The document provides standard procedures for preparing 11kV and 6.6kV mains cables with single core copper wire screens or polymeric cables. It details how to remove the outer sheath and insulation screens, prepare the cable ends, and remove insulation. Key steps include using specialized tools to make spiral cuts in the sheath and insulation at marked points, unwinding wire screens and laying them back, and abrading or flame brushing areas of the cable.