JS MoP Visit
JS MoP Visit
OBJECTIVES OF POWERGRID
The Corporation has set following objectives in line with its Mission and its status as Central Transmission Utility: - Undertake transmission of energy through Inter-State transmission system. - Discharge all functions of planning and coordination relating to Inter-State transmission system - Exercise supervision and control over the Inter-State transmission system. - Efficient Operation and Maintenance of Transmission systems. - Establish / augment and operate all Regional Load Despatch Centres and Communication facilities. Contd/-
OBJECTIVES OF POWERGRID
Contd/- To facilitate private sector participation in transmission system through Independent Private Transmission Company / Joint Ventures. - To assist various SEBs and other utilities in upgradation of skills & sharing of expertise by organising regular conferences, tailor-made training workshops directed towards specific technological and O&M areas and extending laboratory facilities for testing purposes etc. - Restoring power in quickest possible time in the event of any natural disasters like super cyclone, flood etc. through deployment of Emergency Restoration Systems. - To provide consultancy services at national and international level in transmission sector based on the in- house expertise developed by the organisation. - To participate in long distance trunk telecommunication business ventures.
POWERGRID Today
Incorporated in October, 1989. Commenced commercial operation from
April 1, 1992.
Notified as Central Transmission Utility in Dec 98. One of the largest and best managed transmission utility in the World with EHV network of over 46,000 ckm, wheeling more than 200 billion units (worth Rs. 40,000 Crore) per year - 40% of total generated power in the country. Sustained high system availability - about 99%. Consistently profit making.
POWERGRID Today
Rated EXCELLENT against MOU with MOP since 1993-94. Received The Prime Ministers MOU Award consecutively for 3 years since 1998-99. First ISO 9001 company in Indian Power Sector. Rated at the highest bracket by domestic credit rating agencies. During the FY 2002-2003, POWERGRID commissioned projects worth Rs 5,300 Crore. These projects were completed at a cost lesser by Rs 820 Crore than the GoI approved cost and ahead of schedule.
POWERGRID Growth
1992-93
39
2002-03 Growth(%)
79 102
Profile
Physical Performance
No. of Sub-stations
MVA capacity
Circuit kms Inter-regional transfer capacity (MW)
13,200
23,000 500
44,836
46,245 8,000
240
101 1500
No. of employees
from NTPC (with HVDC)
5,725
6,339*
11
transmission system. Functions of CTU and its privatisation. Role of CTU in Private Investment in transmission. Usage of transmission assets for telecom purposes. Open access to transmission system
In line with the worldwide trends, the main transmission agency should be responsible for system operation functions on permanent basis, i.e., CTU shall operate NLDC and RLDCs, while STUs shall operate respective SLDCs, in line with the current practice.
PRIVATIZATION OF CTU
The Act under clause 38(1) provide for a Government Company to be CTU. However, the Act under third para of clause 38(1), provides further that the Central Government may transfer, and vest any property, etc., of CTU, to a company or companies to be incorporated under the Companies Act, 1956 to function as a transmission licensee, through a transfer scheme. This provision militates against the very concept of having a Government-owned CTU.
license application shall be entertained by CERC unless the applicant has obtained the approval of CTU. The 2003 Act under clause 15(3) states that any person can apply directly to CERC for the License, with a copy to CTU for recommendations. However, such recommendations of CTU shall not be binding on CERC.
license should be entertained by CERC, unless the same is approved by CTU, in line with the existing provisions.
Duties of generating companies include dedicated transmission lines also. Captive generating plants may also set up dedicated transmission lines.
Directions corresponding to 18A of 1948 Act needed.
FUNCTIONS OF CTU
Undertake transmission of electricity through inter- state transmission system. Discharge all functions of planning and coordination relating to inter state transmission system. Ensure development of an efficient, coordinated & economical inter state transmission system. Provide non-discriminatory open access to its transmission system
FUNCTIONS OF CTU
POWERGRID was anyway performing almost all the functions, which the earlier amended statute & the Electricity Act 2003 bestowed upon the CTU. Notifying POWERGRID as CTU is thus a natural and logical step. Objectives of POWERGRID and the Statutory Role and Responsibilities of CTU go hand in hand and they are so much intermingled that they can not be separated.
: 2750
BE (2003-04) 2028.73 563.74 13.88 143.65 --------2750
Utilisation of Budget under the new schemes (Rs. 563.74 Crore) would largely depend on availability of investment approval of major projects like Sipat-I, Sipat-II, and Tala Transmission projects (about Rs. 343 Crore) - GoIs approval is awaited.
POWERGRID Perspective
Plan
24
Addition of 60,000 ckm of Transmission Network with an investment of Rs. 71,000 crores to evacuate additional 1,00,000 MW by 2011-12 Mobilising adequate financial resources (including private participation) for the implementation of the plan, while maintaining sound financial health of the company
POWERGRIDs own investment Rs. 50,000 Crore and balance Rs. 21,000 Crore from Private Sector
Creation of National Grid and enhancing interregional transfer capacity from the existing level of 8,000 MW to 30,000 MW by 2012
X Plan
XI Plan
11,185
Total
20,895
9,710
21,370
28,258
49,628
31,080
39,443
70,523
POWERGRID Perspective
A. Identified Funds : Internal Resources Development Surcharge X Plan 2,938 1,216
Plan
Total 8,019 3,083
Net Budgetary Support Committed ECB Domestic Fund tied up Total (A) B. Funds to be Mobilised: Total(A+B)
Multilateral
10%
70%
Diversification into
Telecom
utilize spare telecommunication capacity of ULDC schemes and maximize return on its transmission infrastructure
Through an incremental investment In a limited manner and without affecting the
core business
Foray into telecom recommended by reputed
international consultants viz. IVO Power Engineering, Finland along with PricewaterhouseCoopers, UK
OFC (Km)
830 613 961 887 1,431 941
Total
5,663
Delhi-Chandigarh;
Delhi-Lucknow-Mumbai; Delhi- Jaipur;
Perspective Plan
- Development of National Power Grid
Major Hydro resources in NER & NR Coal reserves mostly in Jharkhand / Orissa / West Bengal
Growth disparity ER surplus (Load did not grow as expected) Other regions deficit (Demand outstripped Gen. Cap. addition) Optimization of generation capacity addition Utilising time and seasonal diversity Spinning reserve optimisation Utilisation of operational surpluses Flexibility of adding IPPs along the National Grid
Cost of power transmission lower than cost of fuel transportation Transmission is more environment friendly than load centre based generation
Conservation of Right-of-Way -- especially in areas with scarcity of ROW viz. area near hydro projects, chicken - neck area, forest area, towns etc.
Development in a phased manner commensurate with generation / load growth. Flexible Plan to accommodate change in load-generation pattern. Detailed studies carried out in consultation with CEA to evolve system elements
Existing ER surplus and operational surpluses in the time frame of 2006 - 07 are to be transmitted over National Grid
Uncertainty in generation capacity addition can be fine tuned from time to time including impact of time & cost overruns, if any. National Load Dispatch Center envisaged by 2005 - 06 for coordinated operation of National Grid
POWERGRID Perspective
National Grid, Phase-I
Plan
Interconnection of Regional Grids through HVDC Back-to-Back and AC links to take care of widely varied operational parameters Development of phase-I of National Grid completed when Sasaram HVDC B/B Link between ER and NR was commissioned in Sept. 2002. Cumulative Inter-Regional Transfer Capacity estableshed at the end of Phase-I : 5,000 MW
POWERGRID Perspective
National Grid, Phase-II (by 2007)
Plan
Strategy: High capacity Inter-Regional Transmission Highways envisaged along with major generation projects Hybrid HVAC and HVDC interconnection planned Development of Phase-II of National Grid has already commenced - 3000 MW capacity added 2000 MW HVDC bi-pole between Talcher-Kolar (Asias largest HVDC Bi-pole) 1000 MW 400 kV AC link between Rourkela and Raipur (Facilitate Interconnection of ER/WR & NER Cumulative Inter-regional transfer capacity at the end of 2002-03 8000 MW By the end of Phase-II Cumulative Inter-regional Capacity - 23,500 MW
POWERGRID Perspective
Plan
After Phase-III
Cumulative Inter-regional Capacity - 30,000 MW
Private Sector
Participation
IPTC Route
Identified Project : 400 KV D/C Bina-NagdaDehgam Transmission line Estimated cost : Rs. 450 crore. Consortium of TNB & Kalpataru, the only bidder Tariff quoted is 77% higher compared to if the project to be undertaken by POWERGRID
Assistance
Sought
Madhya Pradesh, Maharashtra, Orissa, Delhi, Tripura, Arunachal Pradesh, Mizoram and Manipur have not signed the TPA for POWERGRID.
POWERGRID sought a budgetary support of Rs. 4,907 crore for an investment programme of Rs. 30,143 crore (considering Debt:Equity ratio of 70:30) Planning Commission scaled down the investment to Rs. 21,370 crore with Net budgetary support to Rs. 1,000 crore. (Debt:Equity ratio of 80:20)
Taking up the future incremental investment in the limiting debt-equity norm of 80:20 would create problems for the Corporation for fund mobilization
Further equity support of Rs 1257 Crore to maintain D:E ratio as 70:30. NBS to be made available in the form of Equity and not as Grant. Contd
One time upfront grant of Rs. 385 crores and Equated annual installment of Rs. 33.46 cr. during Xth plan period from 2002-03 to 2006-07 (or additional upfront grant of Rs. 120.60 cr.)
The proposal is being considered by Planning Commission. Some clarification on existing assets was sought by Planning Commission which has since been furnished.
transmission project to be granted Mega Power Project Status. It meets the criteria which are comparable to those specified for Mega Power Projects:
System forms part of National grid Catering power needs of more than one state Introduction of 800 kV state-of-the-art technology Involvement of huge investment Transmission of large block of power thus reducing ROW requirements Economy of scale on account of lower T&D losses To keep the tariff low for financially poor states
INVESTMENT APPROVAL
CCEA may approve a basket of projects, while individual project approval may be delegated to MoP. Pre-PIB limits to be raised from Rs. 500 Crore to Rs. 1500 Crore. PIB Memo may be circulated while circulating the FR itself. Investment approval for projects involving cost up to Rs. 1000 cr. may be delegated to Board of Directors of POWERGRID.
CERC through their notification reduced rate of depreciation from 6.12% to 2.91%, which is adversely affecting the financial position of the company CERC insists that FERV be capitalized and recovered as tariff by spreading it over the years. This is putting extra financial burden on POWERGRID due to mismatch in inflow and outflow, which will have direct impact on internal resources and capability to add capacity.
CEA has recommended 98% availability of transmission system to ensure grid stability and this norm should not be used for recovery of transmission charges.
Contd
Contd
OTHER ISSUES
The funding of Chandrapur HVDC B/B project includes ODA grant of about Rs 322 Crs
CERC, through its Tariff Order, has not allowed the ROE and Depreciation on Grant portion.
As POWERGRID has to maintain the asset and keep provision for its wear and tear, at least tariff components like Depreciation, O&M expenses and Interest on Working Capital may be allowed. GOI may notify the Tariff Policy at the earliest
OTHER ISSUES
Penal Interest @24% on cash equivalent of Deemed Export Benefits (Rs. 265 Crore) being refunded for Talcher-II project may be waived off by GOI to reduce the project cost. The proposal for declaring POWERGRID as Navratna, under consideration of DPE, may be expedited.
Thank You
FORMATION OF POWERGRID
Prior to formation of POWERGRID, various Central Sector Generating Companies e.g. NTPC, NHPC, NLC, THDC, NEEPCO, NJPC, NPC etc. were responsible for development of generation facility and the associated transmission system to deliver the power to the beneficiaries at their substations. As the capital outlay of generating plants was much more in comparison to associated transmission system, all the generating companies were giving more importance to generation facilities which led to bottling of power in some pockets.
FORMATION OF POWERGRID
These Generating companies were making efforts towards establishing generation facilities and associated evacuation systems, and no efforts were made by them to strengthen/augment Regional Grids/National Grid The transmission system not linked with the generation facilities were getting totally neglected To surmount these problems, Central Government in 1989 took a decision to establish POWERGRID for development of Regional/ National Grids
FORMATION OF POWERGRID
MANDATE Build, Operate & Maintain EHV AC and HVDC Transmission Systems including Load Dispatch Facilities under Central Sector.
MISSION Establishment and operation of Regional and National Power Grids to facilitate transfer of power within and across the regions with Reliability, Security and Economy, on sound commercial principles.
Present
2011-12
OPERATIONAL PERFORMANCE Sustained high system availability - over 98% for last 10 years despite limited / no redundancy in the network, through adoption of latest techniques including: Hot Line Maintenance Emergency Restoration System Regular Preventive Maintenance
Thermo-vision
Scanning Condition Monitoring of Equipment Gas & Insulating Oils Testing Facilities. Stringent Quality Control Measures
Technological
Excellence
Technological Excellence
Application of Series Compensation to improve power transfer capacity (Kishenpur-Pampore, Kanpur-Ballabgarh, Panki-Muradnagar, RourkelaRaipur etc.)
Upgrading of Lower Voltage Lines to Higher Voltage - 66 to 132 KV, 132 KV to 220 & 400 KV, 220 KV to 400 KV, 400 kV to 800 kV
Uprating of transmission lines by enhancing Conductor Temperature Limit - From 75C to 85 C resulting in approx 30% increase in power capacity with approx. 1% increase in cost of line
Composite Long Rod Insulators for better performance
Technological Excellence
Flexible AC transmission systems Multi Conductor Transmission Lines Bundle, Multi Circuit in
(developed
Sub-station automation
Compact Air Insulated Sub-stations / Gas Insulated Sub-stations Inhouse standardisation foundation design of towers and
Policy
developed through detailed interaction with the Public, NGOs, Project Affected Persons, Financial Institutions, Government agencies, etc.
strictly adhered to in all transmission projects
Being
DISASTER MANAGEMENT
Evolved most effective Disaster Management System to minimize the impact of natural calamities like floods, cyclones, Earthquake etc.
Accolades
Engineering Specifications, Contract and Project Management, Contract documents has been of excellent quality
- International Consultants to The World Bank, Nov. 96
Although there is frustration on the part of Cobra, a review of the issues does not indicate unfairness or mismanagement on the part of POWERGRID. This contract is properly managed by POWERGRID with no evidence of unfairness.
- International Consultants to The World Bank
Comments : Others
POWERGRID represents an exciting mechanism to centralise Indian Power structure on a national basis. ADB welcomes POWERGRID and look forward to working with it in the future. Imagination is needed in planning POWERGRIDs future and its management appears to be truly abreast of them.
- Asian Development Bank, Feb. 2000
Here is an organization that meets its commitments and values time. I wish there are more organizations with a similar outlook
- Dr. Shankar Sen, Former Vice Chancellor, Jadhavpur University & The former Power Minister, WB Govt.
POWERGRID Perspective
Plan
(Rs Crore)
Funding Plan
Internal
Total
49,628
BUDGET UTILISATION
(In Rs. Crores)
: 3352 : 2687
RE
(2002-03)
Actual
(2002-2003)
2445 50 66 ----------2561
* Shortfall for want of Investment Approval for Tala & Sipat transmission projects and delayed approval of Telecom Project & Raipur-Chandrapur Trans. Sys.. BPTA for RaipurChandrapur is yet to be signed as SR beneficiaries went back on their commitments.
OBJECTIVES OF POWERGRID
The Corporation has set following objectives in line with its Mission and its status as Central Transmission Utility:
- Undertake transmission of energy through Inter-State transmission system. - Discharge all functions of planning and coordination relating to Inter-State transmission system with (i) State Transmission Utilities; (ii) Central Government; (iii) State Governments; (iv) Generating companies; (v) Regional Electricity Boards; (vi) Authority; (vii) Licensees; (viii) Transmission licensees; (ix) Any other person notified by the Central Government in this behalf. Contd/-
Cost in Rs. Cr. Ant. Commn. Appd. Ant. Meramundali - Jeypore 167 143 May03 Series Compensation on 26 26 Aug03 Panki Muradnagar Tehri Trans. System 702 702 Line I - Sep03 * Line II- Dec03 * ULDC Scheme in NER 264 264 Jun03 Bihar Grid Strengthening 163 163 Jan04 Madurai Trivandrum 196 196 Mar04 KahalgaonBshariff (II Ckt) 136 136 Apr04 Tala-Siliguri 232 232 Dec04** ULDC Scheme in ER 397 397 Dec04
Clearance regarding Rajaji National Park obtained from Supreme Court in Oct02. ** Matching with Tala HEP
Contd
Contd
Cost in Rs. Cr. Ant. Commn. Appd. Ant. Aug. of Gajuwaka B/B Project (Gajuwaka-II) 769 Dhauliganga Trans. System 151 System strengthening Scheme 110 in Western Region Ramagundam- III 390 Tarapur 3 & 4 Trans. System 237 Rihand-II Trans. System 1044 ULDC WR 262 Dulhasti Combined Tr. System 567
390 Aug05 237 Sep05 1044 Aug05 235 Mar06 567 Jul06
Rs/Crs
68,023 19,634
3,192 41,875 1,016 204 2,102 2,500 1,004 1,496 70,523
Total
28,840 12,340
3,192 12,005 1,016 204 83 2,240 1,004 1,236 31,080
B. Telecom
Base Network Equity in NLDO & JV
2,019 260
260 39,443
Total (A+B)
POWERGRID FUNDING Internal Resources Development Surcharge Bonds/Domestic Loans Foreign Borrowings IEBR Net Budgetary Support Equity From External Source Total
X & XI Plan 7039 3966 39493 16925 67423 1000 2100 70523
Series Compensation on Panki-Muradnagar Meerut-Stabdinagar LILO Of Panki-Naubasta (Feroz Gandhi Unchahar TL-II) Mehramundali-Jeypore ICT at Biharshariff (Bihar Grid Strengthening) Ranganadi-Ziro TL Bongaigaon-Malda at Purnea Purnea-Dhalkhola ULDC North-Eastern Region already commissioned
Diversification into
Distribution
POWERGRID Diversification
Diversifying into Distribution
MOP assigned 37 circles in 15 states to POWERGRID as advisor-cum-consultant under APDRP Also entrusted co-ordination of other 14 circles assigned to NPC, WAPCOS and ERDA & 54 circles being developed by SEBs. Separate Subsidiary contemplated for:
Sub-transmission Distribution
87
Companies system
being
system
POWERGRID Diversification
Benefits to SEBs : Improvement in Reliability and Reduction in outages Increase in Revenue
Remote
Average
billing for domestic consumers followed by six monthly reconciliation no. of collection centres
Increased Use
Enforcement
POWERGRID Diversification
POWERGRIDs Strategy is based on High growth potential in the business in line with the core competence. Commitment of Govts. for reforms with fund allocation under APDRP scheme. Association with SEBs as AcC in 33 circles in 16 States under APDRP scheme. Leveraging its vast human resources and knowledge base Leveraging its rapport with GOI and SEBs Leveraging its strong Balance Sheet as comfort to lenders, who are shying away from SEBs Leveraging its IT enabled infrastructure for better management of distribution network Employees participation as equity stake holders to the extent of 26% in the Subsidiary Company
POWERGRID Diversification
Reputed Domestic consultant appointed to formulate the business strategy Recommendations of the consultant : Separate subsidiaries for Sub-Transmission and Distribution business and strategic alliance with SEBs Business Models for Transmission Build - and Transfer Build Lease Operate and Transfer Contract Add - and Operate Rehabilitate Operate and Transfer Business Models for Distribution Licensing Agreement with Tariff based on fixed rate of return Licensing Agreement with Performance based Tariff Energy Performance Contracting
POWERGRID Perspective
Resource Mobilization
X Plan
Plan
XI Plan
Total
Internal Resources
2,938
5,081
8,019
Development Surcharge
Bonds/Domestic Loans Foreign Borrowings IEBR Net Budgetary Support
1,1216
8,002 8,214 20,370 1,000
1,867
14,917 6,393 28,258 0
3,083
22,919 14,607 48,628 1,000
Total
21,370
28,258
49,628
POWERGRID Perspective
X Plan A. Transmission
Generation Linked Projects Grid Strengthening Projects Inter-regional /Inter Country Links ULDC Projects Investments in JV
Plan
Rs/Crs
Total 47,129 11,456 3,192 29,159 1,016 204
POWERGRIDs Investment
XI Plan 27,999 5,945 5,420 14,615 19,130 7,436 3,192 7,199 1,016 204
Others
83
2,240 1,004
2,019
260
2,102
2,500 1,004
B. Telecom
Base Network Equity in NLDO
1,236
21,370
260
28,258
1,496
49,628
Total (A+B)
Current Funding from World Bank, ADB, JBIC, European Investment Bank, KfW etc. to the tune of US $ 1,500 Million Presently outstanding loan from IFI is 5055% of Total Borrowing Funding from Multilateral agency to go down due to their policy not to fund Gen. Linked projects. Future Funding envisaged at Rs. 9,400 Crore (about 30% of funding gap)
To minimise the future risk capital structure for projects need to be at least 70:30
Contd.
NR
AURAIYA
NER
500 MW
MALANPUR
500
SAHUPURI
MW
DEHRI
BUDHIPADAR
ER
WR
KOLHAPUR
1000 MW
BALIMELA
500 MW
U.SILERU GAZUWAKA
EXISTING
BELGAUM
UNDER CONST.
EXISTING 400 kV
SR
DW EE P
220 kV
N ANDAMA R NICOBA
LA KS HA
Back
&
URI
KISHENPUR
JULLANDHAR MOGA BALLABGARH (DELHI RING) HISSAR LUCKNOW BHIWADI M'BAD ALLAHABAD /UNNAO MALANPUR SINGRAULI 500MW B'SHARIF KAHALGAON /BARH DEHGAM NAGDA BINA SATNA SEONI SIPAT KORBA RAIPUR CHANDRAPUR 1000MW HIRMA VINDHYACHAL N.K. KRISHNA NAGAR ROURKELA G'PUR PURNEA VARANASI SILIGURI/BIRPARA A'PUR MEERUT TEHRI
CHICKEN NECK
BHUTAN
TEESTA TALA RANGANADI KATHALGURI MARIANI MISA BONGAIGAON
NR JAIPUR
SHIROHI
300 0M W
ZERDA
LIMBDI JETPUR
PIPAVAV BOISAR
DHABOL KOYNA
LONIKAND KARAD
WR SR
20 00 M W
TALCHER JEYPORE
ER
RAMAGUNDAM GAZUWAKA LEGEND EXISTING/ IX PLAN VIJAYAWADA 765 KV LINES KRISHNAPATNAM CHITTOOR 400 KV LINES HVDC B/B HVDC BIPOLE X PLAN
KOLHAPUR
PONDA KAIGA
NARENDRA SIRSI
MANGALORE BANGALORE KOZHIKODE HOSUR SOUTH CHENNAI SINGARPET CUDDALORE PUGALUR KARAIKUDI KAYAMKULAM TRIVANDRUM KAYATHAR
LA P EE DW HA KS
COCHIN
Back
URI
KISHENPUR
JULLANDHAR MOGA BALLABGARH (DELHI RING) HISSAR LUCKNOW ARUN G'PUR PURNEA VARANASI 500MW B'SHARIF KAHALGAON /BARH DEHGAM NAGDA BINA SATNA SEONI SIPAT KORBA RAIPUR CHANDRAPUR 1000MW MW 00 20 HIRMA VINDHYACHAL N.K. KRISHNA NAGAR ROURKELA SILIGURI/BIRPARA BHIWADI M'BAD AGRA ALLAHABAD /UNNAO MALANPUR SINGRAULI A'PUR MEERUT TEHRI
CHICKEN NECK
BHUTAN
TEESTA TALA RANGANADI BONGAIGAON
NR JAIPUR
SHIROHI
300 0M W
ZERDA
LIMBDI JETPUR
PIPAVAV BOISAR
DHABOL KOYNA
LONIKAND KARAD
WR
AMRAVATI
TALCHER JEYPORE
ER
RAMAGUNDAM
KOLHAPUR
SR
20 00 M W
NARENDRA SIRSI
GAZUWAKA
VIJAYAWADA 765 KV LINES KRISHNAPATNAM CHITTOOR 400 KV LINES HVDC B/B HVDC BIPOLE
PONDA KAIGA
MANGALORE BANGALORE KOZHIKODE HOSUR SOUTH CHENNAI SINGARPET CUDDALORE PUGALUR KARAIKUDI KAYAMKULAM TRIVANDRUM KAYATHAR
LA D HA KS EP WE
N AND ANDAMA R
COCHIN
Back
NICOBA