0% found this document useful (0 votes)
10 views

Ms Excel Project

The document outlines an Excel project with three parts: data visualization, central tendency and dispersion calculations, and regression analysis. Students will collect real-world data from sources like Moneycontrol or RBI with at least 50 data points in two columns, analyze the data visually and numerically, and perform regression. The project is divided into steps with deadlines in October and November and will be submitted as a single Excel file.

Uploaded by

medha
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views

Ms Excel Project

The document outlines an Excel project with three parts: data visualization, central tendency and dispersion calculations, and regression analysis. Students will collect real-world data from sources like Moneycontrol or RBI with at least 50 data points in two columns, analyze the data visually and numerically, and perform regression. The project is divided into steps with deadlines in October and November and will be submitted as a single Excel file.

Uploaded by

medha
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

MS EXCEL PROJECT 1 – PROJECT DRAFT

BBA – SEM I
Topic - Graphical & Central tendency
Total Marks - 30
Part 1 - Visualisation ( 10 Marks)
Part 2 Central tendency & dispersion (10 Marks)
Part 3 Regression (10 Marks)
Marking scheme Excel project 1 (Total Marks - 30)
The final excel report will have three parts
Take any two sets of data for computation of the following
Part 1 : Visualisation (line , bar , pie, scatter , ogives , histogram or any other advanced
formats) using your data with explanation on why the graph is a right choice for your data
and inferences about the pattern represented in the graph
 1 chart (3) + interpretation (2) – 5 marks
 2nd chart (3) + interpretation (2) – 5 marks
Part 2 : Use the data to create a frequency table with class intervals, create table and
calculate the mean, median, mode , quartiles , and either percentiles/ deciles and QD, SD,
CV, Range, Mean deviation
 Mean Median Mode (3) - 2 marks for calculation – 1 mark for interpretation
 Percentiles / deciles (2) – 1 marks for calculation 1 mark for interpretation
 QD and coefficient / SD and CV– (5) 3 marks for calculation –2 mark for
interpretation
Part 3 – Scatterplot and Regression - (10 Marks)
Submission date – October to November
 12th Preliminary discussion for data – chat in the channel or file submission
 18th finalising data
 25th Part 1
 28th Part 2
 November final submission with regression
Submission format – Ms excel file
Please submit a single final file under your channel posts and files section
Description
Make groups of 5 each and prepare an Ms Excel based report as below
Collect real time data with at least 50 points or 50 rows of data and two column -
some possible sites - Moneycontrol , RBI , IMF , World bank .Other than these
sources, some possible links are given below under section useful data links. You can
also collect from other sources, but please ensure authenticity of the data.
Sports data – compare between teams or counties. (Duration played and runs scored )
You can also choose any two variables of 50 each and choose to plot a scatterplot of
the same as long as the variables have a logical association. Eg - currency & gold,
data from two countries, comparison between two companies etc

Useful Data links
https://catalogue.data.gov.bc.ca/dataset?tags=student&res_format=xlsx
https://public.tableau.com/s/sites/default/files/media/moredatasets.xlsx - This link has
further links to around 30 sites of public data

You might also like