TIME AND WORK
Work from Days
If A can do a piece of work in n days,
then A's 1 day's work = 1 .
n
• Days from Work:
• If A's 1 day's work = 1 , then A can finish the
n
work in n days.
Ratio
• If A is thrice as good a workman as B, then:
Ratio of work done by A and B = 3 : 1.
Ratio of times taken by A and B to finish a
work = 1 : 3.
Question
• Worker A takes 8 hours to do a job.
Worker B takes 10 hours to do the same
job. How long should it take both A and B,
working together but independently, to do
the same job?
• A. 4 2/9 days
• B. 4 4/9 days
• C. 4 5/9 days
• D. 4 7/9 days
• Answer: Option B
• Explanation:
• A’s 1 hour’s work = 1/8
• B’s 1 hour’s work = 1/10
• (A+B)’s 1 hour’s work = (1/8+1/10) = 9/40
• Both A and B will finish the work in 40/9= 4 4/9
days
Question
• Rohan can do a piece of work in 36 days
but with the help of Mohan he can
complete the work in 24 days. Find the no
of days in which Mohan alone can
complete the work?
• A 80 days
• B 84 days
• C 72 days
• D 74 days
C 72 days
• Total work done by Rohan and
Mohan=L.C.M of 36 & 24= 72 days
• Work rate of Rohan= 72/36=2
• Combine work rate(R+M)=72/24=3
• Work rate of Mohan=3-2=1
• No.of days required by Mohan=72/1
=72 days
Question
• A and B together can complete a piece of
work in 4 days. If A alone can complete
the same work in 12 days, in how many
days can B alone complete that work?
• A. 6 days
• B. 4 days
• C. 8 days
• D. 9 days
• Answer: Option A
• Explanation:
• (A+B)’s 1 day’s work = ¼
• A’s 1 day’s work = 1/12
• B’s 1 day’s work = ¼ - 1/12 = 1/6
• B alone can complete the work in 6 days.
Question
• A and B can do a work in 25 days and 20
days. Both together work for 5 days and
then A leaves off. How many days B take
to finish the remaining work?
• A 16 days
• B 11 days
• C 12 days
• D 14 days
B 11 days
• A can finish work in 25 days & B can finish
the work in 20 days
• Total work done=100(L.C.M of 25&20)
• A’s Contribution=100/25=4
• B’s Contribution =100/20=5
• First we need to calculate 5 days
work=9x5=45
• Remaining work=100-45=55
• B require No.of days=55/5=11 days
Question
• A is twice as good a workman as B and
together they finish a piece of work in 18
days. In how many days will A alone finish
the work?
• A. 27 days
• B. 24 days
• C. 28 days
• D. 29 days
• Answer: Option A
• Explanation:
• (A’s 1 day’s work) : (B’s 1 day’s work) = 2 : 1
• (A+B)’s 1 day’s work = 1/18
• Divide 1/18 in the ratio 2 : 1
• A’s 1 days work = 1/18 x 2/3 = 1/27
• So, A alone can finish the work in 27 days.
Question
• A can finish a work in 24 days. B in 9 days
and C in 12 days. B and C start the work
but are forced to leave after 3 days. The
remaining work was done by A in
• A 9 days
• B 10 days
• C 11 days
• D 12 days
B 10 days
• Total work done= L.C.M of 24,9,8=72
• Work rate of A =72/24=8
• Work rate of B= 72/9=8
• Work rate of C=72/12=6
• In 3 days B & C can complete
work=14x3=42 part
• Remaining work= 72-42=30(A’s Work)
• No of days required by A= 30/3= 10 days
Question
• A and B working separately can do a piece
of work in 9 and 12 days respectively. If
they work for a day alternately, A
beginning, in how many days, the work will
be completed?
• A. 10 ¼ days
• B. 10 ½ days
• C. 8 ¼ days
• D. 8 ½ days
• Answer: Option A
• Explanation:
• (A+B)’s 2 day’s work = 1/9+1/12 = 7/36
• Work done in 5 pairs of days = 5x7/36=35/36
• Remaining work = 1 – 35/36 = 1/36
• On 11th day, it is A’s turn.
• 1/9 work done by him in 1 day.
• 1/36 work done by him in (9x1/36) = ¼ days.
• Total time taken = 10 + ¼ = 10 ¼ days.
Question
• A and B can do a piece of work in 20 days
and 12 days resp. A alone started the
work and then after 4 days B joined him till
the completion of work. How long did the
work last?
• A 10 days
• B 12 days
• C 13 days
• D 11 days
A 10 days
• Total Work Done by A & B =L.C.M OF
20&12 =60
• Work done by A=60/20=3 part
• Work done by B =60/12=5 part
• In 4 days work done= 4x3=12
• Remaining work=60-12=48
• Combine work rate=A+B=3+5=8
• No.of days both A&B work=48/8=6
• Total no.of days work last=6+4=10 days
Question
• 45 men can complete a work in 16 days.
Six days after they started working, 30
more men joined them. How many days
will they now take to complete the
remaining work?
• A. 6 days
• B. 4 days
• C. 8 days
• D. 9 days
• Answer: Option A
• Explanation:
• 45 men can complete the work in 16 days.
• (45x16) men can complete the work in 1 day.
• 1 man’s 1 day’s work = 1/720
• 45 men’s 6 day’s work = 45/720 x 6 = 3/8
• Remaining work = 1 – 3/8 = 5/8
• 75 men’s 1 day’s work = 75/720 = 5/48.
• Now, 5/48 work is done by them in 1 day.
• So, 5/8 work is done by them in 48/5 x 5/8 = 6 days
QUESTION
• IF 5 MEN OR 19 WOMEN CAN DO A
PIECE OF WORK IN 19 DAYS. IN HOW
MANY DAYS CAN 3 MEN AND 6
WOMEN WILL DO THE SAME WORK?
• A 10
• B 15
• C 18
• D 20
B-15 DAYS
• 5M/9W Can do work in 19 days.3M & 6W
=d2(find)
• 5MX 19=(3M+6W)d2
• 1W=5/9M, 6W=5/9X6=10/3M
• 5MX19=(3M+6W)d2
• 5MX19=(3M+10/3M)d2
• 5X19=(3+10/3)d2
• d2= 15 days
Question
• Sachin can do a piece of work in 10 days
while Rahul can do it in 15 days. They
work together for 5 days and the rest work
is done by Virat in 2 days. If they get Rs
4500 for the whole work what is the share
of Virat?
• A 700 Rs
• B 780 Rs
• C 800 Rs
• D 750 Rs
D 750 Rs
• Sachin Work= 10 , Rahul Work=15
• Total work done by both= 30
• Work rate of Sachin= 30/10=3
• Work rate of Rahul=30/15=2
• One day Sachin & Rahul can complete
3+2=5 piece of work
• In 5 days work complete=5(sachin & rahul
work)x 5(no.of days)=25
• S & R: V=25:5=5:1
• Virat Share=4500/6x 1=750 Rs
THANK YOU

More Related Content

PPTX
playing with numbers class 8
HimakshiKava
 
PPSX
Time & work
Veeraragavan Subramaniam
 
PPTX
Simplification (for Competitive exams)
Yamini Kahaliya
 
PPTX
Playing with numbers Class-8
Javed Alam
 
PPT
Quantitative Aptitude
ravikant7883
 
PPTX
Arithmetic progression
Chhavi Bansal
 
PPTX
Arithmatic progression for Class 10 by G R Ahmed
MD. G R Ahmed
 
PPTX
X ch 1 real numbers
AmruthaKB2
 
playing with numbers class 8
HimakshiKava
 
Simplification (for Competitive exams)
Yamini Kahaliya
 
Playing with numbers Class-8
Javed Alam
 
Quantitative Aptitude
ravikant7883
 
Arithmetic progression
Chhavi Bansal
 
Arithmatic progression for Class 10 by G R Ahmed
MD. G R Ahmed
 
X ch 1 real numbers
AmruthaKB2
 

What's hot (20)

PPT
Time and work
Sabith Byari
 
PPSX
Apt maths shortcuts
Veeraragavan Subramaniam
 
PPTX
6th grade math algebra
gwl10925
 
PPTX
Time Speed & Distance basics
Rajesh Singh
 
PPTX
Arithmetic progression
Chhavi Bansal
 
PPSX
Aptitude Age Problems
Sabith Byari
 
PPT
Area & volume
ameermudasar
 
PPT
Multiplication and division
Khairani Rani
 
PPTX
Quantitative Aptitude , Section-Arithmetic , Chapter-Percentages
Nt Arvind
 
PPTX
Maths PPT class 7
Soumya Jain
 
PPTX
Triangles (Similarity)
Mohan Kumar
 
PPT
Fractions to percents
khyps13
 
PPTX
Real Numbers
Kavya Singhal
 
PPTX
Division of decimals
gilbertespinosa2
 
PPTX
Percentage math basics
Mazedul Islam Masud
 
PPTX
Total Surface Area of Prisms
Passy World
 
PPTX
Direction Sense Test Tricks & Shortcuts
Entrance Exam Info
 
PPTX
Integers multiply
summerportal8
 
PPT
Transformations ppt
Neil MacIntosh
 
PPTX
Rotations
julienorman80065
 
Time and work
Sabith Byari
 
Apt maths shortcuts
Veeraragavan Subramaniam
 
6th grade math algebra
gwl10925
 
Time Speed & Distance basics
Rajesh Singh
 
Arithmetic progression
Chhavi Bansal
 
Aptitude Age Problems
Sabith Byari
 
Area & volume
ameermudasar
 
Multiplication and division
Khairani Rani
 
Quantitative Aptitude , Section-Arithmetic , Chapter-Percentages
Nt Arvind
 
Maths PPT class 7
Soumya Jain
 
Triangles (Similarity)
Mohan Kumar
 
Fractions to percents
khyps13
 
Real Numbers
Kavya Singhal
 
Division of decimals
gilbertespinosa2
 
Percentage math basics
Mazedul Islam Masud
 
Total Surface Area of Prisms
Passy World
 
Direction Sense Test Tricks & Shortcuts
Entrance Exam Info
 
Integers multiply
summerportal8
 
Transformations ppt
Neil MacIntosh
 
Rotations
julienorman80065
 
Ad

Similar to Time and work (20)

PDF
Time and work ea #2
Exam Affairs!
 
PDF
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
SOURAV DAS
 
PPT
UNIT 1 PEA306.ppt
Deependra46
 
PDF
3rd time & work new_
priya mega
 
PDF
Doc
Anand Swami
 
PDF
3. Workbook.pdf
Rahul215838
 
PPTX
TIME & WORK.pptx
104SIMANJEETKALIA
 
PDF
Indiabix all math solution - learninghomebd
LearningHomeBD.com
 
PPTX
TIME AND WORK.pptxfkggjshffjggjdgjffhhdg
nareshjhiv8
 
PPTX
Aptitude Lecture 13 (Time and work)-1.pptx
MRUNALSHETHIYA1
 
PPTX
time and work by shiva kumar goud .pptx
goud10
 
PPTX
Aptitude time and work
Maria Yesudass
 
PPTX
Time and work standard level
Veeraragavan Subramaniam
 
PPTX
Numerical reasoning II
Prasanth Kumar RAGUPATHY
 
PDF
C11
BGEsp1
 
DOCX
Time and work questins FOR COMPETATIVE EXAMS
Aradhana Kumari
 
PDF
Time and work Questions Bank Aptitude.pdf
RishabRoy10
 
PDF
Time and work rbi
Sreeram Madhav
 
PPTX
TIME AND WORK.pptxcvcuigjurghi89jhgrrgjig
KashishWalia12
 
PPTX
Time and Work.pptxfgGFYUEGFYRWGFFHGFHGJKFGFYU
yeshwanth845
 
Time and work ea #2
Exam Affairs!
 
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
SOURAV DAS
 
UNIT 1 PEA306.ppt
Deependra46
 
3rd time & work new_
priya mega
 
3. Workbook.pdf
Rahul215838
 
TIME & WORK.pptx
104SIMANJEETKALIA
 
Indiabix all math solution - learninghomebd
LearningHomeBD.com
 
TIME AND WORK.pptxfkggjshffjggjdgjffhhdg
nareshjhiv8
 
Aptitude Lecture 13 (Time and work)-1.pptx
MRUNALSHETHIYA1
 
time and work by shiva kumar goud .pptx
goud10
 
Aptitude time and work
Maria Yesudass
 
Time and work standard level
Veeraragavan Subramaniam
 
Numerical reasoning II
Prasanth Kumar RAGUPATHY
 
C11
BGEsp1
 
Time and work questins FOR COMPETATIVE EXAMS
Aradhana Kumari
 
Time and work Questions Bank Aptitude.pdf
RishabRoy10
 
Time and work rbi
Sreeram Madhav
 
TIME AND WORK.pptxcvcuigjurghi89jhgrrgjig
KashishWalia12
 
Time and Work.pptxfgGFYUEGFYRWGFFHGFHGJKFGFYU
yeshwanth845
 
Ad

Recently uploaded (20)

PPTX
Tags_of_Chaman_Lifestyle Balochistan.pptx
MuhammadAkramKhan9
 
PDF
Upgrade Your Career with HR Management Training in Chandigarh – Wavy Informatics
Wavy Informatics
 
PDF
PowerPoint Presentation -- Larry G -- 2021 -- 218df4ebe0bc5607d6bfcf49fd21eda...
Adeel452922
 
PDF
Fortinet FCSS_LED_AR-7.6 Certification: Study Hacks With Exam Questions
sabrina pinto
 
PDF
Fortinet LAN Edge Architect FCSS_LED_AR-7.6 Certification Study Guide.pdf
sabrina pinto
 
PPTX
introduction to python in detail including .pptx
urvashipundir04
 
PPTX
Black and Green Modern Running Presentation.pptx
Johnjuru
 
PPT
Gas turbine mark VIe control basics tool box description
aliyu4ahmad
 
PDF
Applying Lean Six Sigma in Pre-Sales & Pre-Development: Setting the Stage for...
alekhyamandadi1
 
DOCX
(14-5) Bo-15-De-luyen-thi-vao-10-Ha-Noi-25-26.docx
27QuynNhnChu
 
PPTX
How To Write A ResumeCV - Resume Writing Tips
yeasinArafath6
 
PDF
【2nd】Explanatory material of DTU(230207).pdf
kewalsinghpuriya
 
PPT
Gas turbine mark VIe control Monitoring IO.ppt
aliyu4ahmad
 
PDF
Left Holding the Bag sequence 2 Storyboard by Mark G
MarkGalez
 
PPTX
FIND ODD SHAPE OUT for placement activity.pptx
YESIMSMART
 
PPTX
FARZ ACADEMY MRCP EXAM PREPARATION-GUIDE & TIPS.pptx
dawnmarketingmaveric
 
PPTX
Presentation.pptxjjjnjnnnnnnnnnnnnnnnnnnnn
simajameel01
 
PDF
A Guide To Why Doing Nothing Is Powerful
Lokesh Agrawal
 
PDF
Copy of HKISO FINAL ROUND Session 1 & 2 - S3 and SS.pdf
nothisispatrickduhh
 
PPT
HUUHAA.ppt NHVGDGVBXCDGFBVGCCDJBVGDGHHVXHGVCXX
ssuser0b1c0e
 
Tags_of_Chaman_Lifestyle Balochistan.pptx
MuhammadAkramKhan9
 
Upgrade Your Career with HR Management Training in Chandigarh – Wavy Informatics
Wavy Informatics
 
PowerPoint Presentation -- Larry G -- 2021 -- 218df4ebe0bc5607d6bfcf49fd21eda...
Adeel452922
 
Fortinet FCSS_LED_AR-7.6 Certification: Study Hacks With Exam Questions
sabrina pinto
 
Fortinet LAN Edge Architect FCSS_LED_AR-7.6 Certification Study Guide.pdf
sabrina pinto
 
introduction to python in detail including .pptx
urvashipundir04
 
Black and Green Modern Running Presentation.pptx
Johnjuru
 
Gas turbine mark VIe control basics tool box description
aliyu4ahmad
 
Applying Lean Six Sigma in Pre-Sales & Pre-Development: Setting the Stage for...
alekhyamandadi1
 
(14-5) Bo-15-De-luyen-thi-vao-10-Ha-Noi-25-26.docx
27QuynNhnChu
 
How To Write A ResumeCV - Resume Writing Tips
yeasinArafath6
 
【2nd】Explanatory material of DTU(230207).pdf
kewalsinghpuriya
 
Gas turbine mark VIe control Monitoring IO.ppt
aliyu4ahmad
 
Left Holding the Bag sequence 2 Storyboard by Mark G
MarkGalez
 
FIND ODD SHAPE OUT for placement activity.pptx
YESIMSMART
 
FARZ ACADEMY MRCP EXAM PREPARATION-GUIDE & TIPS.pptx
dawnmarketingmaveric
 
Presentation.pptxjjjnjnnnnnnnnnnnnnnnnnnnn
simajameel01
 
A Guide To Why Doing Nothing Is Powerful
Lokesh Agrawal
 
Copy of HKISO FINAL ROUND Session 1 & 2 - S3 and SS.pdf
nothisispatrickduhh
 
HUUHAA.ppt NHVGDGVBXCDGFBVGCCDJBVGDGHHVXHGVCXX
ssuser0b1c0e
 

Time and work

  • 2. Work from Days If A can do a piece of work in n days, then A's 1 day's work = 1 . n • Days from Work: • If A's 1 day's work = 1 , then A can finish the n work in n days.
  • 3. Ratio • If A is thrice as good a workman as B, then: Ratio of work done by A and B = 3 : 1. Ratio of times taken by A and B to finish a work = 1 : 3.
  • 4. Question • Worker A takes 8 hours to do a job. Worker B takes 10 hours to do the same job. How long should it take both A and B, working together but independently, to do the same job? • A. 4 2/9 days • B. 4 4/9 days • C. 4 5/9 days • D. 4 7/9 days
  • 5. • Answer: Option B • Explanation: • A’s 1 hour’s work = 1/8 • B’s 1 hour’s work = 1/10 • (A+B)’s 1 hour’s work = (1/8+1/10) = 9/40 • Both A and B will finish the work in 40/9= 4 4/9 days
  • 6. Question • Rohan can do a piece of work in 36 days but with the help of Mohan he can complete the work in 24 days. Find the no of days in which Mohan alone can complete the work? • A 80 days • B 84 days • C 72 days • D 74 days
  • 7. C 72 days • Total work done by Rohan and Mohan=L.C.M of 36 & 24= 72 days • Work rate of Rohan= 72/36=2 • Combine work rate(R+M)=72/24=3 • Work rate of Mohan=3-2=1 • No.of days required by Mohan=72/1 =72 days
  • 8. Question • A and B together can complete a piece of work in 4 days. If A alone can complete the same work in 12 days, in how many days can B alone complete that work? • A. 6 days • B. 4 days • C. 8 days • D. 9 days
  • 9. • Answer: Option A • Explanation: • (A+B)’s 1 day’s work = ¼ • A’s 1 day’s work = 1/12 • B’s 1 day’s work = ¼ - 1/12 = 1/6 • B alone can complete the work in 6 days.
  • 10. Question • A and B can do a work in 25 days and 20 days. Both together work for 5 days and then A leaves off. How many days B take to finish the remaining work? • A 16 days • B 11 days • C 12 days • D 14 days
  • 11. B 11 days • A can finish work in 25 days & B can finish the work in 20 days • Total work done=100(L.C.M of 25&20) • A’s Contribution=100/25=4 • B’s Contribution =100/20=5 • First we need to calculate 5 days work=9x5=45 • Remaining work=100-45=55 • B require No.of days=55/5=11 days
  • 12. Question • A is twice as good a workman as B and together they finish a piece of work in 18 days. In how many days will A alone finish the work? • A. 27 days • B. 24 days • C. 28 days • D. 29 days
  • 13. • Answer: Option A • Explanation: • (A’s 1 day’s work) : (B’s 1 day’s work) = 2 : 1 • (A+B)’s 1 day’s work = 1/18 • Divide 1/18 in the ratio 2 : 1 • A’s 1 days work = 1/18 x 2/3 = 1/27 • So, A alone can finish the work in 27 days.
  • 14. Question • A can finish a work in 24 days. B in 9 days and C in 12 days. B and C start the work but are forced to leave after 3 days. The remaining work was done by A in • A 9 days • B 10 days • C 11 days • D 12 days
  • 15. B 10 days • Total work done= L.C.M of 24,9,8=72 • Work rate of A =72/24=8 • Work rate of B= 72/9=8 • Work rate of C=72/12=6 • In 3 days B & C can complete work=14x3=42 part • Remaining work= 72-42=30(A’s Work) • No of days required by A= 30/3= 10 days
  • 16. Question • A and B working separately can do a piece of work in 9 and 12 days respectively. If they work for a day alternately, A beginning, in how many days, the work will be completed? • A. 10 ¼ days • B. 10 ½ days • C. 8 ¼ days • D. 8 ½ days
  • 17. • Answer: Option A • Explanation: • (A+B)’s 2 day’s work = 1/9+1/12 = 7/36 • Work done in 5 pairs of days = 5x7/36=35/36 • Remaining work = 1 – 35/36 = 1/36 • On 11th day, it is A’s turn. • 1/9 work done by him in 1 day. • 1/36 work done by him in (9x1/36) = ¼ days. • Total time taken = 10 + ¼ = 10 ¼ days.
  • 18. Question • A and B can do a piece of work in 20 days and 12 days resp. A alone started the work and then after 4 days B joined him till the completion of work. How long did the work last? • A 10 days • B 12 days • C 13 days • D 11 days
  • 19. A 10 days • Total Work Done by A & B =L.C.M OF 20&12 =60 • Work done by A=60/20=3 part • Work done by B =60/12=5 part • In 4 days work done= 4x3=12 • Remaining work=60-12=48 • Combine work rate=A+B=3+5=8 • No.of days both A&B work=48/8=6 • Total no.of days work last=6+4=10 days
  • 20. Question • 45 men can complete a work in 16 days. Six days after they started working, 30 more men joined them. How many days will they now take to complete the remaining work? • A. 6 days • B. 4 days • C. 8 days • D. 9 days
  • 21. • Answer: Option A • Explanation: • 45 men can complete the work in 16 days. • (45x16) men can complete the work in 1 day. • 1 man’s 1 day’s work = 1/720 • 45 men’s 6 day’s work = 45/720 x 6 = 3/8 • Remaining work = 1 – 3/8 = 5/8 • 75 men’s 1 day’s work = 75/720 = 5/48. • Now, 5/48 work is done by them in 1 day. • So, 5/8 work is done by them in 48/5 x 5/8 = 6 days
  • 22. QUESTION • IF 5 MEN OR 19 WOMEN CAN DO A PIECE OF WORK IN 19 DAYS. IN HOW MANY DAYS CAN 3 MEN AND 6 WOMEN WILL DO THE SAME WORK? • A 10 • B 15 • C 18 • D 20
  • 23. B-15 DAYS • 5M/9W Can do work in 19 days.3M & 6W =d2(find) • 5MX 19=(3M+6W)d2 • 1W=5/9M, 6W=5/9X6=10/3M • 5MX19=(3M+6W)d2 • 5MX19=(3M+10/3M)d2 • 5X19=(3+10/3)d2 • d2= 15 days
  • 24. Question • Sachin can do a piece of work in 10 days while Rahul can do it in 15 days. They work together for 5 days and the rest work is done by Virat in 2 days. If they get Rs 4500 for the whole work what is the share of Virat? • A 700 Rs • B 780 Rs • C 800 Rs • D 750 Rs
  • 25. D 750 Rs • Sachin Work= 10 , Rahul Work=15 • Total work done by both= 30 • Work rate of Sachin= 30/10=3 • Work rate of Rahul=30/15=2 • One day Sachin & Rahul can complete 3+2=5 piece of work • In 5 days work complete=5(sachin & rahul work)x 5(no.of days)=25 • S & R: V=25:5=5:1 • Virat Share=4500/6x 1=750 Rs