The Toyota Production System
High Quality and Low Cost
Readings;
James Womack, Daniel T. Jones and Daniel Roos,
The Machine that Changed the World, 1990, Ch 3 and 4
Kenneth N. McKay, “The Evolution of Manufacturing Control-
What Has Been, What Will Be” Working Paper 03 –2001
Michael McCoby, “Is There a Best Way to Build a Car?”
HBR Nov-Dec 1997
COST VS
DEFECTS
Consumer Reports
The toyota production system
Gains of imports
The Toyota Production System
Historical View
Performance measures
Elements of TPS
Difficulties with Implementation
Six Eras of Manufacturing Practice
Three Major Mfg Systems
from 1800 to 2000
1800 1900 2000
Machine tools, specialized machine tools, Taylorism, SPC, CNC, CAD/CAM
Interchangeable
Parts at U.S.
Armories
Mass
Production
at Ford
Toyota
Production
System
Key Elements for New Mfg Systems
Japanese
Banks
Taiichi
Ohno
CNC,
Integration
of Labor
Jobs,
Security
Post WarToyota
Production
System
EarningsHenry
Ford
Moving
Assembly
Line,etc
$5/day
Immigrant
Trans-
portation
Mass
Production
U.S.
Govt
Roswell
Lee/
John
Hall
Machine
Tools,
Division of
Labor
“Yankee
Ingenuity”
MilitaryInterchange-
able Parts
ResourcesLeaderEnabling
Technology
Work
Force
Motivation
Need of
Society
Element/
System
Q. By what method did these
new systems come about?
A. Trial and Error
History of the Development of the Toyota
Production System ref; Taiichi Ohno
1945 1975
The Toyota Production System
Historical View
Performance measures
Elements of TPS
Difficulties with Implementation
Six Eras of Manufacturing Practice
Japanese Japanese in American in All Europe
in Japan North America North America
Performance:
Producvitity (hours/Veh.) 16.8 21.2 25.1 36.2
Quality (assembly
defects/100 vehicles) 60 65 82.3 97
Layout:
Space (sq.ft./vehicle/yr) 5.7 9.1 7.8 7.8
Size of Repair Area (as %
of assembly space) 4.1 4.9 12.9 14.4
Inventories(days for 8
sample parts) 0.2 1.6 2.9 2
Work Force:
% of Work Force in Teams 69.3 71.3 17.3 0.6
Job Rotation (0 = none,
4 = frequent) 3 2.7 0.9 1.9
Suggestions/Employee 61.6 1.4 0.4 0.4
Number of Job Classes 11.9 8.7 67.1 14.8
Training of New Production
Workers (hours) 380.3 370 46.4 173.3
Absenteeism 5 4.8 11.7 12.1
Automation:
Welding (% of direct steps) 86.2 85 76.2 76.6
Painting(% of direct steps) 54.6 40.7 33.6 38.2
Assembly(% of direct steps) 1.7 1.1 1.2 3.1
Source: IMVP World Assembly Plant Survey, 1989, and J. D. Power Initial Quality Survery, 1989
Summary of Assembly Plant Characteristics, Volume Producers,
1989
(Average for Plants in Each Region)
Cost Vs Defects
Ref. “Machine that Changed the World” Womack, Jones and Roos
Cost Vs Automation
Ref. “Machine that Changed the World” Womack, Jones and Roos
The Toyota Production System
Historical View
Performance measures
Elements of TPS
Difficulties with Implementation
Six Eras of Manufacturing Practice
How do you get this kind of
performance?
Womack, Jones and Roos
J T. Black’s 10 Steps
Demand Flow Technology’s 9 Points
Womack Jones and Roos
• New Technology?
– No silver bullet
• Automation?
– Yes, but integrated with system
• Standardized Production?
– Not in the usual “don’t stop the line” sense
• Lean Characteristics?
– Integration of Tasks (opposite of deskilling)
– Identification and removal of defects (stop the line!)
– kaizen – institutionalizing change
J T. Black’s 10 Steps
Ref; JT. Black “Factory with a Future” 1991
1. Form cells
2. Reduce setup
3. Integrate quality control
4. Integrate preventive maintenance
5. Level and balance
6. Link cells – KANBAN
7. Reduce WIP
8. Build vendor programs
9. Automate
10. Computerize
Demand Flow Technology’s
9 Points
1. Product Synchronization
2. Mixed Model Process Maps
3. Sequence of Events
4. Demand at Capacity
5. Operational Cycle Time
6. Total Product Cycle Time
7. Line Balancing
8. Kanbans
9. Operational Method Sheets
Current Value Stream Map
Future Value Stream Map
J T. Black –1, 2
1. Form Cells
Sequential
operations, decouple
operator from
machine, parts in
families, single piece
flow within cell
2. Reduce Setup
Externalize setup to
reduce down-time
during changeover,
increases flexibility
TPS CellToyotaCell,onepartisproduced
foreverytriparoundthecell
J T. Black
Standardized Fixtures
J T. Black – 3, 4
3. Integrate quality
control
Check part quality at
cell, poke-yoke, stop
production when
parts are bad
4. Integrate preventive
maintenance
worker maintains
machine , runs slower
J T. Black – 5, 6
5. Level and balance
Produce to Takt
time, reduce batch
sizes, smooth
production flow
6. Link cells- Kanban
Create “pull” system
– “Supermarket”
System
Balancing and Leveling
• Balanced line: each process has the same
cycle time. Match process time to
assemble time, match production rate to
rate of demand (Takt time)
• Leveled Line: each product is produced in
the needed distribution. The process must
be flexible to do this.
J T. Black – 7, 8
7.Reduce WIP
Make system reliable,
build in mechanisms
to self correct
8. Build Vendor
program
Propagate low WIP
policy to your
vendors, reduce
vendors, make on-
time performance part
of expectation
Some Basics Concepts of TPS
Smooth Flow and Produce to Takt Time
Produce to Order
Make system “observable” and correct
problems as they occur
Integrate Worker Skills
Institutionalize change
Two Examples;
Takt Time
Pull Systems
Takt Time:
demand time interval
DemandProduct
TimeAvailable
TimeTakt =
Calculate Takt Time per month, day,
year etc. Available time includes all
shifts, and excludes all non-
productive time (e.g. lunch, clean-up
etc). Product demand includes over-
production for low yields etc.
Takt Time
Automobile Assembly Line; Available time = 7.5 hr X 3
shifts = 22.5 hrs or 1350 minutes per day. Demand =
1600 cars per day. Takt Time = 51 sec
Aircraft Engine Assembly Line; 500 engines per year.
2 shifts X 7 hrs => 14 hrs/day X 250 day/year = 3500hrs.
Takt time = 7 hrs.
Engines shipped over a 3 month period
at aircraft engine factory “B”
0
2
4
6
8
10
12
7-Jun 15-Jun 23-Jun 30-Jun 7-Jul 15-Jul 24-Jul 31-Jul 7-Aug 15-Aug 24-Aug 31-Aug
Weeks
enginesshippedperweek
month 1 month 2 month 3
Factory “B”
Engines shipped over a 3 month period
at aircraft engine factory “C”
0
1
2
3
4
5
6
7
may june july august
weeks
enginesshipped
Factory “C”
On-time performance of engine
plants
A B C
0%
20%
40%
60%
80%
100%
enginesdelivered
A B C
on
time
late
on
time
on
time
late
Push and Pull Systems
Machines
Parts Orders
1 2 3 4
Push Systems –
Order (from centralized decision process) arrives at the front of the
system and is produced in batches of size “B”.
Q. How long does it take to get one part out of the system?
1 2 3 N
Time = T3
Time = T2
Time = TN
Time = T1
Time = 0
…..
Push Systems –
Time = 0
1 2 3 N
Time
= TN
…..
If the process time per part is “t” at each of
“N” processes, and the batch size is “B”,
it takes time TN = “NBt” to get
one part through the system.
Comment; Of course, this
part can come from inventory
in a much shorter time, but the
point is that the push system
is not very responsive.
Pull Systems-
The order arrives at the end of the line and is “pulled” out of the
system. WIP between the machines allows quick completion.
Q.How long does it take to pull out
one part?
A.The time to finish the last opetration “t”.
Comparison between
Push and Pull Systems
Push system characteristics: Central
decision making, local optimization of
equipment utilization leads to large
batches, large inventories and a sluggish
system.
Pull system characteristics: Local decision
making, emphasis on smooth flow,
cooperative problem solving.
See HP Video
HP Video
Dots Tacks Tape Pack
Inventory in the system = L
Time in the system = W
Little’s Law L = λ W
0.210.120.15
Production Rate
λ = L / W
VisibleVisibleHiddenQuality Problem
31026
Rework Units ≈
WIP
0:191:403:17“Cycle time” = W
41230WIP = L
1 Table2 Tables2 TablesSpace
Pull (1)Pull (3)Push system (6)
HP Video Results
Graphical Interpretation
0
50
100
150
200
250
0 2 4 6
Batch Size "B"
NumberorTime[s]
Inventory, L
Time in System, W
L = λ W
L ≈ k1B
W ≈ k2B
λ = L / W = k1 / k2
So what are the advantages of
the pull systems?
• quick response
• low inventories
• observable problems
(if stopped = problem)
• sensitive to state of the factory
(if no part = problem)
• possible cooperative problem solving
The Toyota Production System
Historical View
Performance measures
Elements of TPS
Difficulties with Implementation
Six Eras of Manufacturing Practice
TPS Implementation
• Physical part (machine placement,
standard work etc)
• Work practices and people issues
• Supply-chain part
• Corporate Strategy (trust, job security)
Work practices and people
issues
• Failed TPS attempts; GM Linden NJ,
CAMI, GM-Suzuki, Ontario Canada.
• Successes GM NUMMI, Saturn. Toyota
Georgetown, KY
• See MacCoby article
• Other Ref: “Just Another Car Factory” Rinehart,
Huxley and Robertson, “Farewell to the Factory”,
Milkman
Work practices and people
issues
• “Innovative” Work Practices Ref; C.
Ichniowski, T. Kochan et al “What
Works at Work: Overview and
Assessment”, Industrial Relations Vol
35 No.3 (July 1996)
Examples of “Innovative” Work
Practices
• Work Teams
• Gain Sharing
• Flexible Job Assignments
• Employment Security
• Improved Communications
“What Works at Work: Overview
and Assessment”,
• Conclusion 1; “Bundling”
Innovative human resource management
practices can improve business productivity,
primarily through the use of systems of related
work practices designed to enhance worker
participation and flexibility in the design of work
and decentralization of managerial tasks and
responsibilities.
“What Works at Work: Overview
and Assessment”,
• Conclusion 2; “Impact”
New Systems of participatory work
practices have large economically
important effects on the performance of
the businesses that adopt the new
practices.
“What Works at Work: Overview
and Assessment”,
• Conclusion 3; “Partial Implementation”
A majority of contemporary U.S. businesses now
have adopted some forms of innovative work practices
aimed at enhancing employee participation such as work
teams, contingent pay-for-performance compensation, or
flexible assignment of multiskilled employees. Only a
small percentage of businesses, however, have adopted
a full system of innovative work practices composed of
an extensive set of these work practice innovations.
“What Works at Work: Overview
and Assessment”,
• Conclusion 4; “Barriers to Implementation”
The diffusion of new workplace innovations is limited,
especially among older U.S. businesses. Firms face a number of
obstacles when changing from a system of traditional work practices
to a system of innovative practices, including: the abandonment of
organization change initiatives after limited policy changes have little
effect on performance, the costs of other organizational practices
that are needed to make new work practices effective, long histories
of labor-management conflict and mistrust, resistance of supervisors
and other workers who might not fare as well under the newer
practices, and the lack of a supportive institutional and public policy
environment.
Barriers to Implementation
• Early abandonment
• Costs (training, commitment, benefits..)
• History of conflict and distrust
• Resistance of supervisors
• Lack of supportive infrastructure
The Toyota Production System
Historical View
Performance measures
Elements of TPS
Difficulties with Implementation
Six Eras of Manufacturing Practice
Six Eras of Manufacturing
Practice, Ken McKay
Pioneering
Systemization
Technology and Process
Internal Efficiency
Customer Service
Systems Level Re-engineering
Ken McKay – 1, 2
1. Pioneering - sellers
market, competition is
not by manufacturing,
large margins
emphasize
throughput not
efficiency
2. Systemization - firm
grows and system gets
complex, gross
inefficiency becomes
apparent, competition
begins to make its
presence felt. Need for
standard operating
procedures, demand still
high, inventory used to
buffer against instabilities.
Ken McKay – 3, 4
• 3. Technology and
Process – competition is
increasing, sales are
softening, manufacturing
is still in early maturity
and competition is limited
to firms in similar
situation. Product options
grow. Mfg focus shifts to
efficiency.
4. Internal Efficiency -
competition “cherry pickers”
enter the market they don’t
offer all of the options and
parts service but focus on the
20% which yields 80% of the
revenue stream. Internal plant
is put into order, problems are
pushed outside to suppliers,
best in class, bench marking
identifies the silver bullet. Still
using inventory to cushion
production support variety, and
maintain functional features.
Ken McKay- 5, 6
5. Customer Service -
talk to the
customer, identify
core competency,
outsource, be
responsive, reduce
lead time, eliminate
feature creep,
focused factory etc.
6. System Level Re-
engineering - firms
have addressed the
internal system and
factory – no more to
squeeze out – look to
improving indirect and
overhead, supply chain
development.
Toyota Summary
• High quality and low cost
• Relationship to previous systems (see
McKay paper), yet new,………. in fact
revolutionary
• Many elements
– Overall, see ”The Machine that Changed the
World”
– Cells, next time
– People, see Maccoby Article
Summary …….. continued
• “Autonomation” automation with a human
touch
• Worker as problem solver
• TRUST

More Related Content

PPT
Toyota Production System
PPTX
The Toyota Way (Toyota Production System) [Operations Management]
PPT
15 lean mfg toyota production system (1)
PDF
Toyota Production System
PPT
The Toyota Production System - A Transition from Mass Production to Lean Manu...
PPTX
BASIC OF TOYOTA PRODUCTION SYSTEM
PPTX
Toyota Production System
PPTX
Toyota Production System 14 Management Principles
Toyota Production System
The Toyota Way (Toyota Production System) [Operations Management]
15 lean mfg toyota production system (1)
Toyota Production System
The Toyota Production System - A Transition from Mass Production to Lean Manu...
BASIC OF TOYOTA PRODUCTION SYSTEM
Toyota Production System
Toyota Production System 14 Management Principles

What's hot (20)

PPT
Lean production-system
PPT
Lean manufacturing and the toyota production system
PPTX
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)
PPT
Toyota Production System
PPTX
Toyota production system
PPTX
JIT case study of Toyota
PPTX
Toyota production system
PPTX
Toyota production system-JIT-Lean Operation
PDF
Introduction to TPS (Toyota Production System)
PPTX
The Toyota Way
PPT
Lean thinking
PPTX
Lean manufacturing
PPT
Tps and lean manufacturing
PPT
Toyota Production System
PPTX
Toyota's jit revolution ppt
PPT
Lean manufacturing
PPTX
Toyota production system
PPTX
Toyota
DOCX
Toyota jit revolution
PPTX
Lean production System - TPS
Lean production-system
Lean manufacturing and the toyota production system
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)
Toyota Production System
Toyota production system
JIT case study of Toyota
Toyota production system
Toyota production system-JIT-Lean Operation
Introduction to TPS (Toyota Production System)
The Toyota Way
Lean thinking
Lean manufacturing
Tps and lean manufacturing
Toyota Production System
Toyota's jit revolution ppt
Lean manufacturing
Toyota production system
Toyota
Toyota jit revolution
Lean production System - TPS
Ad

Viewers also liked (17)

PPT
Toyota production system
PDF
Unraveling Data Sharing Challenges to Improve Collaboration atGlobal Ford Pow...
PDF
Agile Kaizen - Continuous Improvement Far Beyond Retrospectives
PPTX
Supply Chain and Purchasing : Toyota Strategy ?
PPTX
TOYOTA SUPPLY CHAIN MANAGEMENT
PPTX
History of Toyota Production System (TPS)
PDF
Toyota’s Management System Tools and Behaviours
PPT
sistema de producción Toyota TPS
PDF
The Basics of Oobeya by Sharon Tanner and Takashi Tanaka
PDF
Kaizen, Nemawashi and a Project Management Work Cell
PDF
A3 & Kaizen: Here's How
PPT
Toyota Management System by Takashi Tanaka and Sharon Tanner
PPTX
5S, Kaizen, PokaYoke
DOCX
Toyota Supply chain Management
PDF
Toyota strategy
PPTX
Supply Chain Management of TOYOTA.......case study by sabio bernard.
Toyota production system
Unraveling Data Sharing Challenges to Improve Collaboration atGlobal Ford Pow...
Agile Kaizen - Continuous Improvement Far Beyond Retrospectives
Supply Chain and Purchasing : Toyota Strategy ?
TOYOTA SUPPLY CHAIN MANAGEMENT
History of Toyota Production System (TPS)
Toyota’s Management System Tools and Behaviours
sistema de producción Toyota TPS
The Basics of Oobeya by Sharon Tanner and Takashi Tanaka
Kaizen, Nemawashi and a Project Management Work Cell
A3 & Kaizen: Here's How
Toyota Management System by Takashi Tanaka and Sharon Tanner
5S, Kaizen, PokaYoke
Toyota Supply chain Management
Toyota strategy
Supply Chain Management of TOYOTA.......case study by sabio bernard.
Ad

Similar to The toyota production system (20)

PPTX
tpsandleanmanufacturing-130709101251-phpapp01.pptx
PPT
Slide Show Week #9 Chapter 11 Jit
PPT
Tps overview
PPT
Handout tps & lean
PPT
Tps & lean
PPT
JIT.ppt
PPT
Lean, Just-in-time, and Toyota Production System
PPTX
Ppt jit
PDF
K012556370
PDF
K012556370
PPT
Just in-time systems
PPTX
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
PPT
Jit In Toyota
PPTX
Introduction to Standardized Work
PPTX
Introduction to Pull system - November 2016
PPT
JIT6.ppt
PPT
Lean section 2
PPTX
Toyota way
tpsandleanmanufacturing-130709101251-phpapp01.pptx
Slide Show Week #9 Chapter 11 Jit
Tps overview
Handout tps & lean
Tps & lean
JIT.ppt
Lean, Just-in-time, and Toyota Production System
Ppt jit
K012556370
K012556370
Just in-time systems
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Jit In Toyota
Introduction to Standardized Work
Introduction to Pull system - November 2016
JIT6.ppt
Lean section 2
Toyota way

More from Adeel Javaid (19)

PDF
Cybersecurity threat assessment manual
PPT
Hacking web applications
PDF
Electronic voting system security
PDF
Cloud computing security and privacy
PDF
Proposed pricing model for cloud computing
PDF
Wireless sensor networks software architecture
PPT
How hackers attack networks
PDF
What is ph d
PPT
How To Get a Good Job in Academia
PPT
Secrets of success
PPSX
Smartphone healthcare
PPTX
Share point presentation
PPT
Project management
PPT
Business continuity and disaster recovery
PPT
Inside the entreprenurial mind
PPT
Cloud architecture
PDF
Template for marketing strategy
PPT
Channel marketing
PPT
Cloud security
Cybersecurity threat assessment manual
Hacking web applications
Electronic voting system security
Cloud computing security and privacy
Proposed pricing model for cloud computing
Wireless sensor networks software architecture
How hackers attack networks
What is ph d
How To Get a Good Job in Academia
Secrets of success
Smartphone healthcare
Share point presentation
Project management
Business continuity and disaster recovery
Inside the entreprenurial mind
Cloud architecture
Template for marketing strategy
Channel marketing
Cloud security

Recently uploaded (20)

PPTX
2025 Product Deck V1.0.pptxCATALOGTCLCIA
PPT
Chapter four Project-Preparation material
PDF
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
PPT
340036916-American-Literature-Literary-Period-Overview.ppt
PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PPTX
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
PDF
IFRS Notes in your pocket for study all the time
PDF
Module 2 - Modern Supervison Challenges - Student Resource.pdf
PPT
Lecture 3344;;,,(,(((((((((((((((((((((((
DOCX
Business Management - unit 1 and 2
PDF
Solaris Resources Presentation - Corporate August 2025.pdf
PDF
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PPTX
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
PDF
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
PDF
Laughter Yoga Basic Learning Workshop Manual
PDF
NewBase 12 August 2025 Energy News issue - 1812 by Khaled Al Awadi_compresse...
PPTX
3. HISTORICAL PERSPECTIVE UNIIT 3^..pptx
PDF
Digital Marketing & E-commerce Certificate Glossary.pdf.................
PDF
Module 3 - Functions of the Supervisor - Part 1 - Student Resource (1).pdf
2025 Product Deck V1.0.pptxCATALOGTCLCIA
Chapter four Project-Preparation material
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
340036916-American-Literature-Literary-Period-Overview.ppt
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
IFRS Notes in your pocket for study all the time
Module 2 - Modern Supervison Challenges - Student Resource.pdf
Lecture 3344;;,,(,(((((((((((((((((((((((
Business Management - unit 1 and 2
Solaris Resources Presentation - Corporate August 2025.pdf
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
ICG2025_ICG 6th steering committee 30-8-24.pptx
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
Laughter Yoga Basic Learning Workshop Manual
NewBase 12 August 2025 Energy News issue - 1812 by Khaled Al Awadi_compresse...
3. HISTORICAL PERSPECTIVE UNIIT 3^..pptx
Digital Marketing & E-commerce Certificate Glossary.pdf.................
Module 3 - Functions of the Supervisor - Part 1 - Student Resource (1).pdf

The toyota production system

  • 1. The Toyota Production System High Quality and Low Cost Readings; James Womack, Daniel T. Jones and Daniel Roos, The Machine that Changed the World, 1990, Ch 3 and 4 Kenneth N. McKay, “The Evolution of Manufacturing Control- What Has Been, What Will Be” Working Paper 03 –2001 Michael McCoby, “Is There a Best Way to Build a Car?” HBR Nov-Dec 1997 COST VS DEFECTS
  • 5. The Toyota Production System Historical View Performance measures Elements of TPS Difficulties with Implementation Six Eras of Manufacturing Practice
  • 6. Three Major Mfg Systems from 1800 to 2000 1800 1900 2000 Machine tools, specialized machine tools, Taylorism, SPC, CNC, CAD/CAM Interchangeable Parts at U.S. Armories Mass Production at Ford Toyota Production System
  • 7. Key Elements for New Mfg Systems Japanese Banks Taiichi Ohno CNC, Integration of Labor Jobs, Security Post WarToyota Production System EarningsHenry Ford Moving Assembly Line,etc $5/day Immigrant Trans- portation Mass Production U.S. Govt Roswell Lee/ John Hall Machine Tools, Division of Labor “Yankee Ingenuity” MilitaryInterchange- able Parts ResourcesLeaderEnabling Technology Work Force Motivation Need of Society Element/ System
  • 8. Q. By what method did these new systems come about? A. Trial and Error
  • 9. History of the Development of the Toyota Production System ref; Taiichi Ohno 1945 1975
  • 10. The Toyota Production System Historical View Performance measures Elements of TPS Difficulties with Implementation Six Eras of Manufacturing Practice
  • 11. Japanese Japanese in American in All Europe in Japan North America North America Performance: Producvitity (hours/Veh.) 16.8 21.2 25.1 36.2 Quality (assembly defects/100 vehicles) 60 65 82.3 97 Layout: Space (sq.ft./vehicle/yr) 5.7 9.1 7.8 7.8 Size of Repair Area (as % of assembly space) 4.1 4.9 12.9 14.4 Inventories(days for 8 sample parts) 0.2 1.6 2.9 2 Work Force: % of Work Force in Teams 69.3 71.3 17.3 0.6 Job Rotation (0 = none, 4 = frequent) 3 2.7 0.9 1.9 Suggestions/Employee 61.6 1.4 0.4 0.4 Number of Job Classes 11.9 8.7 67.1 14.8 Training of New Production Workers (hours) 380.3 370 46.4 173.3 Absenteeism 5 4.8 11.7 12.1 Automation: Welding (% of direct steps) 86.2 85 76.2 76.6 Painting(% of direct steps) 54.6 40.7 33.6 38.2 Assembly(% of direct steps) 1.7 1.1 1.2 3.1 Source: IMVP World Assembly Plant Survey, 1989, and J. D. Power Initial Quality Survery, 1989 Summary of Assembly Plant Characteristics, Volume Producers, 1989 (Average for Plants in Each Region)
  • 12. Cost Vs Defects Ref. “Machine that Changed the World” Womack, Jones and Roos
  • 13. Cost Vs Automation Ref. “Machine that Changed the World” Womack, Jones and Roos
  • 14. The Toyota Production System Historical View Performance measures Elements of TPS Difficulties with Implementation Six Eras of Manufacturing Practice
  • 15. How do you get this kind of performance? Womack, Jones and Roos J T. Black’s 10 Steps Demand Flow Technology’s 9 Points
  • 16. Womack Jones and Roos • New Technology? – No silver bullet • Automation? – Yes, but integrated with system • Standardized Production? – Not in the usual “don’t stop the line” sense • Lean Characteristics? – Integration of Tasks (opposite of deskilling) – Identification and removal of defects (stop the line!) – kaizen – institutionalizing change
  • 17. J T. Black’s 10 Steps Ref; JT. Black “Factory with a Future” 1991 1. Form cells 2. Reduce setup 3. Integrate quality control 4. Integrate preventive maintenance 5. Level and balance 6. Link cells – KANBAN 7. Reduce WIP 8. Build vendor programs 9. Automate 10. Computerize
  • 18. Demand Flow Technology’s 9 Points 1. Product Synchronization 2. Mixed Model Process Maps 3. Sequence of Events 4. Demand at Capacity 5. Operational Cycle Time 6. Total Product Cycle Time 7. Line Balancing 8. Kanbans 9. Operational Method Sheets
  • 21. J T. Black –1, 2 1. Form Cells Sequential operations, decouple operator from machine, parts in families, single piece flow within cell 2. Reduce Setup Externalize setup to reduce down-time during changeover, increases flexibility
  • 24. J T. Black – 3, 4 3. Integrate quality control Check part quality at cell, poke-yoke, stop production when parts are bad 4. Integrate preventive maintenance worker maintains machine , runs slower
  • 25. J T. Black – 5, 6 5. Level and balance Produce to Takt time, reduce batch sizes, smooth production flow 6. Link cells- Kanban Create “pull” system – “Supermarket” System
  • 26. Balancing and Leveling • Balanced line: each process has the same cycle time. Match process time to assemble time, match production rate to rate of demand (Takt time) • Leveled Line: each product is produced in the needed distribution. The process must be flexible to do this.
  • 27. J T. Black – 7, 8 7.Reduce WIP Make system reliable, build in mechanisms to self correct 8. Build Vendor program Propagate low WIP policy to your vendors, reduce vendors, make on- time performance part of expectation
  • 28. Some Basics Concepts of TPS Smooth Flow and Produce to Takt Time Produce to Order Make system “observable” and correct problems as they occur Integrate Worker Skills Institutionalize change
  • 30. Takt Time: demand time interval DemandProduct TimeAvailable TimeTakt = Calculate Takt Time per month, day, year etc. Available time includes all shifts, and excludes all non- productive time (e.g. lunch, clean-up etc). Product demand includes over- production for low yields etc.
  • 31. Takt Time Automobile Assembly Line; Available time = 7.5 hr X 3 shifts = 22.5 hrs or 1350 minutes per day. Demand = 1600 cars per day. Takt Time = 51 sec Aircraft Engine Assembly Line; 500 engines per year. 2 shifts X 7 hrs => 14 hrs/day X 250 day/year = 3500hrs. Takt time = 7 hrs.
  • 32. Engines shipped over a 3 month period at aircraft engine factory “B” 0 2 4 6 8 10 12 7-Jun 15-Jun 23-Jun 30-Jun 7-Jul 15-Jul 24-Jul 31-Jul 7-Aug 15-Aug 24-Aug 31-Aug Weeks enginesshippedperweek month 1 month 2 month 3 Factory “B”
  • 33. Engines shipped over a 3 month period at aircraft engine factory “C” 0 1 2 3 4 5 6 7 may june july august weeks enginesshipped Factory “C”
  • 34. On-time performance of engine plants A B C 0% 20% 40% 60% 80% 100% enginesdelivered A B C on time late on time on time late
  • 35. Push and Pull Systems Machines Parts Orders 1 2 3 4
  • 36. Push Systems – Order (from centralized decision process) arrives at the front of the system and is produced in batches of size “B”. Q. How long does it take to get one part out of the system? 1 2 3 N Time = T3 Time = T2 Time = TN Time = T1 Time = 0 …..
  • 37. Push Systems – Time = 0 1 2 3 N Time = TN ….. If the process time per part is “t” at each of “N” processes, and the batch size is “B”, it takes time TN = “NBt” to get one part through the system. Comment; Of course, this part can come from inventory in a much shorter time, but the point is that the push system is not very responsive.
  • 38. Pull Systems- The order arrives at the end of the line and is “pulled” out of the system. WIP between the machines allows quick completion. Q.How long does it take to pull out one part? A.The time to finish the last opetration “t”.
  • 39. Comparison between Push and Pull Systems Push system characteristics: Central decision making, local optimization of equipment utilization leads to large batches, large inventories and a sluggish system. Pull system characteristics: Local decision making, emphasis on smooth flow, cooperative problem solving. See HP Video
  • 40. HP Video Dots Tacks Tape Pack Inventory in the system = L Time in the system = W Little’s Law L = λ W
  • 41. 0.210.120.15 Production Rate λ = L / W VisibleVisibleHiddenQuality Problem 31026 Rework Units ≈ WIP 0:191:403:17“Cycle time” = W 41230WIP = L 1 Table2 Tables2 TablesSpace Pull (1)Pull (3)Push system (6) HP Video Results
  • 42. Graphical Interpretation 0 50 100 150 200 250 0 2 4 6 Batch Size "B" NumberorTime[s] Inventory, L Time in System, W L = λ W L ≈ k1B W ≈ k2B λ = L / W = k1 / k2
  • 43. So what are the advantages of the pull systems? • quick response • low inventories • observable problems (if stopped = problem) • sensitive to state of the factory (if no part = problem) • possible cooperative problem solving
  • 44. The Toyota Production System Historical View Performance measures Elements of TPS Difficulties with Implementation Six Eras of Manufacturing Practice
  • 45. TPS Implementation • Physical part (machine placement, standard work etc) • Work practices and people issues • Supply-chain part • Corporate Strategy (trust, job security)
  • 46. Work practices and people issues • Failed TPS attempts; GM Linden NJ, CAMI, GM-Suzuki, Ontario Canada. • Successes GM NUMMI, Saturn. Toyota Georgetown, KY • See MacCoby article • Other Ref: “Just Another Car Factory” Rinehart, Huxley and Robertson, “Farewell to the Factory”, Milkman
  • 47. Work practices and people issues • “Innovative” Work Practices Ref; C. Ichniowski, T. Kochan et al “What Works at Work: Overview and Assessment”, Industrial Relations Vol 35 No.3 (July 1996)
  • 48. Examples of “Innovative” Work Practices • Work Teams • Gain Sharing • Flexible Job Assignments • Employment Security • Improved Communications
  • 49. “What Works at Work: Overview and Assessment”, • Conclusion 1; “Bundling” Innovative human resource management practices can improve business productivity, primarily through the use of systems of related work practices designed to enhance worker participation and flexibility in the design of work and decentralization of managerial tasks and responsibilities.
  • 50. “What Works at Work: Overview and Assessment”, • Conclusion 2; “Impact” New Systems of participatory work practices have large economically important effects on the performance of the businesses that adopt the new practices.
  • 51. “What Works at Work: Overview and Assessment”, • Conclusion 3; “Partial Implementation” A majority of contemporary U.S. businesses now have adopted some forms of innovative work practices aimed at enhancing employee participation such as work teams, contingent pay-for-performance compensation, or flexible assignment of multiskilled employees. Only a small percentage of businesses, however, have adopted a full system of innovative work practices composed of an extensive set of these work practice innovations.
  • 52. “What Works at Work: Overview and Assessment”, • Conclusion 4; “Barriers to Implementation” The diffusion of new workplace innovations is limited, especially among older U.S. businesses. Firms face a number of obstacles when changing from a system of traditional work practices to a system of innovative practices, including: the abandonment of organization change initiatives after limited policy changes have little effect on performance, the costs of other organizational practices that are needed to make new work practices effective, long histories of labor-management conflict and mistrust, resistance of supervisors and other workers who might not fare as well under the newer practices, and the lack of a supportive institutional and public policy environment.
  • 53. Barriers to Implementation • Early abandonment • Costs (training, commitment, benefits..) • History of conflict and distrust • Resistance of supervisors • Lack of supportive infrastructure
  • 54. The Toyota Production System Historical View Performance measures Elements of TPS Difficulties with Implementation Six Eras of Manufacturing Practice
  • 55. Six Eras of Manufacturing Practice, Ken McKay Pioneering Systemization Technology and Process Internal Efficiency Customer Service Systems Level Re-engineering
  • 56. Ken McKay – 1, 2 1. Pioneering - sellers market, competition is not by manufacturing, large margins emphasize throughput not efficiency 2. Systemization - firm grows and system gets complex, gross inefficiency becomes apparent, competition begins to make its presence felt. Need for standard operating procedures, demand still high, inventory used to buffer against instabilities.
  • 57. Ken McKay – 3, 4 • 3. Technology and Process – competition is increasing, sales are softening, manufacturing is still in early maturity and competition is limited to firms in similar situation. Product options grow. Mfg focus shifts to efficiency. 4. Internal Efficiency - competition “cherry pickers” enter the market they don’t offer all of the options and parts service but focus on the 20% which yields 80% of the revenue stream. Internal plant is put into order, problems are pushed outside to suppliers, best in class, bench marking identifies the silver bullet. Still using inventory to cushion production support variety, and maintain functional features.
  • 58. Ken McKay- 5, 6 5. Customer Service - talk to the customer, identify core competency, outsource, be responsive, reduce lead time, eliminate feature creep, focused factory etc. 6. System Level Re- engineering - firms have addressed the internal system and factory – no more to squeeze out – look to improving indirect and overhead, supply chain development.
  • 59. Toyota Summary • High quality and low cost • Relationship to previous systems (see McKay paper), yet new,………. in fact revolutionary • Many elements – Overall, see ”The Machine that Changed the World” – Cells, next time – People, see Maccoby Article
  • 60. Summary …….. continued • “Autonomation” automation with a human touch • Worker as problem solver • TRUST