Soil Improvement
Methods of soil improvement
• Removal and replacement
• Precompression
• Vertical drains
• In-situ densification
• Grouting
• Stabilization using admixtures
• Reinforcement
Removal and replacement
• One of oldest and simplest methods is
simply to remove and replace the soil
• Soils that will have to be replaced include
contaminated soils or organic soils
• Method is usually practical only above the
groundwater table
Precompression
• Simply place a surcharge fill on top of the soil that
requires consolidation
• Once sufficient consolidation has taken place, the
fill can be removed and construction takes place
• Surcharge fills are typically 10-25 feet thick and
generally produces settlement of 1 to 3 feet.
• Most effective in clay soil
Advantages of precompression
• Requires only conventional earthmoving
equipment
• Any grading contractor can perform the
work
• Long track record of success
Disadvantages of precompression
• Surcharge fill must extend horizontally at
least 10 m beyond the perimeter of the
planned construction, which may not be
possible at confined sites
• Transport of large quantities of soil required
• Surcharge must remain in place for months
or years, thus delaying construction
Vertical Drains
• Vertical drains are installed under a surcharge load
to accelerate the drainage of impervious soils and
thus speed up consolidation
• These drains provide a shorter path for the water
to flow through to get away from the soil
• Time to drain clay layers can be reduced from
years to a couple of months
Vertical Drains
Wick Drains
• Geosynthetics used as
a substitute to sand
columns
• Installed by being
pushed or vibrated
into the ground
• Most are about 100
mm wide and 5 mm
thick
Typical installation of wick
drains
• Typically spaced 3 m
on centers
Prefabricated Drains Available in
US
•Alidrain
•Aliwick
•Ameridrain
•Colbond Drain
•Mebradrain
In-situ densification
• Most effective in sands
• Methods used in conventional earthwork are
only effective to about 2 m below the
surface
• In-situ methods like dynamic deep
compaction are for soils deeper than can be
compacted from the surface
Dynamic vs. Vibratory
Vibratory probe compaction
• Long probe mounted onto a vibratory pile
driver compacts the soil around the probe;
penetrations spaced in a grid pattern similar
to vertical drains
Vibratory probe compaction
Beware of transmission of
ground vibrations
Vibroflotation
• Probe includes the vibrator mechanism and water
jets
• Probe is lowered into the ground using a crane
• Vibratory eccentric force induces densification
and water jets assist in insertion and extraction
• Vibratory probe compaction is effective if silt
content is less than 12-15% and clay is less than
3%
• Probes inserted in grid pattern at a spacing of 1.5
to 3 m
Vibroflotation
Ground Type
Relative
Effectiveness
Sands Excellent
Silty Sands Marginal to Good
Silts Poor
Clays Not applicable
Mine Spoils Good (if granular)
Dumped Fill
Depends upon nature
of fill
Garbage Not Applicable
Vibro-replacement stone columns
• Vibro-Replacement extends the range of
soils that can be improved by vibratory
techniques to include cohesive soils.
Reinforcement of the soil with compacted
granular columns or "stone columns" is
accomplished by the top-feed method.
Top-feed vibroflot rig
Adding stone in top-feed installation Bottom-feed vibroflot rig
Vibro-replacement stone columns
Dynamic compaction
• Uses a special crane to
lift 5-30 tons to
heights of 40 to 100
feet then drop these
weights onto the
ground
• Cost effective method
of densifying loose
sands and silty soils up
to 15 to 30 feet deep
Grouting
• Defined as the injection of a special liquid
or slurry material called grout into the
ground for the purpose of improving the soil
or rock
• Types of grouts
– Cementitious grouts
– Chemical grouts
Grouting methods
Intrusion grouting
– Consists of filling joints or fractures with grout
– Primary benefit is reduction in hydraulic conductivity
– Used to prepare foundation and abutments for dams
– Usually done using cementitious grouts
Permeation grouting
– Injection of thin grouts into the soil
– Once the soil cures, becomes a solid mass
– Done using chemical grouts
– Used for creating groundwater barriers or preparign
ground before tunneling
Grouting methods
• Compaction grouting
– When low-slump
compaction grout is injected
into granular soils, grout
bulbs are formed that
displace and densify the
surrounding loose soils.
– Used to repair structures that
have excessive settlement
Grouting methods
Jet grouting
– Developed in Japan
– Uses a special pipe with horizontal jets that inject grout
into the ground at high pressures
– Jet grouting is an erosion/replacement system that
creates an engineered, in situ soil/cement product
known as Soilcretesm. Effective across the widest range
of soil types, and capable of being performed around
subsurface obstructions and in confined spaces, jet
grouting is a versatile and valuable tool for soft soil
stabilization, underpinning, excavation support and
groundwater control.
Stabilization using admixtures
• Most common admixture is Portland Cement
• When mixed with soil, forms soil-cement which is
comparable to a weak concrete
• Other admixtures include lime and asphalt
• Objective is to provide artificial cementation, thus
increasing strength and reducing both
compressibility and hydraulic conductivity
• Used to reduce expansion potential of clays
• Used in surface mixing applications
Reinforcement
• Soil is stronger in compression than in
tension
• To improve strength in tension,
geosynthetics placed in soil for soil
reinforcement
Reinforced earthwall
construction
Soil Nailing
• The fundamental concept
of soil nailing consists of
reinforcing the ground by
passive inclusions, closely
spaced, to create in-situ a
coherent gravity structure
and thereby to increase the
overall shear strength of the
in-situ soil and restrain its
displacements.

More Related Content

PPTX
CONSTRUCTION OF ROADS
PPTX
Vane shear test
PPTX
Plate load test ppt
PDF
Subsurface exploration of soil
PPTX
PPT
Flexible and-rigid-pavements
PPT
Soil exploration part i
PPT
Bearing capacity of soil final
CONSTRUCTION OF ROADS
Vane shear test
Plate load test ppt
Subsurface exploration of soil
Flexible and-rigid-pavements
Soil exploration part i
Bearing capacity of soil final

What's hot (20)

PPTX
Construction of flexible pavement
PPT
Types of earth dams
PPTX
Failures of a earthen dam
PPTX
DRAG-LINE CONSTRUCTION EQUIPMENT
PDF
PLATE LOAD TEST.pdf
PPTX
Soil Compaction
PPTX
Soil investigation
PPT
Rigid pavement
PPTX
Construction of flexible pavements
PDF
ground improvement with admixtures
PPTX
TYPES OF SOIL SAMPLE AND SAMPLERS .
PDF
Consolidation nec
PPTX
Slope stability
PPTX
PPTX
DIFFERENT TYPES OF Well foundation & THEIR RELATIVE MERITS &DEMRITS
PDF
IS Classification of Soils
PPTX
Field control of compaction and compaction Equipment
PPTX
Standard penetration test (spt)
PPTX
Grouting in Soils
PPTX
Rbte Drainage system in tunnel
Construction of flexible pavement
Types of earth dams
Failures of a earthen dam
DRAG-LINE CONSTRUCTION EQUIPMENT
PLATE LOAD TEST.pdf
Soil Compaction
Soil investigation
Rigid pavement
Construction of flexible pavements
ground improvement with admixtures
TYPES OF SOIL SAMPLE AND SAMPLERS .
Consolidation nec
Slope stability
DIFFERENT TYPES OF Well foundation & THEIR RELATIVE MERITS &DEMRITS
IS Classification of Soils
Field control of compaction and compaction Equipment
Standard penetration test (spt)
Grouting in Soils
Rbte Drainage system in tunnel
Ad

Similar to Soil improvement (20)

PPTX
git ppt.pptx engineering civil engineering
PPTX
Chapter 6.0 modern foundation tech. & ground improvement
PPT
GROUND IMPROVEMENT-DENSIFICATION METHODS
PPTX
Akash verma.pptx
PPTX
Ground improvement techniques-GROUTING - I-II.pptx
PPTX
Ground improvement techniques-DEWATERING
PPTX
UNIT - II-II VERTICAL DRAINS COHESIVE SOILS.pptx
PPTX
Roads in desert, swamp & black cotton
PPTX
Civil Engineering-Dewatering
PDF
Ground improvement techniques compaction vibration
PPTX
Dynamic_compaction.pptx
PPTX
II-II DENSIFICATION METHODS IN COHESIVE SOILS.pptx
PPTX
substructureconstruction_tunneling_diaphramwalls.PPTX
PPTX
Dewatering techniques
PPTX
Foundations.pptx
PPTX
Study of Prefabricated Vertical Drains
PPTX
Control of ground water in excavation
PPT
1.9 GROUTING.ppt
PDF
Git-Grouting. Civil engineering is shesar
PPT
git ppt.pptx engineering civil engineering
Chapter 6.0 modern foundation tech. & ground improvement
GROUND IMPROVEMENT-DENSIFICATION METHODS
Akash verma.pptx
Ground improvement techniques-GROUTING - I-II.pptx
Ground improvement techniques-DEWATERING
UNIT - II-II VERTICAL DRAINS COHESIVE SOILS.pptx
Roads in desert, swamp & black cotton
Civil Engineering-Dewatering
Ground improvement techniques compaction vibration
Dynamic_compaction.pptx
II-II DENSIFICATION METHODS IN COHESIVE SOILS.pptx
substructureconstruction_tunneling_diaphramwalls.PPTX
Dewatering techniques
Foundations.pptx
Study of Prefabricated Vertical Drains
Control of ground water in excavation
1.9 GROUTING.ppt
Git-Grouting. Civil engineering is shesar
Ad

Recently uploaded (20)

PPTX
WN UNIT-II CH4_MKaruna_BapatlaEngineeringCollege.pptx
PPTX
DATA STRCUTURE LABORATORY -BCSL305(PRG1)
PDF
Engineering Solutions for Ethical Dilemmas in Healthcare (www.kiu.ac.ug)
PPTX
Solar energy pdf of gitam songa hemant k
PDF
V2500 Owner and Operatore Guide for Airbus
PPTX
Module1.pptxrjkeieuekwkwoowkemehehehrjrjrj
PPTX
ARCHITECTURE AND PROGRAMMING OF EMBEDDED SYSTEMS
PPTX
Real Estate Management PART 1.pptxFFFFFFFFFFFFF
PPTX
SC Robotics Team Safety Training Presentation
PPTX
SE unit 1.pptx aaahshdhajdviwhsiehebeiwheiebeiev
DOCX
ENVIRONMENTAL PROTECTION AND MANAGEMENT (18CVL756)
PPTX
Unit IImachinemachinetoolopeartions.pptx
PPTX
Software-Development-Life-Cycle-SDLC.pptx
PDF
ASPEN PLUS USER GUIDE - PROCESS SIMULATIONS
PDF
electrical machines course file-anna university
PDF
ECT443_instrumentation_Engg_mod-1.pdf indroduction to instrumentation
PPTX
AI-Reporting for Emerging Technologies(BS Computer Engineering)
PDF
MACCAFERRY GUIA GAVIONES TERRAPLENES EN ESPAÑOL
PDF
Cryptography and Network Security-Module-I.pdf
PDF
ST MNCWANGO P2 WIL (MEPR302) FINAL REPORT.pdf
WN UNIT-II CH4_MKaruna_BapatlaEngineeringCollege.pptx
DATA STRCUTURE LABORATORY -BCSL305(PRG1)
Engineering Solutions for Ethical Dilemmas in Healthcare (www.kiu.ac.ug)
Solar energy pdf of gitam songa hemant k
V2500 Owner and Operatore Guide for Airbus
Module1.pptxrjkeieuekwkwoowkemehehehrjrjrj
ARCHITECTURE AND PROGRAMMING OF EMBEDDED SYSTEMS
Real Estate Management PART 1.pptxFFFFFFFFFFFFF
SC Robotics Team Safety Training Presentation
SE unit 1.pptx aaahshdhajdviwhsiehebeiwheiebeiev
ENVIRONMENTAL PROTECTION AND MANAGEMENT (18CVL756)
Unit IImachinemachinetoolopeartions.pptx
Software-Development-Life-Cycle-SDLC.pptx
ASPEN PLUS USER GUIDE - PROCESS SIMULATIONS
electrical machines course file-anna university
ECT443_instrumentation_Engg_mod-1.pdf indroduction to instrumentation
AI-Reporting for Emerging Technologies(BS Computer Engineering)
MACCAFERRY GUIA GAVIONES TERRAPLENES EN ESPAÑOL
Cryptography and Network Security-Module-I.pdf
ST MNCWANGO P2 WIL (MEPR302) FINAL REPORT.pdf

Soil improvement

  • 2. Methods of soil improvement • Removal and replacement • Precompression • Vertical drains • In-situ densification • Grouting • Stabilization using admixtures • Reinforcement
  • 3. Removal and replacement • One of oldest and simplest methods is simply to remove and replace the soil • Soils that will have to be replaced include contaminated soils or organic soils • Method is usually practical only above the groundwater table
  • 4. Precompression • Simply place a surcharge fill on top of the soil that requires consolidation • Once sufficient consolidation has taken place, the fill can be removed and construction takes place • Surcharge fills are typically 10-25 feet thick and generally produces settlement of 1 to 3 feet. • Most effective in clay soil
  • 5. Advantages of precompression • Requires only conventional earthmoving equipment • Any grading contractor can perform the work • Long track record of success
  • 6. Disadvantages of precompression • Surcharge fill must extend horizontally at least 10 m beyond the perimeter of the planned construction, which may not be possible at confined sites • Transport of large quantities of soil required • Surcharge must remain in place for months or years, thus delaying construction
  • 7. Vertical Drains • Vertical drains are installed under a surcharge load to accelerate the drainage of impervious soils and thus speed up consolidation • These drains provide a shorter path for the water to flow through to get away from the soil • Time to drain clay layers can be reduced from years to a couple of months
  • 9. Wick Drains • Geosynthetics used as a substitute to sand columns • Installed by being pushed or vibrated into the ground • Most are about 100 mm wide and 5 mm thick
  • 10. Typical installation of wick drains • Typically spaced 3 m on centers Prefabricated Drains Available in US •Alidrain •Aliwick •Ameridrain •Colbond Drain •Mebradrain
  • 11. In-situ densification • Most effective in sands • Methods used in conventional earthwork are only effective to about 2 m below the surface • In-situ methods like dynamic deep compaction are for soils deeper than can be compacted from the surface
  • 13. Vibratory probe compaction • Long probe mounted onto a vibratory pile driver compacts the soil around the probe; penetrations spaced in a grid pattern similar to vertical drains
  • 15. Beware of transmission of ground vibrations
  • 16. Vibroflotation • Probe includes the vibrator mechanism and water jets • Probe is lowered into the ground using a crane • Vibratory eccentric force induces densification and water jets assist in insertion and extraction • Vibratory probe compaction is effective if silt content is less than 12-15% and clay is less than 3% • Probes inserted in grid pattern at a spacing of 1.5 to 3 m
  • 17. Vibroflotation Ground Type Relative Effectiveness Sands Excellent Silty Sands Marginal to Good Silts Poor Clays Not applicable Mine Spoils Good (if granular) Dumped Fill Depends upon nature of fill Garbage Not Applicable
  • 18. Vibro-replacement stone columns • Vibro-Replacement extends the range of soils that can be improved by vibratory techniques to include cohesive soils. Reinforcement of the soil with compacted granular columns or "stone columns" is accomplished by the top-feed method.
  • 19. Top-feed vibroflot rig Adding stone in top-feed installation Bottom-feed vibroflot rig Vibro-replacement stone columns
  • 20. Dynamic compaction • Uses a special crane to lift 5-30 tons to heights of 40 to 100 feet then drop these weights onto the ground • Cost effective method of densifying loose sands and silty soils up to 15 to 30 feet deep
  • 21. Grouting • Defined as the injection of a special liquid or slurry material called grout into the ground for the purpose of improving the soil or rock • Types of grouts – Cementitious grouts – Chemical grouts
  • 22. Grouting methods Intrusion grouting – Consists of filling joints or fractures with grout – Primary benefit is reduction in hydraulic conductivity – Used to prepare foundation and abutments for dams – Usually done using cementitious grouts Permeation grouting – Injection of thin grouts into the soil – Once the soil cures, becomes a solid mass – Done using chemical grouts – Used for creating groundwater barriers or preparign ground before tunneling
  • 23. Grouting methods • Compaction grouting – When low-slump compaction grout is injected into granular soils, grout bulbs are formed that displace and densify the surrounding loose soils. – Used to repair structures that have excessive settlement
  • 24. Grouting methods Jet grouting – Developed in Japan – Uses a special pipe with horizontal jets that inject grout into the ground at high pressures – Jet grouting is an erosion/replacement system that creates an engineered, in situ soil/cement product known as Soilcretesm. Effective across the widest range of soil types, and capable of being performed around subsurface obstructions and in confined spaces, jet grouting is a versatile and valuable tool for soft soil stabilization, underpinning, excavation support and groundwater control.
  • 25. Stabilization using admixtures • Most common admixture is Portland Cement • When mixed with soil, forms soil-cement which is comparable to a weak concrete • Other admixtures include lime and asphalt • Objective is to provide artificial cementation, thus increasing strength and reducing both compressibility and hydraulic conductivity • Used to reduce expansion potential of clays • Used in surface mixing applications
  • 26. Reinforcement • Soil is stronger in compression than in tension • To improve strength in tension, geosynthetics placed in soil for soil reinforcement
  • 28. Soil Nailing • The fundamental concept of soil nailing consists of reinforcing the ground by passive inclusions, closely spaced, to create in-situ a coherent gravity structure and thereby to increase the overall shear strength of the in-situ soil and restrain its displacements.