytic Accounts in odoo Accounting, App...
How to track Cost and Revenue using Analytic Accounts in odoo Accounting, App...How to track Cost and Revenue using Analytic Accounts in odoo Accounting, App...
How to track Cost and Revenue using Analytic Accounts in odoo Accounting, App...
Celine George
 
Understanding P–N Junction Semiconductors: A Beginner’s Guide
Understanding P–N Junction Semiconductors: A Beginner’s GuideUnderstanding P–N Junction Semiconductors: A Beginner’s Guide
Understanding P–N Junction Semiconductors: A Beginner’s Guide
GS Virdi
 
To study Digestive system of insect.pptx
To study Digestive system of insect.pptxTo study Digestive system of insect.pptx
To study Digestive system of insect.pptx
Arshad Shaikh
 
Presentation of the MIPLM subject matter expert Erdem Kaya
Presentation of the MIPLM subject matter expert Erdem KayaPresentation of the MIPLM subject matter expert Erdem Kaya
Presentation of the MIPLM subject matter expert Erdem Kaya
MIPLM
 
P-glycoprotein pamphlet: iteration 4 of 4 final
P-glycoprotein pamphlet: iteration 4 of 4 finalP-glycoprotein pamphlet: iteration 4 of 4 final
P-glycoprotein pamphlet: iteration 4 of 4 final
bs22n2s
 
K12 Tableau Tuesday - Algebra Equity and Access in Atlanta Public Schools
K12 Tableau Tuesday  - Algebra Equity and Access in Atlanta Public SchoolsK12 Tableau Tuesday  - Algebra Equity and Access in Atlanta Public Schools
K12 Tableau Tuesday - Algebra Equity and Access in Atlanta Public Schools
dogden2
 
LDMMIA Reiki Master Spring 2025 Mini Updates
LDMMIA Reiki Master Spring 2025 Mini UpdatesLDMMIA Reiki Master Spring 2025 Mini Updates
LDMMIA Reiki Master Spring 2025 Mini Updates
LDM Mia eStudios
 
Handling Multiple Choice Responses: Fortune Effiong.pptx
Handling Multiple Choice Responses: Fortune Effiong.pptxHandling Multiple Choice Responses: Fortune Effiong.pptx
Handling Multiple Choice Responses: Fortune Effiong.pptx
AuthorAIDNationalRes
 
To study the nervous system of insect.pptx
To study the nervous system of insect.pptxTo study the nervous system of insect.pptx
To study the nervous system of insect.pptx
Arshad Shaikh
 
Michelle Rumley & Mairéad Mooney, Boole Library, University College Cork. Tra...
Michelle Rumley & Mairéad Mooney, Boole Library, University College Cork. Tra...Michelle Rumley & Mairéad Mooney, Boole Library, University College Cork. Tra...
Michelle Rumley & Mairéad Mooney, Boole Library, University College Cork. Tra...
Library Association of Ireland
 
GDGLSPGCOER - Git and GitHub Workshop.pptx
GDGLSPGCOER - Git and GitHub Workshop.pptxGDGLSPGCOER - Git and GitHub Workshop.pptx
GDGLSPGCOER - Git and GitHub Workshop.pptx
azeenhodekar
 
One Hot encoding a revolution in Machine learning
One Hot encoding a revolution in Machine learningOne Hot encoding a revolution in Machine learning
One Hot encoding a revolution in Machine learning
momer9505
 
The ever evoilving world of science /7th class science curiosity /samyans aca...
The ever evoilving world of science /7th class science curiosity /samyans aca...The ever evoilving world of science /7th class science curiosity /samyans aca...
The ever evoilving world of science /7th class science curiosity /samyans aca...
Sandeep Swamy
 
Social Problem-Unemployment .pptx notes for Physiotherapy Students
Social Problem-Unemployment .pptx notes for Physiotherapy StudentsSocial Problem-Unemployment .pptx notes for Physiotherapy Students
Social Problem-Unemployment .pptx notes for Physiotherapy Students
DrNidhiAgarwal
 
Quality Contril Analysis of Containers.pdf
Quality Contril Analysis of Containers.pdfQuality Contril Analysis of Containers.pdf
Quality Contril Analysis of Containers.pdf
Dr. Bindiya Chauhan
 

Software Project Management chapter-1

  • 1. ©The McGraw-Hill Companies, 1 An Introduction Chapter 1 Software Project Management 4th Edition Robert Hughes and Mike Cotterell
  • 2. ©The McGraw-Hill Companies, 2 Outline of talk In this introduction the main questions to be addressed will be: – What is software project management? Is it really different from ‘ordinary’ project management? – How do you know when a project has been successful? For example, do the expectations of the customer/client match those of the developers?
  • 3. ©The McGraw-Hill Companies, 3 What is a project? Some dictionary definitions: “A specific plan or design” “A planned undertaking” “A large undertaking e.g. a public works scheme” Longmans dictionary Key points above are planning and size of task
  • 4. ©The McGraw-Hill Companies, 4 Jobs versus projects ‘Jobs’ – repetition of very well-defined and well understood tasks with very little uncertainty ‘Exploration’ – e.g. finding a cure for cancer: the outcome is very uncertain ‘Projects’ – in the middle!
  • 5. ©The McGraw-Hill Companies, 5 Characteristics of projects A task is more ‘project-like’ if it is: • Non-routine • Planned • Aiming at a specific target • Work carried out for a customer • Involving several specialisms • Made up of several different phases • Constrained by time and resources • Large and/or complex
  • 6. ©The McGraw-Hill Companies, 6 Are software projects really different from other projects? Not really! …but… • Invisibility • Complexity • Conformity • Flexibility make software more problematic to build than other engineered artefacts.
  • 7. ©The McGraw-Hill Companies, 7 Activities covered by project management Feasibility study Is project technically feasible and worthwhile from a business point of view? Planning Only done if project is feasible Execution Implement plan, but plan may be changed as we go along
  • 8. ©The McGraw-Hill Companies, 8 The software development life- cycle (ISO 12207)
  • 9. ©The McGraw-Hill Companies, 9 ISO 12207 life-cycle Requirements analysis – Requirements elicitation: what does the client need? – Analysis: converting ‘customer-facing’ requirements into equivalents that developers can understand – Requirements will cover • Functions • Quality • Resource constraints i.e. costs
  • 10. ©The McGraw-Hill Companies, 10 ISO 12207 life-cycle • Architecture design – Based on system requirements – Defines components of system: hardware, software, organizational – Software requirements will come out of this • Code and test – Of individual components • Integration – Putting the components together
  • 11. ©The McGraw-Hill Companies, 11 ISO12207 continued • Qualification testing – Testing the system (not just the software) • Installation – The process of making the system operational – Includes setting up standing data, setting system parameters, installing on operational hardware platforms, user training etc • Acceptance support – Including maintenance and enhancement
  • 12. ©The McGraw-Hill Companies, 12 Some ways of categorizing projects Distinguishing different types of project is important as different types of task need different project approaches e.g. • Information systems versus embedded systems • Objective-based versus product-based
  • 13. ©The McGraw-Hill Companies, 13 What is management? This involves the following activities: • Planning – deciding what is to be done • Organizing – making arrangements • Staffing – selecting the right people for the job • Directing – giving instructions continued…
  • 14. ©The McGraw-Hill Companies, 14 What is management? (continued) • Monitoring – checking on progress • Controlling – taking action to remedy hold-ups • Innovating – coming up with solutions when problems emerge • Representing – liaising with clients, users, developers and other stakeholders
  • 15. ©The McGraw-Hill Companies, 15 Setting objectives • Answering the question ‘What do we have to do to have a success?’ • Need for a project authority – Sets the project scope – Allocates/approves costs • Could be one person - or a group – Project Board – Project Management Board – Steering committee
  • 16. ©The McGraw-Hill Companies, 16 Objectives Informally, the objective of a project can be defined by completing the statement: The project will be regarded as a success if……………………………….. Rather like post-conditions for the project Focus on what will be put in place, rather than how activities will be carried out
  • 17. ©The McGraw-Hill Companies, 17 Objectives should be SMART S – specific, that is, concrete and well-defined M – measurable, that is, satisfaction of the objective can be objectively judged A – achievable, that is, it is within the power of the individual or group concerned to meet the target R – relevant, the objective must relevant to the true purpose of the project T – time constrained: there is defined point in time by which the objective should be achieved
  • 18. ©The McGraw-Hill Companies, 18 Goals/sub-objectives These are steps along the way to achieving the objective. Informally, these can be defined by completing the sentence… Objective X will be achieved IF the following goals are all achieved A…………… B…………… C…………… etc
  • 19. ©The McGraw-Hill Companies, 19 Goals/sub-objectives continued Often a goal can be allocated to an individual. Individual may have the capability of achieving goal, but not the objective on their own e.g. Objective – user satisfaction with software product Analyst goal – accurate requirements Developer goal – software that is reliable
  • 20. ©The McGraw-Hill Companies, 20 Measures of effectiveness How do we know that the goal or objective has been achieved? By a practical test, that can be objectively assessed. e.g. for user satisfaction with software product: • Repeat business – they buy further products from us • Number of complaints – if low etc etc
  • 21. ©The McGraw-Hill Companies, 21 Stakeholders These are people who have a stake or interest in the project In general, they could be users/clients or developers/implementers They could be: • Within the project team • Outside the project team, but within the same organization • Outside both the project team and the organization
  • 22. ©The McGraw-Hill Companies, 22 The business case Benefits of delivered project must outweigh costs Costs include: - Development - Operation Benefits - Quantifiable - Non-quantifiable £ £ Benefits Costs
  • 24. ©The McGraw-Hill Companies, 24 Management control Data – the raw details e.g. ‘6,000 documents processed at location X’ Information – the data is processed to produce something that is meaningful and useful e.g. ‘productivity is 100 documents a day’ Comparison with objectives/goals e.g. we will not meet target of processing all documents by 31st March continued…..
  • 25. ©The McGraw-Hill Companies, 25 Management control - continued Modelling – working out the probable outcomes of various decisions e.g. if we employ two more staff at location X how quickly can we get the documents processed? Implementation – carrying out the remedial actions that have been decided upon
  • 26. ©The McGraw-Hill Companies, 26 Key points in lecture • Projects are non-routine - thus uncertain • The particular problems of projects e.g. lack of visibility • Clear objectives are essential which can be objectively assessed • Stuff happens. Not usually possible to keep precisely plan – need for control • Communicate, communicate, communicate!

Editor's Notes

  • #3: The two key questions are: What exactly is software project management? This is going to be tackled by looking firstly at what is meant by ‘project’. We are then going to examine whether ‘software project management’ is really different from ‘normal’ project management. Is there anything special about software as opposed to other engineered artefacts? 2. How do we define whether a project is a success or not? The point about studying project management is to be able to have successful projects. So how do we know if we have been successful?
  • #4: Here are some definitions of ‘project’. No doubt there are other ones: for example ‘Unique process, consisting of a set of coordinated and controlled activities with start and finish dates, undertaken to achieve an objective conforming to specific requirements, including constraints of time, cost and resources’ BSO ISO 10006: 1997
  • #5: On the one hand there are repetitive jobs a similar task is carried out repeatedly, for example Kwikfit replacing a tyre on a car or a lecturer giving an introductory talk on project management. The task is well-defined and there is very little uncertainty. In some organizations, software development might tend to be like this – in these environments software process management might be more important than software project management On the other hand some exploratory activities are very uncertain. Some research projects can be like this – we may not be sure what the outcome will be, but we hope that we will learn some things of importance. It may be very difficult to come up with precise plans, although we would probably have some idea of a general approach. Projects seem to come somewhere between these two extremes. There are usually well-defined hoped-for outcomes but there are risks and uncertainties about achieving those outcomes.
  • #6: Exercise 1.1 in the Software Project Management text is a good way of introducing this material if you have time. I have found this exercise to be a good ‘ice-breaker’. Get each student to list the example activities in an order which matches the degree to which they merit the description of ‘project’. You can create a grid on a whiteboard with the projects on the vertical axis and the positions 1st, 2nd, 3rd etc on the horizontal axis. You then go through asking how many put ‘producing a newspaper’ first, second, etc. (Avoid making jokes about this being like the Eurovision song contest). This is time-consuming but it does mean that every student participates in building up a general picture of people’s perceptions, and you can discuss disagreements in perceptions as you go along.
  • #7: This is based on Fred Brooks’ paper No Silver Bullet: Essence and Accidents of Software Engineering which appeared in IEEE Computer 20(4) pp10-19 April 1987
  • #8: There are two key points here. Often you see something like ‘feasibility study’ being put as the first stage of development life cycle, and indeed it might be. However, the outcome of the feasibility study might be not to carry out the proposed project. Planning of the project should therefore take place after the feasibility study (or as a part of the feasibility study perhaps). Clearly the feasibility study itself might need a plan. All plans are to some extent provisional and subject to change. The key point is that the evolving plan allows us to control the project.
  • #9: This section of the lecture discusses the software development life cycle. Note that this is a technical model. It identifies the technical constraints on the order activities are done. This does NOT imply that a ‘waterfall’ approach is the only way to organize projects. The technical model could be implemented as increments or in an evolutionary manner.
  • #10: The key point here is that requirement analysis has to face in (at least) two different directions. It needs to communicate and elicit the requirements of the users, speaking in their language. It needs to organize and translate those requirements into a form that developers can understand and relate to.
  • #11: The software project will almost certainly be part of a larger project which has non-software elements. In a software engineering environment it could be the software will be embedded in hardware product of some kind. Thus there are system requirements for the product as a whole and software requirements for the software element. In a business information systems environment, the software development could be a relatively minor part of a much larger organizational change project.
  • #12: The confusion about what ‘implementation’ really means could be mentioned. Does it mean implementing the design (that is, coding) or implementing the complete system in its user environment? It is best to use ‘installation’ to describe the latter in order to avoid confusion.
  • #13: With objective-based projects, a general objective or problem is defined, and there are several different ways in which that objective could be reached. The project team have freedom to select what appears to be the most appropriate approach. With product-based projects, the product is already very strictly defined and the development team’s job is to implement the specification with which they have been presented. Arguably, information systems projects are more likely to be objective-based than is the case with software engineering. In many cases, an objective-based project could consider a problem and recommend a solution that is then implemented by a product-based project. Exercise 1.5 in the text is relevant here.
  • #14: This list is based on one that can be found in Introduction to Software Project Management and Quality Assurance by Darrel Ince, Helen Sharp and Mark Woodman, McGraw-Hill, 1993.
  • #15: Exercise 1.6 (a day in the life of a project manager) is of relevance here.
  • #16: Different people who are involved in a project (Stakeholders) will have different interests in the project and are likely to see different outcomes as being important. For example, end-users would want a system that is ‘user-friendly’, that is, easy to learn and to use, and a system that helps rather than hinders them from doing their jobs. Their managers may be more interested in whether the new system would allow them to reduce staffing levels. It is important therefore that a set of clearly defined objectives are identified and published for the project. Some individual or group needs to be pinpointed who acts as the main client for the project. See Exercise 1.7 in the text.
  • #17: The focus here needs to be on what the situation will be when the project is completed. In what ways will the world be different? The objectives should avoid describing activities: e.g. ‘a new payroll application will be operational by 4th April’ not ‘design and code a new payroll application’
  • #18: I have seen some places where the R is said to stand for ‘resource-constrained’, that is that there is a target cost associated with the achievement of the objective.
  • #19: Scoring a goal in football is a ‘goal’ or sub-objective on the way to achieving the overall objective of winning the match. Sub-objectives and objectives can be nested in a hierarchy, so that the objective of winning the match could itself be a goal or sub-objective on the way to winning the league etc.
  • #20: Goals can be formulated in such a way that they represent what an individual or group need to do to contribute to the success of the project’s objectives. In the example above, the analyst or developer, by themselves, cannot guarantee user satisfaction. However, the analyst can contribute to the achievement of the objective by making sure the users’ requirements are accurately recorded and the developer by making sure that the software is reliable. See Exercise 1.7 in the text.
  • #21: See Exercise 1.8 in the text.
  • #22: Each stakeholder will have their own goals and concerns in relation to the project which may be different from those of the project as a whole. For example, a software developer might work to make a living, pay the mortgage, learn new things, solve interesting problems. The main stakeholders need, however, to understand and accept the overall project objectives.
  • #23: It is not always possible to put a precise financial on the benefits of a project. The client’s willingness to pay up to a certain price to get a project implemented implies that they have informally identified a value to them of getting that project implemented.
  • #24: This is explained on the next overhead.
  • #25: This example is expanded in the text.
  • #26: The authors’ view is that an initially defective plan can often be remedied by good project control and management. This could be a discussion point.