0% found this document useful (0 votes)
119 views

Deviation Request Form

The document is a request for acceptance of a deviation from product specifications for piston rods being supplied to ITT KONI. Specifically, it requests to allow a minimum diameter of 19.732 mm instead of the specified 19.737 mm due to process limitations. If approved, the deviation would be valid for a certain period and quantity. Corrective actions proposed include 100% inspection after processing. A decision to approve or reject the request, along with any conditions, would be provided in the document.

Uploaded by

BHUSHAN
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
119 views

Deviation Request Form

The document is a request for acceptance of a deviation from product specifications for piston rods being supplied to ITT KONI. Specifically, it requests to allow a minimum diameter of 19.732 mm instead of the specified 19.737 mm due to process limitations. If approved, the deviation would be valid for a certain period and quantity. Corrective actions proposed include 100% inspection after processing. A decision to approve or reject the request, along with any conditions, would be provided in the document.

Uploaded by

BHUSHAN
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

OBSC TITLE: DEVIATION ACCEPTANCE DOC.NO.

OPPL/F/QA/13

PERFECTION PVT NOTE


LTD
THE FOLLOWING DEVIATION MAY KINDLY BE GRANTED TO US.THIS SHALL BE STRICTLY
APPLICABLE FOR THE PERIOD OF MONTHS OR FOR QUANTITY NOS W.E.F.
DAN NO. : -12
THE PRODUCT UNDER DATE. : -11.01.2023
DEVIATION SHALL BE
SUITABLY IDENTIFIED

1 CUSTOMER : ITT KONI

2 PRODUCT : Piston Rod

3 SPECIFICATION : Specification according to STD KN0203 Rev K, Ø19.737 mm

4 DEVIATION REQUESTED : Deviation Required Diameter minimum Ø19.732 mm

5 REASON : Due to the process limitation.

6 REQUESTED BY NAME : Bengali S.


& SIGNATURE
7 DATE 11.01.2023

REF: QUALITY PLANNING


DOCUMENT NO :-
PLANNED CORRECTIVE ACTION : 1.100 % inspection after hard chrome plating & grinding

EXPECTED DATE OF : 12.01.2023


COMPLETION

RESPONSIBILITY : Ranjeet Singh

DATE : 12.01.2023
APPROVED /REJECTED :

IF APPROVED FOR PERIOD :

QUANTITY :

AUTHORISED SIGNATORY :

DATE :

INFORMATION TO CUSTOMER: - YES/NO. IF YES REF.NO./DATE :

ISSUE Dt:-02/10/2017
REV.NO. : 00
REV. DT. :00 PREPARED BY – Bhushan L APPROVED BY – Bangali S.