Consider the tasks T1(3, 0.5), T2(4, 1.5, 3), T3(7, 1.0, 5) and the EDF scheduler.

A sporadic job
arrives at t=50 having the execution time of 10 and a relative deadline of 30. Create the sporadic
task in SimSo by selecting:” generate task set” and then list of acts. Dates to the release time

• What is the minimum/maximum/average response time of all tasks?

• Is any task missing the deadline? Which task? Where?

NO, all the task didn’t miss the deadline.


• Is the sporadic job meeting its deadline?

No

• What is the response time for the sporadic job?

Response time is 29.00

Consider the tasks T1(3, 0.5), T2(4, 1.5, 3), T3(7, 1.0, 5) and the RM scheduler. A sporadic job
arrives at t=50 having the execution time of 10 and a relative deadline of 30. Create the sporadic
task in SimSo by selecting:” generate task set” and then list of acts. Dates to the release time :
• What is the minimum/maximum/average response time of all tasks?

• Is any task missing the deadline? Which task? Where?

Yes, the task 4.

• Is the sporadic job meeting its deadline?

Yes.

• What is the response time for the sporadic job?

The response time is 30.00

• Which scheduler is better is better in this example; EDF or RM?

EDF is better than RM