SlideShare a Scribd company logo
1
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
www.tristargold.com TSXV: TSG | OTCQB: TSGZF
DEVELOPING GOLD
DELIVERING VALUE
Corporate Presentation I September 2024
2
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
DISCLAIMERS
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
presentation. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.
Certain statements contained in this presentation may constitute forward-looking statements under Canadian securities legislation which are not historical facts and are made pursuant to the "safe
harbour" provisions under the United States Private Securities Litigation Reform Act of 1995. Generally, forward-looking information can be identified by the use of forward-looking terminology such as
"expects" or "it is expected", or variations of such words and phrases or statements that certain actions, events or results "will" occur. Forward looking statements in this press release include all estimates
from the PFS such as the cash flow, IRR, NPVs, cash cost, AISC, initial capital, life of mine production, average annual production and payback period time. Such forward-looking statements are based upon
the Company's reasonable expectations and business plan at the date hereof, which are subject to change depending on economic, political and competitive circumstances and contingencies. Readers are
cautioned that such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause a change in such assumptions and the actual outcomes and estimates to
be materially different from those estimated or anticipated future results, achievements or position expressed or implied by those forward-looking statements. Risks, uncertainties and other factors that
could cause the Company's plans to change include changes in demand for and price of gold and other commodities (such as fuel and electricity) and currencies; changes or disruptions in the securities
markets; legislative, political or economic developments in Brazil; the need to obtain permits and comply with laws and regulations and other regulatory requirements; the possibility that actual results of
work may differ from projections/expectations or may not realize the perceived potential of the Company's projects; risks of accidents, equipment breakdowns and labour disputes or other unanticipated
difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in development programs; operating or technical difficulties in connection with exploration, mining or development
activities; the speculative nature of gold exploration and development, including the risks of diminishing quantities of grades of reserves and resources; and the risks involved in the exploration,
development and mining business. Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-
looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. The Company disclaims any intention or obligation to
update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by applicable securities laws.
Notes: Estimated All In Sustaining Costs per ounce of gold produced is a Non-GAAP measure that is equal to the total of site mining costs, site and corporate G&A costs, royalties and production taxes,
realized gains/losses on hedging transactions, community and permitting costs relating to current operations, refining costs, site based non-cash remuneration, inventory write-downs, stripping costs,
byproduct credits, reclamation costs, and sustaining costs related to exploration and studies, capital exploration, capitalized stripping and underground mine development, and capital expenditures, divided
by the estimated total ounces of gold produced during the life of the mine. Cash costs per ounce of gold produced is also a non-GAAP financial measure and is equal to on-site mining and processing costs,
on-site general and administration costs, realized gains and losses on hedges due to operating costs, community and permitting costs related to current operations, third party refining and transportation
costs, non-cash site remuneration costs, stripping costs, stockpile and inventory write-downs, exploration costs related to current operations and by-product credits all divided by ounces of gold cost
produced.
Guilherme Gomides Ferreira MAIG of GE21, a qualified person as defined in National Instrument 43-101 has reviewed and approved the technical information contained in this presentation and approves
its publication.
1 Please see Technical Report titled ‘Castelo de Sonhos Project, Pre-Feasibility Study’ by Leonardo de Moraes Soares – MAIG, Guilherme Gomides – MAIG, Ricardo Reis de Paula – MAIG, Porfirio Cabaleiro
– FAIG, Andries Jacobus Strauss – Pr.Eng. ECSA, and Martin Paul Boland – CGeol. GSL effective October 4, 2021
3
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
Brazil’s Next Major Gold Mine
✓Development Hotspot – Brazil
• G Mining Ventures; Pará State
• Tocantinzinho, commercial production Sept 2024
• Hochschild Mining; Goiás State
• Mara Rosa, first gold pour Feb 2024
• Ero Copper; Pará State
• Tucumã, Production Q3 2024
• Aura Minerals; Tocantins and Rio Grande do Norte
• Almas, production Q2 2023
• Borborema, In construction
3
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
GOLD MINES IN BRAZIL
4
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
CASTELO DE
SONHOS
DEVELOPMENT
THE PROJECT
• Large resource1:
• 1.8Moz Indicated plus
0.7Moz inferred
• Investments from Royal
Gold (Aug 2019) and
Auramet (Apr 2022)
ADVANCING TO
CONSTRUCTION
• Oct 2021 PFS (pretax)1:
• $1,550 gold
• IRR 33%
• NPV5 $399M
• $2,000 gold
• IRR 54%
• NPV5 $811M
STRAIGHTFORWARD
MINING
• Mineralization at surface
• 98% gold recovery
• Environmentally clean
• No sulphides
SIGNIFICANT
UPSIDE
• Resource open on strike
and at depth
• ~19km of mineralized
conglomerate reef at the
site
5
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
TSXV:
TSG
|
OTCQB:
TSGZF
Permitted
multi-million-
ounce deposit
Social
License
Environmental
Viability
2021
PFS:1.4Moz
Strong
Economics
2022
Auramet
Investment
2019
Royal Gold
Investment
2024
LP Permit
Approved
CASTLE OF
DREAMS
5
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
6
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
33%
$1,550 Gold
54%
$2,000 Gold
1.4M Ounces
Current Gold
reserves
121koz/yr
LOM annual production
over 11-yr mine life
146koz/yr
Esperança South,
year 1-6
US$261M
Initial capital
Incl. 20% contingency
$900/oz
AISC
IRR Pre-Tax
COMPELLING ECONOMICS
PFS Base Case: $1,550 Gold
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
US$399M
$1,550 Gold
US$811M
$2,000 Gold
NPV5%
Pre-Tax
US$628M
$1,800 Gold
Please footnote 1 on Slide 2 for Disclosure
7
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
PFS PRODUCTION &
PROPOSED LAYOUT
TWO-PHASE
MINING
• Years 1-6, the higher
grade Esperança South
deposit
• Years 7-11, the
Esperança East and
Center deposits
PROCESS
DESIGN
• 3.6Mtpa plant: CIL
• Feed grades:
• 1.3 g/t gold in
Phase 1,
• 0.8 g/t gold in
Phase 2
• 98% gold recovery
Please footnote 1 on Slide 2 for Disclosure
8
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
Chairman & Director
Mark Jones III
CEO, President &
Director
Nick Appleyard
Independent Director
Carlos Vilhena
Independent Director
ChairofAuditCommittee
Jessica Van Den
Akker
Independent Director
Mark Isto
Lead Independent
Director
Rod McKeen
Independent Director
Eric Zaunscherb
Chief Financial Officer
Scott Brunsdon
Chief Operating Officer
Marcus Brewster
MANAGEMENT & BOARD OF DIRECTORS
9
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
Involved and Invested
BOARD OF DIRECTORS
Our closest community
ESPERANÇA IV
Currently being rebuilt
ESPERANÇA IV SCHOOL
Important to all of us
LOCAL FLORA & FAUNA
Our neighbors are always welcome
A VISIT FROM
LOCAL CYCLISTS
They are the future of the region
EDUCATING THE NEXT
GENERATION
Keeping people and nature healthy
DELIVERING PLANTS
ESG Leadership
Focus on health,
education, and
environment
10
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
Market Capitalization Retail
Insider & Associates
Institution
53%
11%
36%
C$55 million
Cash
~C$2.0 million
Share Price
C$0.195
52-Week Range
C$0.07 – 0.24
Shares Issued
280 million
Fully Diluted Shares
309.3 million
Stock Options
9.1 million
Warrants
20.3 million
CAPITAL STRUCTURE
*As of September 5, 2024
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
11
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
TSXV:
TSG
|
OTCQB:
TSGZF
PEERS SORTED BY MARKET CAPITALIZATION
TriStar steps “right” on LP grant, but should move further…
Sources: FactSet; Company reports; Lee, Zaunscherb & Associates Inc.
Increasing Market Capitalization
12
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
TSXV:
TSG
|
OTCQB:
TSGZF
GOLD PRICE vs MEAN EQUITY EV/OZ GOLD
Gold equity valuations are responding to higher gold price
Sources: FactSet, Company Reports, Lee, Zaunscherb & Associates Inc. estimates
13
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
TSXV:
TSG
|
OTCQB:
TSGZF
DID MARKET BOTTOM IN OCTOBER 2023?
Although it didn't feel like it, shorter and gentler than the average downward leg
Sources: FactSet, TMX Group, Lee, Zaunscherb & Associates Inc.
14
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
TSXV:
TSG
|
OTCQB:
TSGZF
A NEW BEGINNING?
If a new bull market began in October 2023, we have a long way to go to the average…
Sources: FactSet, TMX Group, Lee, Zaunscherb & Associates Inc.
15
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
Region
INDICATED CATEGORY INFERRED CATEGORY
Tonnes
(Mt)
Grade
(g/t Au)
Ounces
(Moz)
Tonnes
(Mt)
Grade
(g/t Au)
Ounces
(Moz)
Esperança South 29.0 1.3 1.2 10.0 1.2 0.4
Esperança East 5.0 0.8 0.1 12.8 0.7 0.3
Esperança Center 19.1 0.7 0.4 3.3 0.9 0.1
PROJECT TOTAL 53.1 1.0 1.8 26.0 0.9 0.7
Region Tonnes
(Mt)
Grade
(g/t Au)
Ounces
(Moz)
Esperança South 24.2 1.3 1.0
Esperança East 3.1 0.8 0.1
Esperança Center 11.4 0.8 0.3
PROBABLE RESERVES 38.7 1.1 1.4
MINERAL RESERVES
all Probable Classification
MINERAL RESOURCES
Inclusive of Reserves
Further details available in the October 5th 2021 press release entitled “TriStar Gold Announces Positive PFS with 1.4
Moz Gold Reserves and pre-tax 33% IRR and $400 million NPV”
15
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
16
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
TSXV:
TSG
|
OTCQB:
TSGZF
Chairman & Director
Mark Jones III
NEAR-MINE UPSIDE POTENTIAL
Down – dip extensional potential:
Needs to be tested with a “what if”
analysis and optimisation sensitivity
work to focus drilling
Extensions between scheduled pits:
E.g. Esperanca South (ES)
Higher grade paleochannels have
been identified and mapped: to be
used for focused drilling down dip of
ES and Arrias
Strike extension potential: to the
south and north of Esperanca South
17
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
TSXV:
TSG
|
OTCQB:
TSGZF
ADDITIONAL TARGETS – UPSIDE POTENTIAL
More than 50% of the known
16km strike length yet to be
properly explored and evaluated.
Untested gold-in-soil geochemical
anomalies.
Current outcrop represents the
rim of a large basin and therefore
there are deep targets for both
down-dip paleoplacer and
hydrothermal targets.
18
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
www.tristargold.com TSXV: TSG | OTCQB: TSGZF
Nick Appleyard I
Scott Brunsdon I
Marcus Brewster I
President & CEO
CFO
COO
Scottsdale Office:
+1 (480) 794-1244
info@tristargold.com
www.tristargold.com
19
Tristar
Gold
|
TSXV:
TSG
|
OTCQB:
TSGZF
$79
$171
$262
$353
$399
$445
$536
$628
$719
$811
12%
18%
25%
30%
33%
35%
40%
45%
50%
54%
$1,200 $1,300 $1,400 $1,500 $1,550 $1,600 $1,700 $1,800 $1,900 $2,000
Pre-tax
NPV5
US$
millions
Pre-tax
IRR%
Gold Price (US$/oz)
STRONG LEVERAGE TO GOLD PRICES
PFS Sensitivity to Gold Prices
>$2,000 Spot (Sept 2024)
Please footnote 1 on Slide 2 for Disclosure

More Related Content

PDF
TriStar Gold April 2025 Corporate Presentation
PDF
Tristar Corporate Presentation Investors page
PDF
TriStar Gold Corporate Presentation March 2025
PDF
TriStar Gold Corporate Presentation - December 2024
PDF
TriStar Gold Corporate Presentation May 2024
PDF
TriStar Gold- 05-13-2024 corporate presentation
PDF
TriStar Gold Corporate Presentation - April 2024
PDF
TriStar Gold Corporate Presentation January 2024
TriStar Gold April 2025 Corporate Presentation
Tristar Corporate Presentation Investors page
TriStar Gold Corporate Presentation March 2025
TriStar Gold Corporate Presentation - December 2024
TriStar Gold Corporate Presentation May 2024
TriStar Gold- 05-13-2024 corporate presentation
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation January 2024

Similar to TriStar Gold Corporate Presentation September 2024 (20)

PDF
TriStar Gold- Corporate Presentation - December 2023
PDF
TriStar-Gold-presentation-11-07-2023.pdf
PDF
TriStar Gold- 11-15-2023.pdf
PDF
TriStar Gold Corporate Presentation February 2024
PDF
TriStar Gold Corporate Presentation Updated February 2024
PDF
TriStar Gold- 03-13-2024 presentation pdf
PDF
TriStar Gold- 07-24-2023.pdf
PDF
TriStar Gold - Corporate Presentation August 2023
PDF
TriStar Gold Corporate Presentation August 2025
PDF
TriStar Gold Corporate Presentation Oct 2024
PDF
TriStar Gold Corporate Presentation May 2025
PDF
TriStar Gold Corporate Presentation - June 2025
PDF
TriStar Gold May Presentation
PDF
TriStar Gold- 04-14-2023 CEM Scottsdale Presentation
PDF
TriStar-Gold-09-08-2023-2.pdf
PDF
TriStar Gold- 10-02-2023.pdf
PDF
TriStar Gold Corporate Presentation - September 2023
PDF
TriStar Gold Corporate Presentation - 2025-07.1.pdf
PDF
TSG Feb 2023.pdf
PDF
TriStar - Oct 2022.pdf
TriStar Gold- Corporate Presentation - December 2023
TriStar-Gold-presentation-11-07-2023.pdf
TriStar Gold- 11-15-2023.pdf
TriStar Gold Corporate Presentation February 2024
TriStar Gold Corporate Presentation Updated February 2024
TriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 07-24-2023.pdf
TriStar Gold - Corporate Presentation August 2023
TriStar Gold Corporate Presentation August 2025
TriStar Gold Corporate Presentation Oct 2024
TriStar Gold Corporate Presentation May 2025
TriStar Gold Corporate Presentation - June 2025
TriStar Gold May Presentation
TriStar Gold- 04-14-2023 CEM Scottsdale Presentation
TriStar-Gold-09-08-2023-2.pdf
TriStar Gold- 10-02-2023.pdf
TriStar Gold Corporate Presentation - September 2023
TriStar Gold Corporate Presentation - 2025-07.1.pdf
TSG Feb 2023.pdf
TriStar - Oct 2022.pdf
Ad

More from Adnet Communications (20)

PDF
Q2 2025 :Lundin Gold Conference Call Presentation_Final.pdf
PDF
Torex to Acquire Prime Mining - July 2025
PDF
Lundin Gold - Corporate Presentation - July 2025
PDF
2025-06-01 - Torex Gold - Corporate Presentation - June 2025.pdf
PDF
Lundin Gold Corporate Presentation - June 2025
PDF
Lion One Metals Corporate Presentation - May 2025
PDF
Lundin Gold Corporate Presentation - May 2025
PDF
Lundin Gold Q1 2025 Conference Call Presentation
PDF
2025-05-08 - Torex Gold - Corporate Presentation - May 2025.pdf
PDF
Strategic Resources May 2025 Corporate Presentation
PDF
Silver One May 2025 Corporate Presentation
PDF
Lion One Metals Corporate Presentation April 2025
PDF
Lundin Gold - April 2025 Corporate Presentation
PDF
Lundin Gold - Corporate Presentation - April 2025
PDF
Lundin Gold Corporate Presentation March 2025
PDF
Strategic Resources March 2025 Corporate Presentation
PDF
Silver One March 2025 Corporate Presentation
PDF
Q4 2024 Conference Call Presentation_Final.pdf
PDF
Lundin Gold February 2025 Corporate Presentation
PDF
Lundin Gold January 2025 Corporate Presentation
Q2 2025 :Lundin Gold Conference Call Presentation_Final.pdf
Torex to Acquire Prime Mining - July 2025
Lundin Gold - Corporate Presentation - July 2025
2025-06-01 - Torex Gold - Corporate Presentation - June 2025.pdf
Lundin Gold Corporate Presentation - June 2025
Lion One Metals Corporate Presentation - May 2025
Lundin Gold Corporate Presentation - May 2025
Lundin Gold Q1 2025 Conference Call Presentation
2025-05-08 - Torex Gold - Corporate Presentation - May 2025.pdf
Strategic Resources May 2025 Corporate Presentation
Silver One May 2025 Corporate Presentation
Lion One Metals Corporate Presentation April 2025
Lundin Gold - April 2025 Corporate Presentation
Lundin Gold - Corporate Presentation - April 2025
Lundin Gold Corporate Presentation March 2025
Strategic Resources March 2025 Corporate Presentation
Silver One March 2025 Corporate Presentation
Q4 2024 Conference Call Presentation_Final.pdf
Lundin Gold February 2025 Corporate Presentation
Lundin Gold January 2025 Corporate Presentation
Ad

Recently uploaded (20)

PDF
how_to_earn_50k_monthly_investment_guide.pdf
PDF
Melcom Copeland_Ripple_XRPL_First Ledger_Case Study (2024).pdf
PDF
The Integration of Bophuthatswana Electricity Corporation into Eskom by Matth...
PDF
Bladex Earnings Call Presentation 2Q2025
PPTX
Antihypertensive_Drugs_Presentation_Poonam_Painkra.pptx
PDF
final_dropping_the_baton_-_how_america_is_failing_to_use_russia_sanctions_and...
PDF
FESE Capital Markets Fact Sheet 2025 Q2.pdf
PPTX
Session 14-16. Capital Structure Theories.pptx
PDF
caregiving tools.pdf...........................
PDF
way to join Real illuminati agent 0782561496,0756664682
PDF
Mathematical Economics 23lec03slides.pdf
PPTX
What is next for the Fractional CFO - August 2025
PPTX
Globalization-of-Religion. Contemporary World
PDF
Topic Globalisation and Lifelines of National Economy.pdf
PDF
Corporate Finance Fundamentals - Course Presentation.pdf
PDF
Dr Tran Quoc Bao the first Vietnamese speaker at GITEX DigiHealth Conference ...
PPTX
Overview of India which express the landscape .pptx
PPTX
Chapter Two2.Meaning and characteristics of taxation
PPTX
HDFC Retirement Plans.pptx hdfc retirement
PDF
A Brief Introduction About Greg Kutzin
how_to_earn_50k_monthly_investment_guide.pdf
Melcom Copeland_Ripple_XRPL_First Ledger_Case Study (2024).pdf
The Integration of Bophuthatswana Electricity Corporation into Eskom by Matth...
Bladex Earnings Call Presentation 2Q2025
Antihypertensive_Drugs_Presentation_Poonam_Painkra.pptx
final_dropping_the_baton_-_how_america_is_failing_to_use_russia_sanctions_and...
FESE Capital Markets Fact Sheet 2025 Q2.pdf
Session 14-16. Capital Structure Theories.pptx
caregiving tools.pdf...........................
way to join Real illuminati agent 0782561496,0756664682
Mathematical Economics 23lec03slides.pdf
What is next for the Fractional CFO - August 2025
Globalization-of-Religion. Contemporary World
Topic Globalisation and Lifelines of National Economy.pdf
Corporate Finance Fundamentals - Course Presentation.pdf
Dr Tran Quoc Bao the first Vietnamese speaker at GITEX DigiHealth Conference ...
Overview of India which express the landscape .pptx
Chapter Two2.Meaning and characteristics of taxation
HDFC Retirement Plans.pptx hdfc retirement
A Brief Introduction About Greg Kutzin

TriStar Gold Corporate Presentation September 2024

  • 1. 1 Tristar Gold | TSXV: TSG | OTCQB: TSGZF www.tristargold.com TSXV: TSG | OTCQB: TSGZF DEVELOPING GOLD DELIVERING VALUE Corporate Presentation I September 2024
  • 2. 2 Tristar Gold | TSXV: TSG | OTCQB: TSGZF Tristar Gold | TSXV: TSG | OTCQB: TSGZF DISCLAIMERS Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this presentation. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. Certain statements contained in this presentation may constitute forward-looking statements under Canadian securities legislation which are not historical facts and are made pursuant to the "safe harbour" provisions under the United States Private Securities Litigation Reform Act of 1995. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "expects" or "it is expected", or variations of such words and phrases or statements that certain actions, events or results "will" occur. Forward looking statements in this press release include all estimates from the PFS such as the cash flow, IRR, NPVs, cash cost, AISC, initial capital, life of mine production, average annual production and payback period time. Such forward-looking statements are based upon the Company's reasonable expectations and business plan at the date hereof, which are subject to change depending on economic, political and competitive circumstances and contingencies. Readers are cautioned that such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause a change in such assumptions and the actual outcomes and estimates to be materially different from those estimated or anticipated future results, achievements or position expressed or implied by those forward-looking statements. Risks, uncertainties and other factors that could cause the Company's plans to change include changes in demand for and price of gold and other commodities (such as fuel and electricity) and currencies; changes or disruptions in the securities markets; legislative, political or economic developments in Brazil; the need to obtain permits and comply with laws and regulations and other regulatory requirements; the possibility that actual results of work may differ from projections/expectations or may not realize the perceived potential of the Company's projects; risks of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in development programs; operating or technical difficulties in connection with exploration, mining or development activities; the speculative nature of gold exploration and development, including the risks of diminishing quantities of grades of reserves and resources; and the risks involved in the exploration, development and mining business. Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward- looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by applicable securities laws. Notes: Estimated All In Sustaining Costs per ounce of gold produced is a Non-GAAP measure that is equal to the total of site mining costs, site and corporate G&A costs, royalties and production taxes, realized gains/losses on hedging transactions, community and permitting costs relating to current operations, refining costs, site based non-cash remuneration, inventory write-downs, stripping costs, byproduct credits, reclamation costs, and sustaining costs related to exploration and studies, capital exploration, capitalized stripping and underground mine development, and capital expenditures, divided by the estimated total ounces of gold produced during the life of the mine. Cash costs per ounce of gold produced is also a non-GAAP financial measure and is equal to on-site mining and processing costs, on-site general and administration costs, realized gains and losses on hedges due to operating costs, community and permitting costs related to current operations, third party refining and transportation costs, non-cash site remuneration costs, stripping costs, stockpile and inventory write-downs, exploration costs related to current operations and by-product credits all divided by ounces of gold cost produced. Guilherme Gomides Ferreira MAIG of GE21, a qualified person as defined in National Instrument 43-101 has reviewed and approved the technical information contained in this presentation and approves its publication. 1 Please see Technical Report titled ‘Castelo de Sonhos Project, Pre-Feasibility Study’ by Leonardo de Moraes Soares – MAIG, Guilherme Gomides – MAIG, Ricardo Reis de Paula – MAIG, Porfirio Cabaleiro – FAIG, Andries Jacobus Strauss – Pr.Eng. ECSA, and Martin Paul Boland – CGeol. GSL effective October 4, 2021
  • 3. 3 Tristar Gold | TSXV: TSG | OTCQB: TSGZF Brazil’s Next Major Gold Mine ✓Development Hotspot – Brazil • G Mining Ventures; Pará State • Tocantinzinho, commercial production Sept 2024 • Hochschild Mining; Goiás State • Mara Rosa, first gold pour Feb 2024 • Ero Copper; Pará State • Tucumã, Production Q3 2024 • Aura Minerals; Tocantins and Rio Grande do Norte • Almas, production Q2 2023 • Borborema, In construction 3 Tristar Gold | TSXV: TSG | OTCQB: TSGZF GOLD MINES IN BRAZIL
  • 4. 4 Tristar Gold | TSXV: TSG | OTCQB: TSGZF CASTELO DE SONHOS DEVELOPMENT THE PROJECT • Large resource1: • 1.8Moz Indicated plus 0.7Moz inferred • Investments from Royal Gold (Aug 2019) and Auramet (Apr 2022) ADVANCING TO CONSTRUCTION • Oct 2021 PFS (pretax)1: • $1,550 gold • IRR 33% • NPV5 $399M • $2,000 gold • IRR 54% • NPV5 $811M STRAIGHTFORWARD MINING • Mineralization at surface • 98% gold recovery • Environmentally clean • No sulphides SIGNIFICANT UPSIDE • Resource open on strike and at depth • ~19km of mineralized conglomerate reef at the site
  • 6. 6 Tristar Gold | TSXV: TSG | OTCQB: TSGZF 33% $1,550 Gold 54% $2,000 Gold 1.4M Ounces Current Gold reserves 121koz/yr LOM annual production over 11-yr mine life 146koz/yr Esperança South, year 1-6 US$261M Initial capital Incl. 20% contingency $900/oz AISC IRR Pre-Tax COMPELLING ECONOMICS PFS Base Case: $1,550 Gold Tristar Gold | TSXV: TSG | OTCQB: TSGZF US$399M $1,550 Gold US$811M $2,000 Gold NPV5% Pre-Tax US$628M $1,800 Gold Please footnote 1 on Slide 2 for Disclosure
  • 7. 7 Tristar Gold | TSXV: TSG | OTCQB: TSGZF PFS PRODUCTION & PROPOSED LAYOUT TWO-PHASE MINING • Years 1-6, the higher grade Esperança South deposit • Years 7-11, the Esperança East and Center deposits PROCESS DESIGN • 3.6Mtpa plant: CIL • Feed grades: • 1.3 g/t gold in Phase 1, • 0.8 g/t gold in Phase 2 • 98% gold recovery Please footnote 1 on Slide 2 for Disclosure
  • 8. 8 Tristar Gold | TSXV: TSG | OTCQB: TSGZF Chairman & Director Mark Jones III CEO, President & Director Nick Appleyard Independent Director Carlos Vilhena Independent Director ChairofAuditCommittee Jessica Van Den Akker Independent Director Mark Isto Lead Independent Director Rod McKeen Independent Director Eric Zaunscherb Chief Financial Officer Scott Brunsdon Chief Operating Officer Marcus Brewster MANAGEMENT & BOARD OF DIRECTORS
  • 9. 9 Tristar Gold | TSXV: TSG | OTCQB: TSGZF Involved and Invested BOARD OF DIRECTORS Our closest community ESPERANÇA IV Currently being rebuilt ESPERANÇA IV SCHOOL Important to all of us LOCAL FLORA & FAUNA Our neighbors are always welcome A VISIT FROM LOCAL CYCLISTS They are the future of the region EDUCATING THE NEXT GENERATION Keeping people and nature healthy DELIVERING PLANTS ESG Leadership Focus on health, education, and environment
  • 10. 10 Tristar Gold | TSXV: TSG | OTCQB: TSGZF Market Capitalization Retail Insider & Associates Institution 53% 11% 36% C$55 million Cash ~C$2.0 million Share Price C$0.195 52-Week Range C$0.07 – 0.24 Shares Issued 280 million Fully Diluted Shares 309.3 million Stock Options 9.1 million Warrants 20.3 million CAPITAL STRUCTURE *As of September 5, 2024 Tristar Gold | TSXV: TSG | OTCQB: TSGZF
  • 11. 11 Tristar Gold | TSXV: TSG | OTCQB: TSGZF TSXV: TSG | OTCQB: TSGZF PEERS SORTED BY MARKET CAPITALIZATION TriStar steps “right” on LP grant, but should move further… Sources: FactSet; Company reports; Lee, Zaunscherb & Associates Inc. Increasing Market Capitalization
  • 12. 12 Tristar Gold | TSXV: TSG | OTCQB: TSGZF TSXV: TSG | OTCQB: TSGZF GOLD PRICE vs MEAN EQUITY EV/OZ GOLD Gold equity valuations are responding to higher gold price Sources: FactSet, Company Reports, Lee, Zaunscherb & Associates Inc. estimates
  • 13. 13 Tristar Gold | TSXV: TSG | OTCQB: TSGZF TSXV: TSG | OTCQB: TSGZF DID MARKET BOTTOM IN OCTOBER 2023? Although it didn't feel like it, shorter and gentler than the average downward leg Sources: FactSet, TMX Group, Lee, Zaunscherb & Associates Inc.
  • 14. 14 Tristar Gold | TSXV: TSG | OTCQB: TSGZF TSXV: TSG | OTCQB: TSGZF A NEW BEGINNING? If a new bull market began in October 2023, we have a long way to go to the average… Sources: FactSet, TMX Group, Lee, Zaunscherb & Associates Inc.
  • 15. 15 Tristar Gold | TSXV: TSG | OTCQB: TSGZF Region INDICATED CATEGORY INFERRED CATEGORY Tonnes (Mt) Grade (g/t Au) Ounces (Moz) Tonnes (Mt) Grade (g/t Au) Ounces (Moz) Esperança South 29.0 1.3 1.2 10.0 1.2 0.4 Esperança East 5.0 0.8 0.1 12.8 0.7 0.3 Esperança Center 19.1 0.7 0.4 3.3 0.9 0.1 PROJECT TOTAL 53.1 1.0 1.8 26.0 0.9 0.7 Region Tonnes (Mt) Grade (g/t Au) Ounces (Moz) Esperança South 24.2 1.3 1.0 Esperança East 3.1 0.8 0.1 Esperança Center 11.4 0.8 0.3 PROBABLE RESERVES 38.7 1.1 1.4 MINERAL RESERVES all Probable Classification MINERAL RESOURCES Inclusive of Reserves Further details available in the October 5th 2021 press release entitled “TriStar Gold Announces Positive PFS with 1.4 Moz Gold Reserves and pre-tax 33% IRR and $400 million NPV” 15 Tristar Gold | TSXV: TSG | OTCQB: TSGZF
  • 16. 16 Tristar Gold | TSXV: TSG | OTCQB: TSGZF TSXV: TSG | OTCQB: TSGZF Chairman & Director Mark Jones III NEAR-MINE UPSIDE POTENTIAL Down – dip extensional potential: Needs to be tested with a “what if” analysis and optimisation sensitivity work to focus drilling Extensions between scheduled pits: E.g. Esperanca South (ES) Higher grade paleochannels have been identified and mapped: to be used for focused drilling down dip of ES and Arrias Strike extension potential: to the south and north of Esperanca South
  • 17. 17 Tristar Gold | TSXV: TSG | OTCQB: TSGZF TSXV: TSG | OTCQB: TSGZF ADDITIONAL TARGETS – UPSIDE POTENTIAL More than 50% of the known 16km strike length yet to be properly explored and evaluated. Untested gold-in-soil geochemical anomalies. Current outcrop represents the rim of a large basin and therefore there are deep targets for both down-dip paleoplacer and hydrothermal targets.
  • 18. 18 Tristar Gold | TSXV: TSG | OTCQB: TSGZF www.tristargold.com TSXV: TSG | OTCQB: TSGZF Nick Appleyard I Scott Brunsdon I Marcus Brewster I President & CEO CFO COO Scottsdale Office: +1 (480) 794-1244 [email protected] www.tristargold.com
  • 19. 19 Tristar Gold | TSXV: TSG | OTCQB: TSGZF $79 $171 $262 $353 $399 $445 $536 $628 $719 $811 12% 18% 25% 30% 33% 35% 40% 45% 50% 54% $1,200 $1,300 $1,400 $1,500 $1,550 $1,600 $1,700 $1,800 $1,900 $2,000 Pre-tax NPV5 US$ millions Pre-tax IRR% Gold Price (US$/oz) STRONG LEVERAGE TO GOLD PRICES PFS Sensitivity to Gold Prices >$2,000 Spot (Sept 2024) Please footnote 1 on Slide 2 for Disclosure