Contents
1. Configuration Overview ............................................................................................................. 3
2. Configuration Control................................................................................................................. 3
3. Change log .................................................................................................................................. 3
3
1. Configuration Overview
In order to effectively manage the Reserchcolab.com Project, a coordinated Configuration
Management (CM) Plan has been followed. According the CM plan, CM roles and
responsibilities describe how the Reserchcolab.com Project team has track, implement, and
communicate configuration items (CIs) and changes throughout the project lifecycle.
2. Configuration Control
The Researchcolab.com Project has used a standardized configuration control process throughout
the project lifecycle in order to ensure all CIs are handled in a consistent manner and any
approved changes are fully reviewed regarding impact and communicated to project team.
Any configuration changes which are identified by the project team must be captured in a
configuration change request (CCR) and submitted to the Change Control Board (CCB). The
CCB has reviewed, analyzed, and approved/denied the request based on the impact, scope, time,
and cost of the proposed change. If the change is approved, the project requirements will be re-
baselined (if necessary) and all changes will be communicated to the project team and
stakeholders by the Project Manager. Denied CCRs may be re-submitted with additional or new
information for re-consideration by the CCB.
As CIs are identified by the project team, the Configuration Manager will assign a CI name and
the CI will be then assigned to the concern person. It is necessary that for any software changes,
testing is conducted by the testing specialist in order to validate any changes made.
3. Change log
The configuration change log is a document that is used by the project team to log and track
change requests throughout the life of the project. Configuration management is one area of
project management which will cause serious problems if it is not carefully managed. There may
be changes in requirements, deliverables, design, or other changes which can easily cause a
project to fail without a deliberate change management effort.
This document should be updated as new change requests are submitted or as existing change
requests are approved, rejected, or deferred. Most of the information on the change log will
come directly from the change request form that the project team uses. The change management
4
process should be clearly communicated to all stakeholders and if a change is requested it should
be submitted on the change request form. The project team will use the data from the change
request form to populate the change log. As the change request follows the change request
process and is reviewed and approved/denied/deferred, the status will be updated in the change
log.
The following table shows a common format used for the Researchcolab.com project change
request:
Change Request
Project: Researchcolab.com Date: 20/11/2016
Change Requestor: Minhas Kamal Change No: CR002
Change Category (Check all that apply):
□ Schedule □ Cost □ Scope □ Requirements/Deliverables
□ Testing/Quality □ Resources
Does this Change Affect (Check all that apply):
□ Corrective Action □ Preventative Action □ Defect Repair □ Updates
□ Other
Describe the Change Being Requested: Discussion rooms can have multiple administrators.
Describe the Reason for the Change: To give more user authority to the discussion room
Describe all Alternatives Considered: N/A
Describe any Technical Changes Required to Implement this Change: N/A
Describe Risks to be Considered for this Change:
Estimate Resources and Costs Needed to Implement this Change: N/A
Describe the Implications to Quality:
Disposition:
□ Approve □ Reject □ Defer
Justification of Approval, Rejection, or Deferral: This requirement change is not too much
important & does not add much value to the system.
5
The following table shows a common format used for the Researchcolab.com configuration
change log
Configuration Change Log
Project: Researchcolab.com Date: 25/11/16
Change
No.
Change Type Description of
Change
Requestor Date
Submitted
Date
Approved
Status Comments
CR001 Design Payment should
be an
independent
module, rather
than under Data
Sharing and
Review Request
module. Data
Sharing and
Review Request
module should
simply use it.
Minhas
Kamal
17/11/2016 18/11/2016 Accepted This request was
approved to
ensure the
Ease of use the
payment system.
CR002 Requirement Discussion
rooms can have
multiple
administrators.
Minhas
Kamal
20/11/2016 21/11/2016 Denied This requirement
change is not too
much important
& does not add
much value to the
system.
CR003 Design/ Scope This change
request calls for
modifying
existing network
firewalls to add
intrusion
detection
systems to
enhance network
security.
Kishan
Kumar
Ganguly
20/11/2016 21/11/2016 Deferred This request was
deferred and is
pending a
determination of
the impact to the
project's costs,
schedule and
scope.
CR004 Design/
Implementation
The change
request asks for
changing
encryption
mechanism for
authentication
for better
security
Kishan
Kumar
Ganguly
22/11/2016 23/11/2016 Accepted The request was
accepted because
it refers to an
acceptable
amount of change
in the design and
implementation.

More Related Content

What's hot (20)

PPTX
Software project management- Software Engineering
Muhammad Yousuf Abdul Qadir
 
PPSX
Software Project Planning V
Gagan Deep
 
PPTX
Software Project Management Slide
Ting Yin
 
PDF
Software Project Management Plan
Seval Çapraz
 
PPSX
Software Project Planning III
Gagan Deep
 
PPTX
Artifacts
Mayuresh Wadekar
 
PPSX
Software Project Planning IV
Gagan Deep
 
PDF
Software Development Plan of Fixed Asset Management System
Nasiruddin Juel
 
DOCX
Project audit & review checklist
Ram Srivastava
 
PPT
1 2. project management
akashsaini8
 
PPT
Software project management 3
Indu Sharma Bhardwaj
 
PDF
Software project management
R A Akerkar
 
DOCX
Spm unit 3
Naga Dinesh
 
PPT
Software project management
Sutha Vincent
 
PPTX
Software Project Management ppt
Andreea Usatenco
 
PPT
SOFTWARE PROJECT MANAGEMENT TOOL PPT
Sai Charan
 
PPTX
A weaver cost management top gear corporation
Altha Weaver
 
PPTX
Ch23 project planning
software-engineering-book
 
PDF
SE18_SE_Lec 12_ Project Management 1
Amr E. Mohamed
 
PPTX
Software Project Management - NESDEV
Krit Kamtuo
 
Software project management- Software Engineering
Muhammad Yousuf Abdul Qadir
 
Software Project Planning V
Gagan Deep
 
Software Project Management Slide
Ting Yin
 
Software Project Management Plan
Seval Çapraz
 
Software Project Planning III
Gagan Deep
 
Artifacts
Mayuresh Wadekar
 
Software Project Planning IV
Gagan Deep
 
Software Development Plan of Fixed Asset Management System
Nasiruddin Juel
 
Project audit & review checklist
Ram Srivastava
 
1 2. project management
akashsaini8
 
Software project management 3
Indu Sharma Bhardwaj
 
Software project management
R A Akerkar
 
Spm unit 3
Naga Dinesh
 
Software project management
Sutha Vincent
 
Software Project Management ppt
Andreea Usatenco
 
SOFTWARE PROJECT MANAGEMENT TOOL PPT
Sai Charan
 
A weaver cost management top gear corporation
Altha Weaver
 
Ch23 project planning
software-engineering-book
 
SE18_SE_Lec 12_ Project Management 1
Amr E. Mohamed
 
Software Project Management - NESDEV
Krit Kamtuo
 

Viewers also liked (20)

PDF
Proposal: A Study on Business Communucation System of KAZ Software
Minhas Kamal
 
PDF
Software Requirements Specification on Bengali Braille to Text Translator
Minhas Kamal
 
PDF
Project Proposal: Bengali Braille to Text Translation
Minhas Kamal
 
PDF
Software Project Management: Project Planning
Minhas Kamal
 
PDF
Software Project Management: Change Control
Minhas Kamal
 
PPTX
Software Project Management Presentation Final
Minhas Kamal
 
PDF
Software Project Management: Project Initiation
Minhas Kamal
 
PPTX
Software Project Proposal: Bengali Braille to Text Translation
Minhas Kamal
 
PDF
Software Project Management: Project Charter
Minhas Kamal
 
PDF
Software Project Management: Risk Management
Minhas Kamal
 
PDF
Final Internship Report
Minhas Kamal
 
PDF
Letter of Endorsement Sample
Minhas Kamal
 
PDF
Report Acknowledgement Sample
Minhas Kamal
 
PDF
Software Requirements Specification on Student Information System (SRS on SIS)
Minhas Kamal
 
PDF
Software Project Management: Software Architecture
Minhas Kamal
 
PDF
Complete MPICH2 Clustering Manual in Ubuntu
Minhas Kamal
 
PPTX
Software Project Presentation: Leaf Me Alone
Minhas Kamal
 
PDF
Numerical Method Analysis: Algebraic and Transcendental Equations (Linear)
Minhas Kamal
 
PDF
Software Project Proposal- Result Analysis Tool
Minhas Kamal
 
PPTX
Amazing Math Tips & Tricks
Minhas Kamal
 
Proposal: A Study on Business Communucation System of KAZ Software
Minhas Kamal
 
Software Requirements Specification on Bengali Braille to Text Translator
Minhas Kamal
 
Project Proposal: Bengali Braille to Text Translation
Minhas Kamal
 
Software Project Management: Project Planning
Minhas Kamal
 
Software Project Management: Change Control
Minhas Kamal
 
Software Project Management Presentation Final
Minhas Kamal
 
Software Project Management: Project Initiation
Minhas Kamal
 
Software Project Proposal: Bengali Braille to Text Translation
Minhas Kamal
 
Software Project Management: Project Charter
Minhas Kamal
 
Software Project Management: Risk Management
Minhas Kamal
 
Final Internship Report
Minhas Kamal
 
Letter of Endorsement Sample
Minhas Kamal
 
Report Acknowledgement Sample
Minhas Kamal
 
Software Requirements Specification on Student Information System (SRS on SIS)
Minhas Kamal
 
Software Project Management: Software Architecture
Minhas Kamal
 
Complete MPICH2 Clustering Manual in Ubuntu
Minhas Kamal
 
Software Project Presentation: Leaf Me Alone
Minhas Kamal
 
Numerical Method Analysis: Algebraic and Transcendental Equations (Linear)
Minhas Kamal
 
Software Project Proposal- Result Analysis Tool
Minhas Kamal
 
Amazing Math Tips & Tricks
Minhas Kamal
 
Ad

Similar to Software Project Management: Configuration Management (20)

PPTX
Software Engineering- Chapter 9.pptx
FarjanaParvin5
 
PDF
SE2_Lec 22_Software Configuration Management
Amr E. Mohamed
 
PPTX
Assisit with devlopment.pptx
TadeseBeyene
 
PDF
What is configuration management
Software Testing Books
 
PPT
Software Configuration Management introduction
Mani Deepak Choudhry
 
PPT
lecture14.ppt
ubaidullah75790
 
PPT
Configuration Management
Saqib Raza
 
PPT
A Brief Introduction to Software Configuration Management
Md Mamunur Rashid
 
PDF
Change control and configuration
Institute of Validation Technology
 
PDF
Change control and configuration
Institute of Validation Technology
 
PDF
SE2018_Lec 21_ Software Configuration Management (SCM)
Amr E. Mohamed
 
PDF
Configuration-Release management
Ravindranath Tagore
 
PPT
Software Configuration Management
elliando dias
 
PPT
5 itil v3 service transition 5 v1.8
Karthik Arumugham
 
PDF
Ch25modreiohgfjkl;sfda;kljfsda;jkldsaf.pdf
lam668956
 
PPT
Software Configuration Management.ppt
DrTThendralCompSci
 
PPTX
Itil prc review
Steven Ragsdale
 
PPTX
Software Configuration Management
Arunnima B S
 
PPTX
Software Configuration Management.pptx
ShanmugapriyaSenthil3
 
Software Engineering- Chapter 9.pptx
FarjanaParvin5
 
SE2_Lec 22_Software Configuration Management
Amr E. Mohamed
 
Assisit with devlopment.pptx
TadeseBeyene
 
What is configuration management
Software Testing Books
 
Software Configuration Management introduction
Mani Deepak Choudhry
 
lecture14.ppt
ubaidullah75790
 
Configuration Management
Saqib Raza
 
A Brief Introduction to Software Configuration Management
Md Mamunur Rashid
 
Change control and configuration
Institute of Validation Technology
 
Change control and configuration
Institute of Validation Technology
 
SE2018_Lec 21_ Software Configuration Management (SCM)
Amr E. Mohamed
 
Configuration-Release management
Ravindranath Tagore
 
Software Configuration Management
elliando dias
 
5 itil v3 service transition 5 v1.8
Karthik Arumugham
 
Ch25modreiohgfjkl;sfda;kljfsda;jkldsaf.pdf
lam668956
 
Software Configuration Management.ppt
DrTThendralCompSci
 
Itil prc review
Steven Ragsdale
 
Software Configuration Management
Arunnima B S
 
Software Configuration Management.pptx
ShanmugapriyaSenthil3
 
Ad

More from Minhas Kamal (11)

PPTX
Digital Image Processing
Minhas Kamal
 
PPTX
Deep Learning - Exploring The Magical World of Neural Network
Minhas Kamal
 
PPTX
Machine Learning - Entering into The Wonderful Galaxy of Machine Learning
Minhas Kamal
 
PPTX
Artificial Intelligence - Staring at The Grand Universe of AI (1)
Minhas Kamal
 
PDF
Final Project Report- Bengali Braille to Text Translator
Minhas Kamal
 
PDF
Abstract- Bengali Braille to Text Translator
Minhas Kamal
 
PDF
Software Project Management: Software Requirement Specification
Minhas Kamal
 
PPTX
Software Design: User Interface Design
Minhas Kamal
 
PPTX
Business Communication System: KAZ Software
Minhas Kamal
 
PPTX
Final Internship Presentation
Minhas Kamal
 
PDF
Letter of Transmittal
Minhas Kamal
 
Digital Image Processing
Minhas Kamal
 
Deep Learning - Exploring The Magical World of Neural Network
Minhas Kamal
 
Machine Learning - Entering into The Wonderful Galaxy of Machine Learning
Minhas Kamal
 
Artificial Intelligence - Staring at The Grand Universe of AI (1)
Minhas Kamal
 
Final Project Report- Bengali Braille to Text Translator
Minhas Kamal
 
Abstract- Bengali Braille to Text Translator
Minhas Kamal
 
Software Project Management: Software Requirement Specification
Minhas Kamal
 
Software Design: User Interface Design
Minhas Kamal
 
Business Communication System: KAZ Software
Minhas Kamal
 
Final Internship Presentation
Minhas Kamal
 
Letter of Transmittal
Minhas Kamal
 

Recently uploaded (20)

PPTX
Change Common Properties in IBM SPSS Statistics Version 31.pptx
Version 1 Analytics
 
PDF
How to Hire AI Developers_ Step-by-Step Guide in 2025.pdf
DianApps Technologies
 
PDF
Linux Certificate of Completion - LabEx Certificate
VICTOR MAESTRE RAMIREZ
 
PDF
Top Agile Project Management Tools for Teams in 2025
Orangescrum
 
PDF
Wondershare PDFelement Pro Crack for MacOS New Version Latest 2025
bashirkhan333g
 
PPTX
Agentic Automation: Build & Deploy Your First UiPath Agent
klpathrudu
 
PDF
The 5 Reasons for IT Maintenance - Arna Softech
Arna Softech
 
PPTX
Transforming Mining & Engineering Operations with Odoo ERP | Streamline Proje...
SatishKumar2651
 
PPTX
Home Care Tools: Benefits, features and more
Third Rock Techkno
 
PPTX
Agentic Automation Journey Series Day 2 – Prompt Engineering for UiPath Agents
klpathrudu
 
PDF
Automate Cybersecurity Tasks with Python
VICTOR MAESTRE RAMIREZ
 
PPTX
Milwaukee Marketo User Group - Summer Road Trip: Mapping and Personalizing Yo...
bbedford2
 
PDF
AI + DevOps = Smart Automation with devseccops.ai.pdf
Devseccops.ai
 
PDF
TheFutureIsDynamic-BoxLang witch Luis Majano.pdf
Ortus Solutions, Corp
 
PDF
4K Video Downloader Plus Pro Crack for MacOS New Download 2025
bashirkhan333g
 
PPTX
Why Businesses Are Switching to Open Source Alternatives to Crystal Reports.pptx
Varsha Nayak
 
PDF
Why Businesses Are Switching to Open Source Alternatives to Crystal Reports.pdf
Varsha Nayak
 
PDF
Unlock Efficiency with Insurance Policy Administration Systems
Insurance Tech Services
 
PPTX
Hardware(Central Processing Unit ) CU and ALU
RizwanaKalsoom2
 
PDF
IDM Crack with Internet Download Manager 6.42 Build 43 with Patch Latest 2025
bashirkhan333g
 
Change Common Properties in IBM SPSS Statistics Version 31.pptx
Version 1 Analytics
 
How to Hire AI Developers_ Step-by-Step Guide in 2025.pdf
DianApps Technologies
 
Linux Certificate of Completion - LabEx Certificate
VICTOR MAESTRE RAMIREZ
 
Top Agile Project Management Tools for Teams in 2025
Orangescrum
 
Wondershare PDFelement Pro Crack for MacOS New Version Latest 2025
bashirkhan333g
 
Agentic Automation: Build & Deploy Your First UiPath Agent
klpathrudu
 
The 5 Reasons for IT Maintenance - Arna Softech
Arna Softech
 
Transforming Mining & Engineering Operations with Odoo ERP | Streamline Proje...
SatishKumar2651
 
Home Care Tools: Benefits, features and more
Third Rock Techkno
 
Agentic Automation Journey Series Day 2 – Prompt Engineering for UiPath Agents
klpathrudu
 
Automate Cybersecurity Tasks with Python
VICTOR MAESTRE RAMIREZ
 
Milwaukee Marketo User Group - Summer Road Trip: Mapping and Personalizing Yo...
bbedford2
 
AI + DevOps = Smart Automation with devseccops.ai.pdf
Devseccops.ai
 
TheFutureIsDynamic-BoxLang witch Luis Majano.pdf
Ortus Solutions, Corp
 
4K Video Downloader Plus Pro Crack for MacOS New Download 2025
bashirkhan333g
 
Why Businesses Are Switching to Open Source Alternatives to Crystal Reports.pptx
Varsha Nayak
 
Why Businesses Are Switching to Open Source Alternatives to Crystal Reports.pdf
Varsha Nayak
 
Unlock Efficiency with Insurance Policy Administration Systems
Insurance Tech Services
 
Hardware(Central Processing Unit ) CU and ALU
RizwanaKalsoom2
 
IDM Crack with Internet Download Manager 6.42 Build 43 with Patch Latest 2025
bashirkhan333g
 

Software Project Management: Configuration Management

  • 1. 1 ResearchColab Configuration Management Team: Reckless 7 Institute of Information Technology University of Dhaka 25th November, 2016
  • 2. 2 Contents 1. Configuration Overview ............................................................................................................. 3 2. Configuration Control................................................................................................................. 3 3. Change log .................................................................................................................................. 3
  • 3. 3 1. Configuration Overview In order to effectively manage the Reserchcolab.com Project, a coordinated Configuration Management (CM) Plan has been followed. According the CM plan, CM roles and responsibilities describe how the Reserchcolab.com Project team has track, implement, and communicate configuration items (CIs) and changes throughout the project lifecycle. 2. Configuration Control The Researchcolab.com Project has used a standardized configuration control process throughout the project lifecycle in order to ensure all CIs are handled in a consistent manner and any approved changes are fully reviewed regarding impact and communicated to project team. Any configuration changes which are identified by the project team must be captured in a configuration change request (CCR) and submitted to the Change Control Board (CCB). The CCB has reviewed, analyzed, and approved/denied the request based on the impact, scope, time, and cost of the proposed change. If the change is approved, the project requirements will be re- baselined (if necessary) and all changes will be communicated to the project team and stakeholders by the Project Manager. Denied CCRs may be re-submitted with additional or new information for re-consideration by the CCB. As CIs are identified by the project team, the Configuration Manager will assign a CI name and the CI will be then assigned to the concern person. It is necessary that for any software changes, testing is conducted by the testing specialist in order to validate any changes made. 3. Change log The configuration change log is a document that is used by the project team to log and track change requests throughout the life of the project. Configuration management is one area of project management which will cause serious problems if it is not carefully managed. There may be changes in requirements, deliverables, design, or other changes which can easily cause a project to fail without a deliberate change management effort. This document should be updated as new change requests are submitted or as existing change requests are approved, rejected, or deferred. Most of the information on the change log will come directly from the change request form that the project team uses. The change management
  • 4. 4 process should be clearly communicated to all stakeholders and if a change is requested it should be submitted on the change request form. The project team will use the data from the change request form to populate the change log. As the change request follows the change request process and is reviewed and approved/denied/deferred, the status will be updated in the change log. The following table shows a common format used for the Researchcolab.com project change request: Change Request Project: Researchcolab.com Date: 20/11/2016 Change Requestor: Minhas Kamal Change No: CR002 Change Category (Check all that apply): □ Schedule □ Cost □ Scope □ Requirements/Deliverables □ Testing/Quality □ Resources Does this Change Affect (Check all that apply): □ Corrective Action □ Preventative Action □ Defect Repair □ Updates □ Other Describe the Change Being Requested: Discussion rooms can have multiple administrators. Describe the Reason for the Change: To give more user authority to the discussion room Describe all Alternatives Considered: N/A Describe any Technical Changes Required to Implement this Change: N/A Describe Risks to be Considered for this Change: Estimate Resources and Costs Needed to Implement this Change: N/A Describe the Implications to Quality: Disposition: □ Approve □ Reject □ Defer Justification of Approval, Rejection, or Deferral: This requirement change is not too much important & does not add much value to the system.
  • 5. 5 The following table shows a common format used for the Researchcolab.com configuration change log Configuration Change Log Project: Researchcolab.com Date: 25/11/16 Change No. Change Type Description of Change Requestor Date Submitted Date Approved Status Comments CR001 Design Payment should be an independent module, rather than under Data Sharing and Review Request module. Data Sharing and Review Request module should simply use it. Minhas Kamal 17/11/2016 18/11/2016 Accepted This request was approved to ensure the Ease of use the payment system. CR002 Requirement Discussion rooms can have multiple administrators. Minhas Kamal 20/11/2016 21/11/2016 Denied This requirement change is not too much important & does not add much value to the system. CR003 Design/ Scope This change request calls for modifying existing network firewalls to add intrusion detection systems to enhance network security. Kishan Kumar Ganguly 20/11/2016 21/11/2016 Deferred This request was deferred and is pending a determination of the impact to the project's costs, schedule and scope. CR004 Design/ Implementation The change request asks for changing encryption mechanism for authentication for better security Kishan Kumar Ganguly 22/11/2016 23/11/2016 Accepted The request was accepted because it refers to an acceptable amount of change in the design and implementation.