0% found this document useful (0 votes)
148 views

Project Scheduling and Resource Levelling

The document discusses the importance of proper project scheduling and resource leveling for project managers. It outlines the key steps to take which include developing a work breakdown structure, establishing task dependencies, estimating work and durations, assigning resources, leveling resources, determining the critical path, and considering resource calendars. Following these steps can help project managers avoid common mistakes and issues with scheduling and resource allocation.

Uploaded by

tkurasa
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
148 views

Project Scheduling and Resource Levelling

The document discusses the importance of proper project scheduling and resource leveling for project managers. It outlines the key steps to take which include developing a work breakdown structure, establishing task dependencies, estimating work and durations, assigning resources, leveling resources, determining the critical path, and considering resource calendars. Following these steps can help project managers avoid common mistakes and issues with scheduling and resource allocation.

Uploaded by

tkurasa
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Project Scheduling And Resource Levelling

By Jorge Dominguez
We all know that in the real world we, as project managers, are
given the finish date of the project before we even have a chance
to plan for it. This is a good enough reason why we need to get
better at scheduling our projects and levelling our finite
resources.
Sure, there are tools that allow us to automate the process, but a
tool is as good as the knowledge of those who use it. All in all,
project managers have a tool and a method by which we create
our project schedules. But, we all suffer from common mistakes such as having the wrong
dependencies, excessive constraints, inadequate level of detail in the WBS, estimates too
granular or nonexistent, over allocated resources, etc. Ring a bell?
The tool that is most widely used is MS Project (MSP). And I am not going to take the time
in this article to talk about MSP since this is not the topic. I will, however, mention it as it
applies to project scheduling and resource levelling.
The method is what changes from project manager to project manager. I will explain the
"must do" steps and in the correct order.
Develop the WBS
Most organisations have a hierarchical structure to break down the work. Typically, it looks
like this: Stage, Phase, Task/Deliverable/Milestone. This is a way to organise and define the
total scope of the project by decomposing the work to be done into tasks that the project
team can execute and create the required deliverables. The tasks, deliverables or
milestones are components that can be scheduled, cost estimated, monitored and
controlled.
Establish Dependencies
Dependencies are defined so that the work is executed in the proper order. Understand the
following task dependency types before you use them; incorrect dependencies will impact
the finish date of your schedule and create unnecessary constraints:
Mandatory (hard logic) - Inherent in the nature of the work being done. They often
involve physical limitations i.e. a test case must be defined before testing.
1.
Discretionary (soft/preferred/preferential logic) - Based on experience, desire or
preferences i.e. the team decides that they will create the user manual after the first
round of testing, although it is not necessary.
2.
External - Based on needs or desires of a party outside the project i.e. the server
must be purchased before configuring.
3.
A network diagram is used to show dependencies in a graphical form. MSP generates a
network diagram automatically.
Work is the number of labour units (usually expressed in hours, days or weeks) required to
1
complete a scheduled task. Estimation is equivalent to success. Duration is the total
number of work periods (usually expressed as days or weeks) required to complete a
scheduled task. When estimating, keep in mind the different task types:
Fixed units (MSP default) - Allows the schedule to calculate the finish date ASAP
based on resource availability.
1.
Fixed duration - Used when the priority is to preserve duration. To complete work,
assign resources as needed to satisfy the finish date, remember my comment about
"knowing" the finish date before we even plan?
2.
Fixed work - Some project management systems (i.e. Clarity, formerly Niku) that sit
on top of MSP don't support this type because of the effort driven nature of it and the
unpredictable results it may create. So, I have chosen to get used to not using it at all.
3.
This is how task types work:
Task
Type
Revise Duration Revise Work Revise Units
Fixed
Units
Work is recalculated,
and units are fixed.
Duration is recalculated,
and units are fixed.
Duration is
recalculated, and work
is fixed.
Fixed
Duration
Work is recalculated,
and duration is fixed.
Units is recalculated,
and duration is fixed.
Work is recalculated,
and units are fixed.
Task constraint is the next item we need to look at when estimating. You must avoid using
moderate and inflexible types. Wrong constraints increase the project risk and extend the
finish date:
As late as possible (flexible; default) - For projects scheduled from the finish date.
Schedules the latest possible start and finish dates for the task.
1.
As soon as possible (flexible; default) - For projects scheduled from the start date.
Schedules the earliest possible start and finish dates for the task.
2.
Finish no earlier than (moderate; avoid) - For projects scheduled from the start date.
Indicates the earliest possible date that the task can be completed, and the task
cannot finish any time before the specified date.
3.
Finish no later than (moderate; avoid) - For projects scheduled from the finish date.
Indicates the latest possible date that the task can be completed, and the task can be
finished on or before the specified date.
4.
Start no earlier than (moderate; avoid) - For projects scheduled from the start date.
Indicates the earliest possible date that the task can begin, and the task cannot start
any time before the specified date.
5.
Start no later than (moderate; avoid) - For projects scheduled from the finish date.
Indicates the latest possible date that the task can begin, and the task can start on or
before the specified date.
6.
Must finish on (inflexible; avoid) - Indicates the exact date on which the task must
finish. Other scheduling parameters such as task dependencies, lead or lag time, and
resource levelling become secondary to this requirement.
7.
Must start on (inflexible; avoid) - Indicates the exact date on which the task must
begin. Other scheduling parameters such as task dependencies, lead or lag time, and
resource levelling become secondary to this requirement.
8.
Assign Resources
Resources (typically human) are assigned to tasks, deliverables and milestones that need to
be executed. At the beginning of the project, when named resources are not known yet,
roles are assigned that can later be replaced with names i.e. the role of Analyst is assigned
2
to a task during project scheduling and is later replaced with John Doe when he is the
analyst assigned to the task.
Level Resources
Helps in utilising resources consistently throughout the project. Ensures resources are not
over allocated. Helps the project manager avoid delays caused by bad allocations. Helps the
project manager identify and take advantage of unused times by analysing task
dependencies. MSP can automatically level resources based on resource calendar, task
types, dependencies, and constraints, however, I have yet to find a project manager that
has felt comfortable with the way MSP does it. I level resources manually via the Resource
Usage view, but if you insist in using the automatic feature of MSP, save a copy first. If you
find resource conflicts (over or under allocations) you could:
Delay certain tasks. 1.
Assign a different resource. 2.
Change task dependencies. 3.
Remove tasks. 4.
Add tasks (instead of using the MSP's split task functionality, which is not supported by
some project management systems i.e. Clarity).
5.
Determine the Critical Path
Helps the project manager identify tasks that must be carefully monitored. The critical path
is the longest duration path through a network diagram and it is the shortest path to
complete the project. Knowing the project's critical path should be the goal of the
scheduling process. MSP calculates the critical path automatically and through the Gantt
chart it shows what tasks are in it. One thing to keep in mind is that as tasks are completed
ahead or behind schedule the critical path changes. Another is that there can be more than
one critical path but this increases risk. If the critical path takes your project's finish date
way too far there are a couple of techniques that project managers can use to compress the
schedule:
Fast tracking - Perform critical path tasks in parallel that were originally planned
sequentially. It usually increases risk and often results in rework.
1.
Crashing - Assign additional resources to critical path tasks while maintaining scope.
Almost always results in increased costs.
2.
As project managers, we forget a very important intangible: resource calendars affect
project scheduling. Public holidays or time off in a resource's calendar makes those days
non-workdays and therefore, MSP skips them altogether.
If you follow the basic steps explained in this article you should not have major problems
with scheduling and resource levelling. Don't you think so...? Well, I do.
Jorge Dominguez wrote the article "Project Scheduling And Resource Levelling" and
recommends you visit www.Expiriance.com for more information about project
management.
Project Smart 2000-2010. All rights reserved.
3

You might also like