The document provides instructions for removing the engine from MC60B and MC70B models. It is a 34 step process that involves draining fluids, disconnecting hoses and electrical connections, removing mounting hardware, and then lifting the engine out of the machine using an overhead hoist. Key steps include draining the coolant and transferring it to a storage container, disconnecting the fuel lines, radiator hoses, exhaust system, and harness connections, and then removing the engine mounts before lifting the engine free of the transmission shaft.