SlideShare a Scribd company logo
TRANSNET
PAGEPAGE
1. Transnet - Who we are
TABLE OF CONTENTS
1
2. Port complimentary system
3. Market Demand Strategy
4. Port infrastructure development
4. Future Plans
PAGEPAGE
• 16 Cargo
Terminals
operating across
7 SA ports
• Revenue 7 bn
• Assets R12.3 bn
• 6 210 employees
Supporting
2
• 7 Commercial
ports along
2 943km of
coastline
• Revenue R8.4bn
• Assets R60.6 bn
• 3 420 employees
• 20 500 km of
railway track
• 182 million tons of
freight
• General freight & 2
heavy haul export
lines
• Revenue 27.6 bn
• Assets R61.3 bn
• 26 850 employees
• Support TFR for
rolling stock and
TPT for lifting
equipment
maintenance
• Revenue 11.2 bn
• Assets R7.6 bn
• 12 570 employees
• 18 billion litres of
petroleum
products and gas
through 3 000
km of pipelines,
mainly to
Gauteng
• Revenue 2.1 bn
• Assets R19.3 bn
• 630 employees
• R300 billion of
capital
investments over
7 years
• CSI in Education,
Health, Sport,
Arts &
Agriculture
• Property
Management
• Transnet Schools
Capital
Projects
Transnet
Foundation
Property
Schools
Transnet
Pipelines
(TPL)
Transnet
Engineering
(TE)
Transnet
Freight Rail
(TFR)
Transnet
Port
Terminals
(TPT)
Transnet
National
Ports
Authority
(TNPA)
PipelinesRailPorts
Transnet – Who we are
PAGEPAGE
Complimentary port system
7. Saldanha
Bulk (Export iron ore),
Breakbulk
6. Cape Town
Containers,
Breakbulk
4. Ngqura
Containers
3. East London
Containers, Breakbulk,
Agri-Bulk, Automotives
1. Richards Bay
Bulk (Export coal,
magnetite, Chrome)
Breakbulk
2. Durban
Containers, Breakbulk,
Agri-Bulk, Automotives
5. Port Elizabeth
Containers, Breakbulk,
Bulk, AutomotivesWESTERN CAPE PORTS
EASTERN CAPE PORTS
KZN PORTS
3
Cargo handled in 2013/14
4.5 Million Containers
77.1 Million Tons of Bulk Cargo
11.2 Million Tons of Break-Bulk
0.7 Million New Automotive Vehicles
PAGEPAGE 4Source: Africa Team analysis
TRANSNET’S Market Demand Strategy 2014 to 2020
• R300bn Transnet-wide capital investment programme
over next 7-years
• Expanding rail, port and pipeline infrastructure
• Increase in capacity to meet market demand
• Continued financial stability and strength
• Significant productivity and operational efficiency
improvements
• Shift from road to rail – reducing the cost of doing
business and carbon emissions
• Enabling economic growth
• Job creation, skills development, localisation,
empowerment and transformation opportunities
• R77bn will be invested in ports
Divisional split (Rbn)
11
30
47
4
201
4
Other
TPL
TPT
TNPA
TRE
TFR
Other
Commodity Split (Rbn)
30
26
39
24
25
32
151
OtherBulk
Break Bulk
Piped Products
Containers (Ports)
Export Iron Ore
Export Coal
GFB
PAGEPAGE 5Source: Africa Team analysis
Civil / Infrastructure vs
Cargo Handling Equipment
TPT 7-year Capex Programme (R30bn):
TPT Year 1 (2013/14) Forecasted spend (R 1,859m):
Infra vs. Equipment, Port View, Replacement vs. Expansion
Cargo Handling
Equipment
R 1,369m (74%)
Civil /
Infrastructure
R 489m (26%)
RBY
R 550m
(30%)
DBN
R 513m
(28%)
NGQURA
R 528m
(28%)
SLD
R 116m
(6%)
CTN
R 106m
(6%)
PE / EL
R 45m
(2%)
Port View
Replacement vs. Expansion
Total ETC
7 Year Plan
Year 1
2013/14
Year 2
2014/15
Year 3
2015/16
Year 4
2016/17
Year 5
2017/18
Year 6
2018/19
Year 7
2019/20
TPT 29 677 1 859 2 827 4 772 5 496 5 247 5 241 4 235
Rbn
Expansion
R 789m
(43%)
Replacement
R 1,069m
(57%)
Port Terminals infrastructure development
PAGEPAGE
Investment climbed from R131m in 2001/02 peaking at R3.2bn in 2008/09
TPT Investment (R2,363m)
(5 years: 2001/02 to 2005/06)
TPT Investment (R10,277m)
(5 years: 2006/07 to 2010/11)
2004/052003/042002/032001/02 2005/06 2009/102008/092007/082006/07 2010/11
Port concessioning
dilemma
Infrastructure backlog catchup
& expansion drive
Global recession
& investment
cutbacks
6
7
2012/132011/122010/112008/09 2013/14 2017/182016/172015/162014/15 2018/19
3200 2337 913 1137 2551 1859 3492
7670
9545
2812 2670
2009/10
Boom-
time
Ends
Global recession
Market Demand Strategy
TPT R30bn 7yr Investment Plan
Transnet Port Terminals 10 capex history
PAGE
• The Port of Durban is undergoing a multi-year project to ramp up of capacity ahead of
projected demand.
• Planned extension of the Pier 1 terminal into Salisbury Island will increase current
capacity from 700,000 TEUs to a potential 1.3-million TEUs by 2016.
• Pier 2 capacity is to be increased from 2.1 million TEUs in 2011/12 to 2.5 million TEUs
by 2013/14 and 3.3 million TEUs by 2017/18.
• Berths 203, 204 and 205 on DCT’s North Quay is currently being taken out of service
one at a time to undergo deepening and refurbishment over a 74 month period which
started in June 2012.
• Container capacity is also being created in other niche terminals such as the Durban
RO-RO and Maydon Wharf Terminal (a predominantly break-bulk and RORO
facility, with specialised capacity to handle containers), through the acquisition of new
equipment, such as mobile cranes, and various infrastructure upgrades to deal with the
container traffic diverted from DCT during the capacity upgrade.
7
Future Plans
PAGEPAGE
Port of Durban
Isipingo
Sapref Refinery
Old Durban Airport
Toyota
Factory
N2 Freeway
Mondi
Umlazi
8
PORT OF NGQURA
DURBAN MPT TERMINALS – POINT RORO
DURBAN DIG-OUT PORT
- Ex Durban International Airport (DIA) Site
PAGEPAGE
Current Port of Durban
Container Terminals
New Dig-Out Port
Automotive Terminal
Liquid Bulk Terminal
Breakwater and Entrance Channel
9
PORT OF NGQURA
DURBAN MPT TERMINALS – POINT RORO
DURBAN DIG-OUT PORT
- artist’s impression
PAGEPAGE
Concluding remarks
10
• Future freight transport demand in
Africa is tied to growth in international
trade.
• As ports would be increasingly
challenged by intensified traffic,
greater ship size and transhipment
growth, ports capacity may have to
be expanded in the future.
• Ultimately, all countries can benefit
from a fully developed transport
infrastructure in Africa.
• Greater collaboration will be key in
optimising the entire logistics supply
chain.
• Infrastructure development is one of
the key drivers of the New Growth
Path, Transnet has an important role
to play in this new journey.
PAGE
20 THANK YOU

More Related Content

PDF
Transnet freight rail corridor development programme and road to rail strategy
PPTX
Marine Transportation
PPTX
Port of Dubai
PPSX
Port operations & management slideshow
PPTX
Innovations in Public Transportation
PPTX
Multi-modal and Inter-modal transportation planning
PPT
Sustainable Transportation 2003
Transnet freight rail corridor development programme and road to rail strategy
Marine Transportation
Port of Dubai
Port operations & management slideshow
Innovations in Public Transportation
Multi-modal and Inter-modal transportation planning
Sustainable Transportation 2003

What's hot (6)

PPTX
Shipping trade types tramp and liner shipping
PPTX
port of Hong kong
PDF
propulsion engineering-02-resistance of ships
PPTX
Session 2.1 - Integrated Transport
PPTX
Docks and their classification
PPTX
Types of ships
Shipping trade types tramp and liner shipping
port of Hong kong
propulsion engineering-02-resistance of ships
Session 2.1 - Integrated Transport
Docks and their classification
Types of ships
Ad

Viewers also liked (13)

PDF
Eastern Cape Maritime Summit Oct 2016
PDF
Transnet Annual Results Presentation March 2016
PDF
PDF
Procurement Opportunities 2016 Imbizo held at Eastern Cape
PDF
Our Business Engages Stakeholders
PDF
Optimisation vs. Automation in South African Ports
PDF
How to Select a Solution for Sea Port or Terminal Automation
PDF
Transnet port terminals on stay ahead of the competition, presented during af...
PPT
Maritime Challenges (SIngapore)
PPT
My_Presentation_2010
PPTX
Port of Singapore Final !!
PDF
Transnet and TPT overview 12 Sept 2016
Eastern Cape Maritime Summit Oct 2016
Transnet Annual Results Presentation March 2016
Procurement Opportunities 2016 Imbizo held at Eastern Cape
Our Business Engages Stakeholders
Optimisation vs. Automation in South African Ports
How to Select a Solution for Sea Port or Terminal Automation
Transnet port terminals on stay ahead of the competition, presented during af...
Maritime Challenges (SIngapore)
My_Presentation_2010
Port of Singapore Final !!
Transnet and TPT overview 12 Sept 2016
Ad

Similar to Transnet who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa (20)

PDF
African seaports expansion summit
PDF
Readying our ports for an onslaught of trade
PDF
The role of TPT in the export led growth strategy- Eastern Cape Region
PPTX
Aees summit 2014 transnet port terminals on africa
PPTX
Sri Lanka - The hub of South Asia
PDF
Terminal operation hub Ngqura and spoke model
PPTX
Chetty 5f
PDF
The expansion of Saldanha Port to meet nternational growing iron ore demand
PPTX
Mervin chetty transnet sa
PDF
Drc delegation visit
PDF
South africa’s ports system & position, enables it to access to south south t...
PDF
Session 11 – site visits port of maputo
PDF
Overview of transnet port terminals
PDF
South African Port Trends and Current Developments
PPTX
Trade and Investment Forum
PPT
Competitiveness Of Indian Ports
PPTX
Prospect of deep sea port fostering national development of bangladesh
PDF
Saldanha Bay industrial Development Zone
PPTX
Study of port performance in india
PPT
Roll On-Roll Off service
African seaports expansion summit
Readying our ports for an onslaught of trade
The role of TPT in the export led growth strategy- Eastern Cape Region
Aees summit 2014 transnet port terminals on africa
Sri Lanka - The hub of South Asia
Terminal operation hub Ngqura and spoke model
Chetty 5f
The expansion of Saldanha Port to meet nternational growing iron ore demand
Mervin chetty transnet sa
Drc delegation visit
South africa’s ports system & position, enables it to access to south south t...
Session 11 – site visits port of maputo
Overview of transnet port terminals
South African Port Trends and Current Developments
Trade and Investment Forum
Competitiveness Of Indian Ports
Prospect of deep sea port fostering national development of bangladesh
Saldanha Bay industrial Development Zone
Study of port performance in india
Roll On-Roll Off service

More from Transnet Port Terminals (17)

PDF
Transnet Port Terminals, IMO, SOLAS VGM workshop by M Brooke
PDF
Transnet Port Terminals SOLAS frequently asked questions
PDF
Business overview and opportunities at the Ports
PDF
Tpt's tendering process at a glance
PDF
Tpt's supplier development (sd) initiative outline
PDF
Tpt's bid specification considerations
PDF
As a supplier, know tpt's governance
PDF
Customer commitment brochure 2015 (10)
PDF
Transnet annual results 2015
PDF
Transnet enterprise development hub Saldanha - 2015
PDF
Transnet anti bullying talk guide 2015
PDF
Saudi arabia railway organisation visit to transnet iron ore line saldanha
PDF
Richards bay port terminal business overview
PDF
Indicators and innovations to improve efficiency at ports
PDF
Excellence showcased at tpt
PDF
Transnet port terminals careers brochure
PDF
Container Strategy, benchmarking and viability Ngqura Container Terminal
Transnet Port Terminals, IMO, SOLAS VGM workshop by M Brooke
Transnet Port Terminals SOLAS frequently asked questions
Business overview and opportunities at the Ports
Tpt's tendering process at a glance
Tpt's supplier development (sd) initiative outline
Tpt's bid specification considerations
As a supplier, know tpt's governance
Customer commitment brochure 2015 (10)
Transnet annual results 2015
Transnet enterprise development hub Saldanha - 2015
Transnet anti bullying talk guide 2015
Saudi arabia railway organisation visit to transnet iron ore line saldanha
Richards bay port terminal business overview
Indicators and innovations to improve efficiency at ports
Excellence showcased at tpt
Transnet port terminals careers brochure
Container Strategy, benchmarking and viability Ngqura Container Terminal

Recently uploaded (20)

PDF
Unit 1 Cost Accounting - Cost sheet
PDF
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PPTX
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PPTX
Principles of Marketing, Industrial, Consumers,
PPT
Chapter four Project-Preparation material
PDF
COST SHEET- Tender and Quotation unit 2.pdf
PDF
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
DOCX
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
PDF
DOC-20250806-WA0002._20250806_112011_0000.pdf
PPTX
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
PDF
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
PDF
Roadmap Map-digital Banking feature MB,IB,AB
PPTX
Amazon (Business Studies) management studies
PDF
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
PDF
How to Get Business Funding for Small Business Fast
PPTX
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
PDF
Chapter 5_Foreign Exchange Market in .pdf
PPTX
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
Unit 1 Cost Accounting - Cost sheet
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
Principles of Marketing, Industrial, Consumers,
Chapter four Project-Preparation material
COST SHEET- Tender and Quotation unit 2.pdf
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
DOC-20250806-WA0002._20250806_112011_0000.pdf
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
Roadmap Map-digital Banking feature MB,IB,AB
Amazon (Business Studies) management studies
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
How to Get Business Funding for Small Business Fast
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
Chapter 5_Foreign Exchange Market in .pdf
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh

Transnet who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa

  • 2. PAGEPAGE 1. Transnet - Who we are TABLE OF CONTENTS 1 2. Port complimentary system 3. Market Demand Strategy 4. Port infrastructure development 4. Future Plans
  • 3. PAGEPAGE • 16 Cargo Terminals operating across 7 SA ports • Revenue 7 bn • Assets R12.3 bn • 6 210 employees Supporting 2 • 7 Commercial ports along 2 943km of coastline • Revenue R8.4bn • Assets R60.6 bn • 3 420 employees • 20 500 km of railway track • 182 million tons of freight • General freight & 2 heavy haul export lines • Revenue 27.6 bn • Assets R61.3 bn • 26 850 employees • Support TFR for rolling stock and TPT for lifting equipment maintenance • Revenue 11.2 bn • Assets R7.6 bn • 12 570 employees • 18 billion litres of petroleum products and gas through 3 000 km of pipelines, mainly to Gauteng • Revenue 2.1 bn • Assets R19.3 bn • 630 employees • R300 billion of capital investments over 7 years • CSI in Education, Health, Sport, Arts & Agriculture • Property Management • Transnet Schools Capital Projects Transnet Foundation Property Schools Transnet Pipelines (TPL) Transnet Engineering (TE) Transnet Freight Rail (TFR) Transnet Port Terminals (TPT) Transnet National Ports Authority (TNPA) PipelinesRailPorts Transnet – Who we are
  • 4. PAGEPAGE Complimentary port system 7. Saldanha Bulk (Export iron ore), Breakbulk 6. Cape Town Containers, Breakbulk 4. Ngqura Containers 3. East London Containers, Breakbulk, Agri-Bulk, Automotives 1. Richards Bay Bulk (Export coal, magnetite, Chrome) Breakbulk 2. Durban Containers, Breakbulk, Agri-Bulk, Automotives 5. Port Elizabeth Containers, Breakbulk, Bulk, AutomotivesWESTERN CAPE PORTS EASTERN CAPE PORTS KZN PORTS 3 Cargo handled in 2013/14 4.5 Million Containers 77.1 Million Tons of Bulk Cargo 11.2 Million Tons of Break-Bulk 0.7 Million New Automotive Vehicles
  • 5. PAGEPAGE 4Source: Africa Team analysis TRANSNET’S Market Demand Strategy 2014 to 2020 • R300bn Transnet-wide capital investment programme over next 7-years • Expanding rail, port and pipeline infrastructure • Increase in capacity to meet market demand • Continued financial stability and strength • Significant productivity and operational efficiency improvements • Shift from road to rail – reducing the cost of doing business and carbon emissions • Enabling economic growth • Job creation, skills development, localisation, empowerment and transformation opportunities • R77bn will be invested in ports Divisional split (Rbn) 11 30 47 4 201 4 Other TPL TPT TNPA TRE TFR Other Commodity Split (Rbn) 30 26 39 24 25 32 151 OtherBulk Break Bulk Piped Products Containers (Ports) Export Iron Ore Export Coal GFB
  • 6. PAGEPAGE 5Source: Africa Team analysis Civil / Infrastructure vs Cargo Handling Equipment TPT 7-year Capex Programme (R30bn): TPT Year 1 (2013/14) Forecasted spend (R 1,859m): Infra vs. Equipment, Port View, Replacement vs. Expansion Cargo Handling Equipment R 1,369m (74%) Civil / Infrastructure R 489m (26%) RBY R 550m (30%) DBN R 513m (28%) NGQURA R 528m (28%) SLD R 116m (6%) CTN R 106m (6%) PE / EL R 45m (2%) Port View Replacement vs. Expansion Total ETC 7 Year Plan Year 1 2013/14 Year 2 2014/15 Year 3 2015/16 Year 4 2016/17 Year 5 2017/18 Year 6 2018/19 Year 7 2019/20 TPT 29 677 1 859 2 827 4 772 5 496 5 247 5 241 4 235 Rbn Expansion R 789m (43%) Replacement R 1,069m (57%) Port Terminals infrastructure development
  • 7. PAGEPAGE Investment climbed from R131m in 2001/02 peaking at R3.2bn in 2008/09 TPT Investment (R2,363m) (5 years: 2001/02 to 2005/06) TPT Investment (R10,277m) (5 years: 2006/07 to 2010/11) 2004/052003/042002/032001/02 2005/06 2009/102008/092007/082006/07 2010/11 Port concessioning dilemma Infrastructure backlog catchup & expansion drive Global recession & investment cutbacks 6 7 2012/132011/122010/112008/09 2013/14 2017/182016/172015/162014/15 2018/19 3200 2337 913 1137 2551 1859 3492 7670 9545 2812 2670 2009/10 Boom- time Ends Global recession Market Demand Strategy TPT R30bn 7yr Investment Plan Transnet Port Terminals 10 capex history
  • 8. PAGE • The Port of Durban is undergoing a multi-year project to ramp up of capacity ahead of projected demand. • Planned extension of the Pier 1 terminal into Salisbury Island will increase current capacity from 700,000 TEUs to a potential 1.3-million TEUs by 2016. • Pier 2 capacity is to be increased from 2.1 million TEUs in 2011/12 to 2.5 million TEUs by 2013/14 and 3.3 million TEUs by 2017/18. • Berths 203, 204 and 205 on DCT’s North Quay is currently being taken out of service one at a time to undergo deepening and refurbishment over a 74 month period which started in June 2012. • Container capacity is also being created in other niche terminals such as the Durban RO-RO and Maydon Wharf Terminal (a predominantly break-bulk and RORO facility, with specialised capacity to handle containers), through the acquisition of new equipment, such as mobile cranes, and various infrastructure upgrades to deal with the container traffic diverted from DCT during the capacity upgrade. 7 Future Plans
  • 9. PAGEPAGE Port of Durban Isipingo Sapref Refinery Old Durban Airport Toyota Factory N2 Freeway Mondi Umlazi 8 PORT OF NGQURA DURBAN MPT TERMINALS – POINT RORO DURBAN DIG-OUT PORT - Ex Durban International Airport (DIA) Site
  • 10. PAGEPAGE Current Port of Durban Container Terminals New Dig-Out Port Automotive Terminal Liquid Bulk Terminal Breakwater and Entrance Channel 9 PORT OF NGQURA DURBAN MPT TERMINALS – POINT RORO DURBAN DIG-OUT PORT - artist’s impression
  • 11. PAGEPAGE Concluding remarks 10 • Future freight transport demand in Africa is tied to growth in international trade. • As ports would be increasingly challenged by intensified traffic, greater ship size and transhipment growth, ports capacity may have to be expanded in the future. • Ultimately, all countries can benefit from a fully developed transport infrastructure in Africa. • Greater collaboration will be key in optimising the entire logistics supply chain. • Infrastructure development is one of the key drivers of the New Growth Path, Transnet has an important role to play in this new journey.