What is Travel chart?
• The chart which gives an estimate about the amount
of materials handling between various work stations
is known as “Travel chart”.
• The aim of travel chart is to decide such layout where
overall materials handling function is performed at
minimum cost.
• Movement of workers, material & equipment at any
time and any workstation is shown numerically by
two way matrix.
• Travel chart is square tabular where each column and
row represents single work station.
• Construction of travel chart depends on the “from-to”
chart. Once the frequency & distance travelled between
workstations is meaured, the total distance travelled is
placed in terms of each distance travelled.
• According to that change the layout design of the plant
with the aim to reduce the total distance travelled.
• As shown in the diagram, here travelling from one
station to other is represented as ‘X’.
• So there is high work load on the station no.4, almost
from all department.
• So, if the layout is changed in a such reducing the travel
distance, then it is possible to reduce travelling cost as
well as travelling time
travel chart for plant layout
Example:-
• Assume that a plant engaged in manufacture
often types of products. the sequence,
weight and quantity per of the year of each
type of products are given in table. there are
nine buildings in the plant. Each building
should be center of one operation only.
Solution:-
travel chart for plant layout
PROCEDURE:-
• Let the nine building be symbolized as A,B,C,D,E,F,G,H and I. all these
building are already constructed, so inter-building distance are fixed. Each
building will be a shop for one type of operation only, say for example if we
decide to make building as center of drilling them only drilling machines will
be housed there.
• The objective is to minimize the quantity ,weight x distance ,i.e number of
products x weight-of each product x total distance moved by each for all
operation-on it should be minimized. on careful study we noticed that.
 Number of products of each variety is fixed
 Weight of each product is fixed ,therefore to reduce the overall we should
try to reduce the overall distance only.
• Assume that raw material store will be in building A,B will be pattern shop
,c will be foundry shop and so on, is table C. it is an initial tentative layout.
travel chart for plant layout
travel chart for plant layout
travel chart for plant layout
travel chart for plant layout
travel chart for plant layout
• Calculate the number of products x distance for
each of the two variteis I and VIII
• For I, 5000 × 30 × 8 = 15000Kg.m
• For VIII, 1500 × 0.4 × 30 = 18000Kg.m
• The overall total= 72.31 × 10 5
Thank you

More Related Content

PDF
Project.pdf
singhkuldeep17688
 
PDF
KNIME Software Overview
KNIMESlides
 
PPTX
Final hospital planning and layout ppt
Sandeep Singh
 
PPTX
Quality control and inspection
Samiksha Sawant
 
PPT
Discrete Probability Distributions
mandalina landy
 
PPTX
Anti lock braking system
Akash Singh
 
PPTX
INTRODUCTION TO ENGINEERING MECHANICS - SPP.pptx
Dharmsinh Desai of University
 
PDF
VDA 6.3 Training Material From VDiversify.com | VDA 6.3 Process Audit Trainin...
VDiversify
 
Project.pdf
singhkuldeep17688
 
KNIME Software Overview
KNIMESlides
 
Final hospital planning and layout ppt
Sandeep Singh
 
Quality control and inspection
Samiksha Sawant
 
Discrete Probability Distributions
mandalina landy
 
Anti lock braking system
Akash Singh
 
INTRODUCTION TO ENGINEERING MECHANICS - SPP.pptx
Dharmsinh Desai of University
 
VDA 6.3 Training Material From VDiversify.com | VDA 6.3 Process Audit Trainin...
VDiversify
 

What's hot (20)

PPT
Process Planning
Guhan M
 
PPT
introduction to process planning murugananthan
Murugananthan K
 
PPT
Concurrent engineering
paragmahajan01
 
PPTX
Work study
Dharam Ranka.Rvd
 
PPTX
Unit ii Process Planning
Asha A
 
PPTX
Flexible manufacturing system(FMS).
Nitin Patil
 
PPT
Method study
sparsh maheshwari
 
PDF
Introduction of design of machine element
yamini champaneri
 
PDF
CELLULAR MANUFACTURING & FLEXIBLE MANUFACTURING SYSTEM - UNIT 5 - CAD & M
Balamurugan Subburaj
 
PPTX
Group Technology
Himanshi Gupta
 
PPTX
TIME STUDY
chhavi narayan
 
PPT
Work Study- Methods Study
Joseph Konnully
 
PPTX
assembly line balancing
Amalia Syafitri
 
PDF
Industrial engineering
Bisher Marad
 
PPTX
Group Technology
Sunith Guraddi
 
PPTX
Transfer machines
Suresh Lal
 
PPTX
Computer Aided Process Planning (CAPP)
Pratik Gandhi
 
PPTX
Industrial Engineering
vijay kumar
 
PPT
Layout of FMS
sgrsoni45
 
Process Planning
Guhan M
 
introduction to process planning murugananthan
Murugananthan K
 
Concurrent engineering
paragmahajan01
 
Work study
Dharam Ranka.Rvd
 
Unit ii Process Planning
Asha A
 
Flexible manufacturing system(FMS).
Nitin Patil
 
Method study
sparsh maheshwari
 
Introduction of design of machine element
yamini champaneri
 
CELLULAR MANUFACTURING & FLEXIBLE MANUFACTURING SYSTEM - UNIT 5 - CAD & M
Balamurugan Subburaj
 
Group Technology
Himanshi Gupta
 
TIME STUDY
chhavi narayan
 
Work Study- Methods Study
Joseph Konnully
 
assembly line balancing
Amalia Syafitri
 
Industrial engineering
Bisher Marad
 
Group Technology
Sunith Guraddi
 
Transfer machines
Suresh Lal
 
Computer Aided Process Planning (CAPP)
Pratik Gandhi
 
Industrial Engineering
vijay kumar
 
Layout of FMS
sgrsoni45
 
Ad

Viewers also liked (20)

PPT
Plant layout ppt by me
Ankit Walia
 
PPTX
evaporative cooling
Yash Patel
 
PPTX
press operation
Yash Patel
 
PPTX
fruit and vegetable plant location,layout and sanitation
Anjali Mehta
 
PPT
Plant location and layout
Swapnil Kshirsagar
 
PDF
Mahanand Dairy
Vaibhav Daphalapure
 
PPTX
A presentation on Butter [Welcome To Everybody]
Sabbir Ahmed
 
PPT
BIS4995 : Web-based Package Tour Reservation System
Woraphan Atikomtrirat
 
PPTX
DDA algorithm
Yash Patel
 
PPTX
Plant layout and its types
Kritika Garg
 
PPT
MANUFACTURING OF CNC MACHINES- TRAINING REPORT AT JYOTI CNC
Bhaumik Sheth
 
DOCX
Mother dairy final report
ANANDKUMAR TIWARI
 
PPTX
Industrial engineering presentation
Işıl Tabağ
 
PPTX
Plant layout
amanpreetbhamra
 
PPT
Plant layout and its types
Hammaduddin
 
PDF
Project report-on-amul
vijugreat16
 
PPT
Event Management
Joey Phuah
 
DOC
Project Report on Amul
Rohan Naik
 
PPTX
two degree of freddom system
Yash Patel
 
PPTX
Tourism ppt
SBrooker
 
Plant layout ppt by me
Ankit Walia
 
evaporative cooling
Yash Patel
 
press operation
Yash Patel
 
fruit and vegetable plant location,layout and sanitation
Anjali Mehta
 
Plant location and layout
Swapnil Kshirsagar
 
Mahanand Dairy
Vaibhav Daphalapure
 
A presentation on Butter [Welcome To Everybody]
Sabbir Ahmed
 
BIS4995 : Web-based Package Tour Reservation System
Woraphan Atikomtrirat
 
DDA algorithm
Yash Patel
 
Plant layout and its types
Kritika Garg
 
MANUFACTURING OF CNC MACHINES- TRAINING REPORT AT JYOTI CNC
Bhaumik Sheth
 
Mother dairy final report
ANANDKUMAR TIWARI
 
Industrial engineering presentation
Işıl Tabağ
 
Plant layout
amanpreetbhamra
 
Plant layout and its types
Hammaduddin
 
Project report-on-amul
vijugreat16
 
Event Management
Joey Phuah
 
Project Report on Amul
Rohan Naik
 
two degree of freddom system
Yash Patel
 
Tourism ppt
SBrooker
 
Ad

Similar to travel chart for plant layout (20)

PPS
Case Study for Plant Layout :: A modern analysis
Sarang Bhutada
 
PDF
ProductionManagement-04 Facilities Planning-1.pdf
NIREEKSHITHB
 
PPTX
Indutrual engieneering
Dhruv Patel
 
PPTX
Introduction to estimation
DhavalMithaiwala
 
PPTX
PRODUCTION PLANNING AND CONTROL-WORK STUDY
AttiMurugan
 
PPT
Quantity Surveying & valuation.ppt
TauheedKhan45
 
PDF
5.1 quantity take-off
Ali Juma Albahrani
 
PDF
DESIGN AND OPTIMIZATION OF CRITICAL PART OF A ROTARY TABLE USED IN HORIZONTAL...
IAEME Publication
 
PPT
Layout strategies
shilpijain23
 
PPTX
Approximate estimate
Prasad Manerikar
 
PDF
fuw5fomwrucbh1ojdlxe-signature-b01f2df686b9c053f2f9f35a62a4a1f12d0e812f6cbea3...
Deepak37004
 
PPTX
Chapter 2 - Locating Facilities - FULL.pptx
2356020092
 
PPT
Estimation (power Point).ppt
NaumanIjaz12
 
PPT
Ecm442 lecture 1 latest
MUHAMMADSYAHMIFADZIL
 
PDF
Production & Operation Management Chapter28[1]
Hariharan Ponnusamy
 
PPTX
Chương-8-Vi-tri-thiet-bi-day bkel.pptx
emailcaidat
 
PPTX
MA Internal Presentation.pptx Example 2 (1).pptx
Manjulasingh17
 
PDF
Estimation and costing ppt by ramkrishna
SnehalChavan75
 
DOCX
IntroductionTopological sorting is a common operation performed .docx
mariuse18nolet
 
Case Study for Plant Layout :: A modern analysis
Sarang Bhutada
 
ProductionManagement-04 Facilities Planning-1.pdf
NIREEKSHITHB
 
Indutrual engieneering
Dhruv Patel
 
Introduction to estimation
DhavalMithaiwala
 
PRODUCTION PLANNING AND CONTROL-WORK STUDY
AttiMurugan
 
Quantity Surveying & valuation.ppt
TauheedKhan45
 
5.1 quantity take-off
Ali Juma Albahrani
 
DESIGN AND OPTIMIZATION OF CRITICAL PART OF A ROTARY TABLE USED IN HORIZONTAL...
IAEME Publication
 
Layout strategies
shilpijain23
 
Approximate estimate
Prasad Manerikar
 
fuw5fomwrucbh1ojdlxe-signature-b01f2df686b9c053f2f9f35a62a4a1f12d0e812f6cbea3...
Deepak37004
 
Chapter 2 - Locating Facilities - FULL.pptx
2356020092
 
Estimation (power Point).ppt
NaumanIjaz12
 
Ecm442 lecture 1 latest
MUHAMMADSYAHMIFADZIL
 
Production & Operation Management Chapter28[1]
Hariharan Ponnusamy
 
Chương-8-Vi-tri-thiet-bi-day bkel.pptx
emailcaidat
 
MA Internal Presentation.pptx Example 2 (1).pptx
Manjulasingh17
 
Estimation and costing ppt by ramkrishna
SnehalChavan75
 
IntroductionTopological sorting is a common operation performed .docx
mariuse18nolet
 

Recently uploaded (20)

PDF
Phylum Arthropoda: Characteristics and Classification, Entomology Lecture
Miraj Khan
 
PPTX
Open Quiz Monsoon Mind Game Prelims.pptx
Sourav Kr Podder
 
PDF
Types of Literary Text: Poetry and Prose
kaelandreabibit
 
PPTX
How to Manage Leads in Odoo 18 CRM - Odoo Slides
Celine George
 
PPTX
Skill Development Program For Physiotherapy Students by SRY.pptx
Prof.Dr.Y.SHANTHOSHRAJA MPT Orthopedic., MSc Microbiology
 
PDF
The Minister of Tourism, Culture and Creative Arts, Abla Dzifa Gomashie has e...
nservice241
 
PDF
The Final Stretch: How to Release a Game and Not Die in the Process.
Marta Fijak
 
PDF
High Ground Student Revision Booklet Preview
jpinnuck
 
PDF
Arihant Class 10 All in One Maths full pdf
sajal kumar
 
PPTX
TEF & EA Bsc Nursing 5th sem.....BBBpptx
AneetaSharma15
 
PDF
2.Reshaping-Indias-Political-Map.ppt/pdf/8th class social science Exploring S...
Sandeep Swamy
 
PPTX
Understanding operators in c language.pptx
auteharshil95
 
PPTX
ACUTE NASOPHARYNGITIS. pptx
AneetaSharma15
 
PPTX
Odoo 18 Sales_ Managing Quotation Validity
Celine George
 
PPTX
IMMUNIZATION PROGRAMME pptx
AneetaSharma15
 
PDF
Landforms and landscapes data surprise preview
jpinnuck
 
PPTX
Dakar Framework Education For All- 2000(Act)
santoshmohalik1
 
PPTX
An introduction to Dialogue writing.pptx
drsiddhantnagine
 
PPTX
Strengthening open access through collaboration: building connections with OP...
Jisc
 
PPTX
Information Texts_Infographic on Forgetting Curve.pptx
Tata Sevilla
 
Phylum Arthropoda: Characteristics and Classification, Entomology Lecture
Miraj Khan
 
Open Quiz Monsoon Mind Game Prelims.pptx
Sourav Kr Podder
 
Types of Literary Text: Poetry and Prose
kaelandreabibit
 
How to Manage Leads in Odoo 18 CRM - Odoo Slides
Celine George
 
Skill Development Program For Physiotherapy Students by SRY.pptx
Prof.Dr.Y.SHANTHOSHRAJA MPT Orthopedic., MSc Microbiology
 
The Minister of Tourism, Culture and Creative Arts, Abla Dzifa Gomashie has e...
nservice241
 
The Final Stretch: How to Release a Game and Not Die in the Process.
Marta Fijak
 
High Ground Student Revision Booklet Preview
jpinnuck
 
Arihant Class 10 All in One Maths full pdf
sajal kumar
 
TEF & EA Bsc Nursing 5th sem.....BBBpptx
AneetaSharma15
 
2.Reshaping-Indias-Political-Map.ppt/pdf/8th class social science Exploring S...
Sandeep Swamy
 
Understanding operators in c language.pptx
auteharshil95
 
ACUTE NASOPHARYNGITIS. pptx
AneetaSharma15
 
Odoo 18 Sales_ Managing Quotation Validity
Celine George
 
IMMUNIZATION PROGRAMME pptx
AneetaSharma15
 
Landforms and landscapes data surprise preview
jpinnuck
 
Dakar Framework Education For All- 2000(Act)
santoshmohalik1
 
An introduction to Dialogue writing.pptx
drsiddhantnagine
 
Strengthening open access through collaboration: building connections with OP...
Jisc
 
Information Texts_Infographic on Forgetting Curve.pptx
Tata Sevilla
 

travel chart for plant layout

  • 1. Gandhinagar Institute of Technology Branch:- Mechanical Semester:-6th (D) Subject:- Industrial Engineering Active Learning Assignment (ALA) Topic:-Travel Chart For Plant Layout Prepared By:- guided By:- Patel Yash S. (150123119039) Prof. Vipal Panchal
  • 2. What is Travel chart? • The chart which gives an estimate about the amount of materials handling between various work stations is known as “Travel chart”. • The aim of travel chart is to decide such layout where overall materials handling function is performed at minimum cost. • Movement of workers, material & equipment at any time and any workstation is shown numerically by two way matrix.
  • 3. • Travel chart is square tabular where each column and row represents single work station. • Construction of travel chart depends on the “from-to” chart. Once the frequency & distance travelled between workstations is meaured, the total distance travelled is placed in terms of each distance travelled. • According to that change the layout design of the plant with the aim to reduce the total distance travelled.
  • 4. • As shown in the diagram, here travelling from one station to other is represented as ‘X’. • So there is high work load on the station no.4, almost from all department. • So, if the layout is changed in a such reducing the travel distance, then it is possible to reduce travelling cost as well as travelling time
  • 6. Example:- • Assume that a plant engaged in manufacture often types of products. the sequence, weight and quantity per of the year of each type of products are given in table. there are nine buildings in the plant. Each building should be center of one operation only.
  • 9. PROCEDURE:- • Let the nine building be symbolized as A,B,C,D,E,F,G,H and I. all these building are already constructed, so inter-building distance are fixed. Each building will be a shop for one type of operation only, say for example if we decide to make building as center of drilling them only drilling machines will be housed there. • The objective is to minimize the quantity ,weight x distance ,i.e number of products x weight-of each product x total distance moved by each for all operation-on it should be minimized. on careful study we noticed that.  Number of products of each variety is fixed  Weight of each product is fixed ,therefore to reduce the overall we should try to reduce the overall distance only. • Assume that raw material store will be in building A,B will be pattern shop ,c will be foundry shop and so on, is table C. it is an initial tentative layout.
  • 15. • Calculate the number of products x distance for each of the two variteis I and VIII • For I, 5000 × 30 × 8 = 15000Kg.m • For VIII, 1500 × 0.4 × 30 = 18000Kg.m • The overall total= 72.31 × 10 5