Presentation: Trans Adriatic Pipeline (TAP) – The
European leg of the Southern Gas Corridor
Shkelqim Bozgo, Country Manager for Albania, Trans
Adriatic Pipeline (TAP)
TAP – the European Leg of the Southern Gas
Corridor
Shkelqim Bozgo, TAP Country Manager Albania
Albania Oil, Gas & Energy Summit 2015
Tirana, 17 March 2015
Southern Gas Corridor
Paving the Way to Europe’s Energy Security
• Investment of approx. USD 45 bln
• Crossing six countries – 3,500 km
• Nine energy companies involved
3TAP – the European Leg of the Southern Gas Corridor
TAP's key features
• Designed to expand from 10 to 20 bcm/a (plus)
• 870 km in length (105 km offshore)
• 48” onshore, 36” offshore
4
Aligned with EU’s energy policy objectives
TAP – the European Leg of the Southern Gas Corridor
TAP’s shareholders
5
Supported by major energy companies
SOCAR
(20%)
BP
(20%)
Statoil
(20%)
Fluxys
(19%)
Enagás
(16%)
Axpo
(5%)
TAP – the European Leg of the Southern Gas Corridor
TAP will bring supplies of Caspian gas to European markets
TAP will connect to the
Italian natural gas grid to
provide firm capacity at the
Italian virtual trading point
(PSV), from which all Italian
gas exit points can be
reached
Caspian gas can then
ultimately be delivered to:
• Austria
• Germany and France (via
Switzerland)
• N.W EU markets
6TAP – the European Leg of the Southern Gas Corridor
Cooperation in SEE – Facilitating connections in the region
IGB
• IGB is designed to connect Greece
(Komotini) to Bulgaria (Stara Zagora).
• Planned Capacity: up to 3 bcma (option for
capacity increase to 5 bcma)
IAP
• TAP-IAP Joint Working Groups
• Planned Capacity: up to 5 bcma
• Feasibility Study is being developed by
WBIF-COWI-IPF** Consortium.
7
** WBIF/COWI IPF Consortium is the Technical Assistance Contractor contracted by the EU to implement the EU funded Western Balkans Investment Framework (WBIF)
Infrastructure Projects' Facility (IPF)
TAP – the European Leg of the Southern Gas Corridor
TAP in Albania
8TAP – the European Leg of the Southern Gas Corridor
From project planning to implementation
• Access roads: 110km (new and upgraded)
• Bridges: 50 refurbished and 2 new
• 9,000 plots of land
• 8 block valve stations (BVS)
• Crossing 570 roads, 440 rivers & railway (major and
minor crossings)
9TAP – the European Leg of the Southern Gas Corridor
Local engagement
• 7 pillar community investment programme
 Upgrade of 5 social facilities
• 130 meetings (ESIA disclosure)
• 60 meetings in the frame of implementation
processes (LEA disclosure, compensation
values disclosure) attended by over 1,000
participants.
• Around 13,000 individual owner meetings in
the frame of Pre-census & Asset Inventory.
• Business networking event with over 110
local companies (January 2015 – Tirana)
10TAP – the European Leg of the Southern Gas Corridor
Benefits
11
Construction
Direct
benefits
Sourcing
locally
Induced
benefits
Operations
Direct
benefits
Induced
benefits
Taxes Gas exit
capacities
TAP – the European Leg of the Southern Gas Corridor
What’s next for TAP?
12
Schedule to completion
Pipeline construction
2013 2014 2015 2016 2017 2018 2019
Q4 2013
TAP’s Resolution
to Construct
Q4 2013
Shah Deniz 2 Final
Investment
Decision
End 2015
Final Contract
Award
2020
First Gas / TAP
starts operations
Q2 2013
TAP selected
by SDC
TAP – the European Leg of the Southern Gas Corridor
Pre-qualification ongoing
Pre-qualification (PQ) process for interested suppliers checks capability,
capacity and availability of goods and services in the market:
13
Status
• Construction and rehabilitation of
access roads and bridges in Albania
PQ completed, ITT issued April
2014
• Line pipes, casing pipes and bends
(onshore and offshore)
PQ (onshore) launched Dec 2014
PQ (offshore) launched Feb 2015
• Large diameter ball valves PQ complete, ITT issued Dec 2014
• SCADA systems PQ to be launched
• Turbo compressors PQ complete, ITT issued Dec 2014
• Fibre optic cable PQ to be launched
• Onshore pipeline construction PQ complete, ITT issued Oct 2014
• Compressor stations PQ complete, ITT issued Nov 2014
• Offshore pipeline construction PQ launched Feb 2015
• Pipeline receiving terminal (PRT)
and pipeline construction
PQ to be launched
Early works
contracts
Company
Provided
Items (CPI)
Engineering,
Procurement
and
Construction
(EPC)
TAP – the European Leg of the Southern Gas Corridor
LEA (Land Easement & Acquisition) process
14
Transparent, Auditable, Compliant
LEA
preparation
Secure
land access
Audit and
closure
2012 – 2015
– Determine social and environmental
baseline
– Define compensations framework
and methodology
– Disbursement to landowners
2016 – 2019
– Monitoring
– Implement Right of Way
– Compensate for unforeseen damages
2020
– Land restoration
process monitoring
– Audit & Close-out
TAP – the European Leg of the Southern Gas Corridor
Construction & Land
restauration
Key elements for successful construction
15TAP – the European Leg of the Southern Gas Corridor
Reputation
Legacy
ScheduleSafety
Cost
Thank you
www.tap-ag.com

More Related Content

PDF
The revival and transformation of Europe’s largest onshore oilfield; the Pato...
PDF
Overall analysis of the onshore sector of Albania and current developments
PDF
Albania Oil and Gas & Energy 2015 Summit
PDF
Eagle LNG Terminal and Pipeline - Efficient solutions for the Balkans
PDF
How Albanian legislation facilitates the exploration and development of hydro...
PDF
Albpetrol status update in the era of privatisation
PPTX
PPTX
The revival and transformation of Europe’s largest onshore oilfield; the Pato...
Overall analysis of the onshore sector of Albania and current developments
Albania Oil and Gas & Energy 2015 Summit
Eagle LNG Terminal and Pipeline - Efficient solutions for the Balkans
How Albanian legislation facilitates the exploration and development of hydro...
Albpetrol status update in the era of privatisation

What's hot (19)

PPTX
Roschier
PDF
SKKmigas
PPTX
Poten and partners
PDF
20151208 Hydrocarbon training Cyprus - Stakeholders session
PDF
NTG-Oil-Gas-Analysis-FINAL
PDF
Poyry - How can small-scale LNG help grow the European gas market? - Point of...
PDF
Vasilikos master plan 2013 draft report
PPTX
Karachaganak overview WKIF Aktau 25.09.12 Eng Rev-4
PDF
Arb port emission reduction
PPTX
Ppt regulatory overview of shale gas in bc final
PPTX
FLNG - Offshore Assets Development , Korea 2010 Sampe Purba
PAGES
120420 Aph Cv
PPT
Delivering Transformation - Place Making in North Lincolnshire
PPTX
PPT
Department of Public Enterprises presentation on SOEs
PDF
Nusantra regas
PDF
White Rose CCS Project - plenary presentation by Don Reid at the UKCCSRC Card...
PDF
15.10.2018, Παρουσίαση ομιλία Δ. Γόντικα στο workshop του Κύκλου Ιδεών
PDF
Andrea Marroni - Expert Leader - Climate Change, AF - Mercados EMI Europe
Roschier
SKKmigas
Poten and partners
20151208 Hydrocarbon training Cyprus - Stakeholders session
NTG-Oil-Gas-Analysis-FINAL
Poyry - How can small-scale LNG help grow the European gas market? - Point of...
Vasilikos master plan 2013 draft report
Karachaganak overview WKIF Aktau 25.09.12 Eng Rev-4
Arb port emission reduction
Ppt regulatory overview of shale gas in bc final
FLNG - Offshore Assets Development , Korea 2010 Sampe Purba
120420 Aph Cv
Delivering Transformation - Place Making in North Lincolnshire
Department of Public Enterprises presentation on SOEs
Nusantra regas
White Rose CCS Project - plenary presentation by Don Reid at the UKCCSRC Card...
15.10.2018, Παρουσίαση ομιλία Δ. Γόντικα στο workshop του Κύκλου Ιδεών
Andrea Marroni - Expert Leader - Climate Change, AF - Mercados EMI Europe
Ad

Similar to Trans Adriatic Pipeline (TAP) – The European leg of the Southern Gas Corridor (20)

PPT
Natural gas and bio methane as fuel for transport m. seitz
PPT
Blue Corridor NGV Rally 2013 - EU Action on Natural Gas and Biomethane
PPT
Atlantic corridor c. secchi
PDF
hydrogen_trains-slides-v1_compressed.pdf
PPT
Baltic adriatique corridor k. bodewig
PDF
Kari rouhonen
PDF
2023-27 Snam Strategic Plan presentation
PDF
ERRAC and how proposals for Horizon 2020 have been developed - Andy Doherty
PDF
Natural gas and bio methane as fuel for transport r. strods
PDF
Rail Baltica
PPTX
Ocean finance
PDF
Mr. Lluis Tarafa IDOM consulting Investing in Geen Ports Initiatives
PDF
Natural gas and bio methane as fuel for transport h. aouad
PDF
Lyes boudiaf
PDF
ABB EPC_General Presentation_March 15
PDF
The future of H2 economy with the position of H2 in Heavy duty mobility | Spa...
PPT
Sustainable Transport Conference
PDF
Nadi Assaf, TD EUROPE
PDF
Snam 2023-27 Industrial Plan - Financial Presentation
PPTX
An innovation pipeline for hydrogen & fuel cells b. madden
Natural gas and bio methane as fuel for transport m. seitz
Blue Corridor NGV Rally 2013 - EU Action on Natural Gas and Biomethane
Atlantic corridor c. secchi
hydrogen_trains-slides-v1_compressed.pdf
Baltic adriatique corridor k. bodewig
Kari rouhonen
2023-27 Snam Strategic Plan presentation
ERRAC and how proposals for Horizon 2020 have been developed - Andy Doherty
Natural gas and bio methane as fuel for transport r. strods
Rail Baltica
Ocean finance
Mr. Lluis Tarafa IDOM consulting Investing in Geen Ports Initiatives
Natural gas and bio methane as fuel for transport h. aouad
Lyes boudiaf
ABB EPC_General Presentation_March 15
The future of H2 economy with the position of H2 in Heavy duty mobility | Spa...
Sustainable Transport Conference
Nadi Assaf, TD EUROPE
Snam 2023-27 Industrial Plan - Financial Presentation
An innovation pipeline for hydrogen & fuel cells b. madden
Ad

More from Albania Energy Association (20)

PDF
Albania an important energy hub for the Southern Gas Corridor Realistic over...
PDF
Albania investments and Hydropower development 2017
PDF
Impiantet Termoteknike, Ngrohje-Ftohje-HVAC
PDF
The fiscal regime in Albania for upstream oil and gas operations
PDF
vercoming challenges in the exploration of Albania’s high potential carbonate...
DOC
Transporti me litare
DOC
Kerkesa per parkim
DOC
Semaforet (Sinjalet ne infrastrukture)
DOC
Qendrat e perpunimit te mallrave dhe njerzve (pasagjereve)
DOC
Parashikimi per transport
DOC
Si duhet ta shikojme/studjojme rrealisht nje statistike ne fushen e transportit
DOC
Teoria e grafeve
DOC
Transporti Intermodale (shume menyrash)
DOC
Siperfaqet per nje sistem transporti
DOC
Skematizimi i fazave te planifikimit te nje sistem transporti
DOC
Konceptet baze ne perceptimin e nje sistem transporti
DOC
Aurel plasari - ORIENTI APO HIJA NGA OKSIDENTI?
DOC
Avantazhet dhe disavantazhet e hyrjes së Shqipërisë në monedhën euro
DOC
TRANSMETIMI I NXEHTËSISË
DOC
Albania an important energy hub for the Southern Gas Corridor Realistic over...
Albania investments and Hydropower development 2017
Impiantet Termoteknike, Ngrohje-Ftohje-HVAC
The fiscal regime in Albania for upstream oil and gas operations
vercoming challenges in the exploration of Albania’s high potential carbonate...
Transporti me litare
Kerkesa per parkim
Semaforet (Sinjalet ne infrastrukture)
Qendrat e perpunimit te mallrave dhe njerzve (pasagjereve)
Parashikimi per transport
Si duhet ta shikojme/studjojme rrealisht nje statistike ne fushen e transportit
Teoria e grafeve
Transporti Intermodale (shume menyrash)
Siperfaqet per nje sistem transporti
Skematizimi i fazave te planifikimit te nje sistem transporti
Konceptet baze ne perceptimin e nje sistem transporti
Aurel plasari - ORIENTI APO HIJA NGA OKSIDENTI?
Avantazhet dhe disavantazhet e hyrjes së Shqipërisë në monedhën euro
TRANSMETIMI I NXEHTËSISË

Recently uploaded (20)

DOCX
ola and uber project work (Recovered).docx
PDF
The Evolution of Legal Communication through History (www.kiu.ac.ug)
PDF
How to run a consulting project from scratch
DOCX
Handbook of entrepreneurship- Chapter 10 - Feasibility analysis by Subin K Mohan
PDF
the role of manager in strategic alliances
PPTX
Business Research Methods- Secondary Data
PDF
BeMetals_Presentation_September_2025.pdf
PDF
The Influence of Historical Figures on Legal Communication (www.kiu.ac.ug)
PPTX
Hospitality & tourism management.pptxHospitality & tourism management.pptx
PPTX
IndustrialAIGuerillaInnovatorsARCPodcastEp3.pptx
PPTX
PPT Hafizullah Oria- Final Thesis Exam.pptx
PPTX
Enterprises are Classified into Two Categories
PPTX
003 seven PARTS OF SPEECH english subject.pptx
PPTX
Hospitality & tourism management.pptxHospitality & tourism management.pptx
PPTX
Capital Investment in IS Infrastracture and Innovation (SDG9)
PPTX
Accounting Management SystemBatch-4.pptx
PDF
El futuro en e sector empresarial 2024 e
PDF
Investment in CUBA. Basic information for United States businessmen (1957)
PDF
The Future of Marketing: AI, Funnels & MBA Careers | My Annual IIM Lucknow Talk
DOCX
Center Enamel Enabling Precision and Sustainability in the Netherlands' Advan...
ola and uber project work (Recovered).docx
The Evolution of Legal Communication through History (www.kiu.ac.ug)
How to run a consulting project from scratch
Handbook of entrepreneurship- Chapter 10 - Feasibility analysis by Subin K Mohan
the role of manager in strategic alliances
Business Research Methods- Secondary Data
BeMetals_Presentation_September_2025.pdf
The Influence of Historical Figures on Legal Communication (www.kiu.ac.ug)
Hospitality & tourism management.pptxHospitality & tourism management.pptx
IndustrialAIGuerillaInnovatorsARCPodcastEp3.pptx
PPT Hafizullah Oria- Final Thesis Exam.pptx
Enterprises are Classified into Two Categories
003 seven PARTS OF SPEECH english subject.pptx
Hospitality & tourism management.pptxHospitality & tourism management.pptx
Capital Investment in IS Infrastracture and Innovation (SDG9)
Accounting Management SystemBatch-4.pptx
El futuro en e sector empresarial 2024 e
Investment in CUBA. Basic information for United States businessmen (1957)
The Future of Marketing: AI, Funnels & MBA Careers | My Annual IIM Lucknow Talk
Center Enamel Enabling Precision and Sustainability in the Netherlands' Advan...

Trans Adriatic Pipeline (TAP) – The European leg of the Southern Gas Corridor

  • 1. Presentation: Trans Adriatic Pipeline (TAP) – The European leg of the Southern Gas Corridor Shkelqim Bozgo, Country Manager for Albania, Trans Adriatic Pipeline (TAP)
  • 2. TAP – the European Leg of the Southern Gas Corridor Shkelqim Bozgo, TAP Country Manager Albania Albania Oil, Gas & Energy Summit 2015 Tirana, 17 March 2015
  • 3. Southern Gas Corridor Paving the Way to Europe’s Energy Security • Investment of approx. USD 45 bln • Crossing six countries – 3,500 km • Nine energy companies involved 3TAP – the European Leg of the Southern Gas Corridor
  • 4. TAP's key features • Designed to expand from 10 to 20 bcm/a (plus) • 870 km in length (105 km offshore) • 48” onshore, 36” offshore 4 Aligned with EU’s energy policy objectives TAP – the European Leg of the Southern Gas Corridor
  • 5. TAP’s shareholders 5 Supported by major energy companies SOCAR (20%) BP (20%) Statoil (20%) Fluxys (19%) Enagás (16%) Axpo (5%) TAP – the European Leg of the Southern Gas Corridor
  • 6. TAP will bring supplies of Caspian gas to European markets TAP will connect to the Italian natural gas grid to provide firm capacity at the Italian virtual trading point (PSV), from which all Italian gas exit points can be reached Caspian gas can then ultimately be delivered to: • Austria • Germany and France (via Switzerland) • N.W EU markets 6TAP – the European Leg of the Southern Gas Corridor
  • 7. Cooperation in SEE – Facilitating connections in the region IGB • IGB is designed to connect Greece (Komotini) to Bulgaria (Stara Zagora). • Planned Capacity: up to 3 bcma (option for capacity increase to 5 bcma) IAP • TAP-IAP Joint Working Groups • Planned Capacity: up to 5 bcma • Feasibility Study is being developed by WBIF-COWI-IPF** Consortium. 7 ** WBIF/COWI IPF Consortium is the Technical Assistance Contractor contracted by the EU to implement the EU funded Western Balkans Investment Framework (WBIF) Infrastructure Projects' Facility (IPF) TAP – the European Leg of the Southern Gas Corridor
  • 8. TAP in Albania 8TAP – the European Leg of the Southern Gas Corridor
  • 9. From project planning to implementation • Access roads: 110km (new and upgraded) • Bridges: 50 refurbished and 2 new • 9,000 plots of land • 8 block valve stations (BVS) • Crossing 570 roads, 440 rivers & railway (major and minor crossings) 9TAP – the European Leg of the Southern Gas Corridor
  • 10. Local engagement • 7 pillar community investment programme  Upgrade of 5 social facilities • 130 meetings (ESIA disclosure) • 60 meetings in the frame of implementation processes (LEA disclosure, compensation values disclosure) attended by over 1,000 participants. • Around 13,000 individual owner meetings in the frame of Pre-census & Asset Inventory. • Business networking event with over 110 local companies (January 2015 – Tirana) 10TAP – the European Leg of the Southern Gas Corridor
  • 12. What’s next for TAP? 12 Schedule to completion Pipeline construction 2013 2014 2015 2016 2017 2018 2019 Q4 2013 TAP’s Resolution to Construct Q4 2013 Shah Deniz 2 Final Investment Decision End 2015 Final Contract Award 2020 First Gas / TAP starts operations Q2 2013 TAP selected by SDC TAP – the European Leg of the Southern Gas Corridor
  • 13. Pre-qualification ongoing Pre-qualification (PQ) process for interested suppliers checks capability, capacity and availability of goods and services in the market: 13 Status • Construction and rehabilitation of access roads and bridges in Albania PQ completed, ITT issued April 2014 • Line pipes, casing pipes and bends (onshore and offshore) PQ (onshore) launched Dec 2014 PQ (offshore) launched Feb 2015 • Large diameter ball valves PQ complete, ITT issued Dec 2014 • SCADA systems PQ to be launched • Turbo compressors PQ complete, ITT issued Dec 2014 • Fibre optic cable PQ to be launched • Onshore pipeline construction PQ complete, ITT issued Oct 2014 • Compressor stations PQ complete, ITT issued Nov 2014 • Offshore pipeline construction PQ launched Feb 2015 • Pipeline receiving terminal (PRT) and pipeline construction PQ to be launched Early works contracts Company Provided Items (CPI) Engineering, Procurement and Construction (EPC) TAP – the European Leg of the Southern Gas Corridor
  • 14. LEA (Land Easement & Acquisition) process 14 Transparent, Auditable, Compliant LEA preparation Secure land access Audit and closure 2012 – 2015 – Determine social and environmental baseline – Define compensations framework and methodology – Disbursement to landowners 2016 – 2019 – Monitoring – Implement Right of Way – Compensate for unforeseen damages 2020 – Land restoration process monitoring – Audit & Close-out TAP – the European Leg of the Southern Gas Corridor Construction & Land restauration
  • 15. Key elements for successful construction 15TAP – the European Leg of the Southern Gas Corridor Reputation Legacy ScheduleSafety Cost