PM Form
PM Form
Status Cluster Owner Site Topology Maintained By BTS Type PM Performer Site Sharing Sharing status OMO DG shared DC shared Tower hight Asset Verification DG count DG Type DG rating DG Make Engin make Asset Tage DG S/N DG OPR Status Fuel Tank capacity No BB installed BB back up time Any Faulty battery at Site Count of faulty Batteries No of Rectifier installed Total Rectifier count faulty rectifier count Surge Arrester Status ACDB connection and breaker working Value
Value
CP Voltage L-N on three Phases CP Voltage L-1 CP Voltage L-2 CP Voltage L-3 LC instaled Y/N LC Make LC Input range V LC status IC installed IC status Aircon installed Aircon Qny Aircon Soket By passed with out joint No of Fire Extinguisher at site Fire extinguisher Status FSS available FSS in working condition Solar Power System Total count of solar panels Rating of solar panels Count of faulty panels All solar panel cleaned Total solar charge module count Faulty solar charge module count Solar alarms are working BTS health check count of service effecting alarms on site BTS connected on first shut down Weather proofing checked No physical alarm on BTS card Labeling and tagging Rf cables rounting RF connectors checked BTS and equipment cleaned Any faulty BTS card on site MW Vsat TXN MW installed MW NMS RSL
Value
Value
Value
MW IF cables and connectors weather proofing MW connected on BLVD MW cleaning Design HW Redundancy Redundancy Labeling and tagging Dish Size M Dish bracing Power Status Redundancy check Any MW HW alarm General Site work safety Grounding Value Grounding of Equipment Transformer Type Transformer rating KVA Site boundary wall and gate Guard status Site Access Owner and Guards issue Site cleaning External alarms CP failure Rectifer input failure DC low voltage DG in OPR DG low Fuel DG fail to start Fire /Smoke High Temperature BTS door open Rectifer cabinet door open Rectifer failure
Value
Current status
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks